KitLog pro

Powered By Kitlog Pro v2.0

Mikes RV-9A Web Site
' style=
Date:  12-2-2007
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Canopy FG Fairing layup done

Applied second layer of flox, then layed up 3 plys of RAF BID glass tape. Layed peel ply over layups. By keeping the garage at 70+ the rest of the day, but this evening it should be tack free, then I can remove the peel ply and coat with generous coat of dry micro. THEN the elbow grease is put to work a couple days later after fully cured.
' style=

Coated with flox to ensure full adhesion of fiberglass tape

Coated with flox to ensure full adhesion of fiberglass tape

' style=

First ply of tape layed in place.

First ply of tape layed in place.

' style=

Three plys of FG tape in place with peel ply overtop.

Three plys of FG tape in place with peel ply overtop.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.