KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  7-21-2008
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Drill doubler plate in fuel tank outboard rib.

Here I just drilled a doubler plate in the fuel tank outboard rib. The plans say 3 or 4 rivets will do. I was tempted to put 6 like the doubler plate at the opposite end of the tank. This guy will be riveted later when the tank is sealed.
' style=

Inboard side.

Inboard side.

' style=

Outboard side.

Outboard side.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.