KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  2-24-2010
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Join fore/aft F-721 canopy decks

Time to join the fore and aft canopy decks. The little tab on the aft deck gets bent and then match drilled to the foreword deck.

Image 3 shows he fore/aft canopy decks and gussets dimpled and finished off ready for priming.

Not shown is counter sinking the forward canopy deck holes in the longerons.
' style=

Bend forward tab on aft deck.

Bend forward tab on aft deck.

' style=

Match drill tab through forward deck.

Match drill tab through forward deck.

' style=

Canopy deck resady fro primming.

Canopy deck resady fro primming.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.