KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  4-20-2009
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Longeron - Drill 721 canopy Deck to Longeron.

Starting at the forward end I clamped and drilled. The first 10" or so has no curve so it's easy to alaign flush and start drilling. Then move the clamps down 10" or so, checked for flushness and drilled some more.

The end result was a very nice fit. I'm very happy with it. My eye and finger nail detects near perfect flushness. Oh good.
' style=

Start at forward end.

Start at forward end.

' style=

Drilled and flush.

Drilled and flush.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.