KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  5-27-2011
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Debur and finally rivet the tie down bracket.

With all 6 holes enlarged to 3/16” its time to remove the VS, debur and rivet on the tie down bracket. With the VS removed I’m pointing to one of the 4 rivets I’ll buck to hold on the tie down bracket. Image 2 and 3 are looking inside the bulk head and you can see the tie down bracket. The tie down bracket is held firmly with the 4 bolds for riveting.
' style=

Pointing to 1 of 4 tie down rivets.

Pointing to 1 of 4 tie down rivets.

' style=

Tie down bracket inside fuselage.

Tie down bracket inside fuselage.

' style=

Tie down bracket inside fuselage.

Tie down bracket inside fuselage.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.