KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  3-4-2008
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Gas Tank Z Bracket Prep Part 4.

Here you can see the riveting process. Not sure why I'm using this yoke. It just happened to be the yoke that was on the thing. The rivet is not in the center of the rivet set but it doesn't matter. I used a cleco on one side as I rivet the other.

All 12 brackets done with a total of 36 nut plates. Dang.
Remeber the most in board bracket does not get nut plates.

I used four power tools at the same time.
1. Air drill with #40 drill bit.
2. Cordless drill with #9 drill bit.
3. Electric drill with counter sink.
4. Air rivet setter thing.
' style=

Set the nut plate attach rivet.

Set the nut plate attach rivet.

' style=

36 nut plates attached.

36 nut plates attached.

' style=

The end of Z bracket nut plates.

The end of Z bracket nut plates.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.