KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  7-31-2009
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Drill pilot holes through F-717 and lower Longeron

I located the holes on the weld mont and then drilled a #40 pilot hole. Then I clamped the lower longeron in place and drilled it from underneath through the weld mont using my angle drill. This procedure has assured me that the weld mont holes are where I want them.

Shown is 3 clamps holding the top of the longeron against the weld mont. Not shown but very important is a clamp holding the sides of the two together.
' style=

#40 pilots drilled.

#40 pilots drilled.

' style=

Longeron clamped.

Longeron clamped.

' style=

Longeron drilled.

Longeron drilled.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.