KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  7-14-2008
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Drill the T-405 rivet holes.

Need to drill through the T-405, Rib and T-411. Care must be taken in placement of the rivets so they don't interfier with the gas line fittings. I'm using a flop tube and it attaches in the center of these 6 rivets with a 9/16" hole. You can't see it but I traced the gas line fitting on the T-405 to see the clearence between the fittings and rivets.

I marked the hole locations on the T-411 and camped all 3 pieces together.

Image 1 shows them clamped together and the blue hole locations.

Image 2 and 3 show the drill press setup for drilling the 6 rivet holes.
' style=

Pieces clamped and marked.

Pieces clamped and marked.

' style=

Clamped to drill press.

Clamped to drill press.

' style=

Ready to drill.

Ready to drill.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.