KitLog pro

Powered By Kitlog Pro v2.0

Mikes RV-9A Web Site
Work Logs Found: 135
Category Work Time: 262 Hours
 Date
Hours
Work Log Summary

Details

 07-21-2010
1.00
Top Cowl ramp modification
Details
       

 02-04-2010
1.00
Tow bar setup
Details
       

 01-31-2010
1.00
Nose strut to Cowl fairing fit up
Details
       

 01-31-2010
1.50
Nose pant strut fairing
Details
       

 01-31-2010
1.50
Nose gear fairing fiberglassing
Details
       

 01-23-2010
1.00
Torque prop, misc
Details
       

 11-18-2009
2.00
Spinner bulkhead nut plates
Details
       

 11-14-2009
3.00
Spinner fitup complete
Details
       

 11-14-2009
1.50
Spinner back cover
Details
       

 11-10-2009
1.00
Fuel pp test & leak check - SAT
Details

 11-09-2009
1.00
Spinner
Details

 10-30-2009
1.00
Spinner prep
Details

 10-29-2009
0.70
FW hole & Spinner
Details

 10-27-2009
2.00
Fire sleeve & instrument testing
Details

 10-23-2009
3.00
Cowl louvers & wiring & labeling
Details

 10-21-2009
1.50
Cowl Air louver
Details
     

 10-20-2009
1.50
Engine Baffle Seals completed
Details
       

 10-20-2009
1.50
Bottom cowl inlet baffle seals - ALL DONE
Details
       

 10-19-2009
1.50
More baffle seal progress
Details
       

 10-14-2009
1.50
Rubber Baffle Mtl
Details
       

 10-13-2009
0.70
Cabin Heat hose
Details
       

 10-12-2009
2.00
FW Pene Seals & Mag Harness
Details
       

 10-11-2009
3.00
EGT-CHT hookup, Canopy T-Handle
Details
       

 10-10-2009
1.50
Left baffle tension rods
Details
       

 10-10-2009
2.00
EGT/CHT probes. Fuel line re-route.
Details
       

 10-10-2009
1.00
Blast tube cooling for Mag & Alternator
Details
       

 10-04-2009
2.00
Baffle Tension Rods
Details
       

 10-03-2009
3.00
Oil Cooler mounted
Details
       

 10-03-2009
3.00
LSE Elect coil wiring
Details
       

 10-02-2009
2.50
Left side baffle final fit to engine
Details
       

 09-29-2009
1.50
Rt baffle final install
Details
       

 09-29-2009
0.50
Prop oil baffle grommet
Details
       

 09-28-2009
2.00
Baffle final fit
Details
       

 09-27-2009
1.50
Determining top baffle gap
Details
       

 09-26-2009
3.00
Top timming
Details
       

 09-24-2009
1.50
Top Baffle trimming
Details
       

 09-24-2009
1.50
More top baffle trimming
Details
       

 09-22-2009
2.00
Front Baffle riveting
Details
       

 09-21-2009
0.50
Oil cooler mounting location "problem".
Details
       

 09-21-2009
3.00
Forward Ramp support angles
Details
       

 09-21-2009
0.30
Baffle "box" nearing completion
Details
     

 09-20-2009
1.00
Left Front ramp bottom brackets
Details
     

 09-19-2009
4.00
Front baffle trimming (again)
Details
       

 09-17-2009
1.00
Right Front inlet ramp trim
Details
       

 09-17-2009
1.00
Front Left Inlet ramp Baffle trim
Details
       

 09-17-2009
1.00
Front Baffle Inlet ramps Trim layout
Details
       

 09-15-2009
2.00
Front baffle first trim
Details
       

 09-14-2009
2.50
Front Baffles
Details
       

 09-13-2009
3.00
Rear baffle trial fit-up
Details
       

 09-12-2009
2.00
Rt Rear Baffle Assy
Details
     

 09-12-2009
3.00
Move Elect Ign coils
Details
       

 09-11-2009
3.50
Rear baffle sub assy's
Details
       

 09-08-2009
4.00
Baffle Left Rear
Details
       

 09-07-2009
5.00
Baffle kit
Details
       

 09-03-2009
1.50
Engine Baffle Kit
Details
       

 09-02-2009
1.50
Completed FAB
Details
     

 08-21-2009
2.00
FAB inlet completion
Details
       

 08-19-2009
1.00
FAB Cowl inlet tube
Details
       

 08-18-2009
1.00
Nose Inlet FG
Details
       

 08-17-2009
1.00
FAB Nose inlet carving to fit
Details
       

 08-17-2009
1.00
FAB Nose inlet
Details
       

 08-15-2009
2.00
FAB Door riveting
Details
       

 08-10-2009
2.50
FAB Alt Air Door
Details
       

 08-09-2009
2.00
Filtered Air Box (FAB)
Details
       

 08-09-2009
2.00
FAB Retainer clips
Details
       

 08-09-2009
2.00
FAB fit on engine
Details
       

 08-09-2009
2.00
FAB Alt Air door
Details
       

 08-09-2009
2.00
Exh Pipe Supports
Details
       

 07-16-2009
0.50
Cowl louver cover panels
Details

 07-13-2009
2.00
Cowl Louver covers
Details
       

 07-09-2009
1.50
Oil Door latches
Details
       

 07-06-2009
1.00
Oil Door Edge Fairing
Details
       

 07-03-2009
2.00
Oil Door mating to hinge
Details
       

 07-01-2009
1.50
Oil door hinge
Details
       

 06-30-2009
1.00
Louver and cowl inlet ramps
Details
       

 06-30-2009
1.50
Cowl Louver Flanges
Details
       

 06-29-2009
2.00
Cowl exit louvers
Details
       

 06-25-2009
1.50
Cowl nose/ramps
Details
       

 06-22-2009
1.00
Inlet ramps
Details
       

 06-22-2009
1.00
Cowl side pin fairing
Details
       

 06-21-2009
1.00
Cowl Nose fill
Details
       

 06-20-2009
1.00
Cowls on!!
Details
       

 06-20-2009
2.00
Bottom Cowl Bracket
Details
       

 06-18-2009
3.00
Bottom Cowl Support Bracket
Details
       

 06-11-2009
2.00
Cowl Hinge riveting
Details
       

 06-08-2009
1.50
Cowl hinges
Details

 06-07-2009
6.00
Cowl hinges; Tach Generator and Panel testing
Details
       

 06-06-2009
6.00
Final Cowl fitup
Details
       

 06-02-2009
2.00
Bottom Cowl Initial fit
Details
       

 06-01-2009
2.00
Top cowl fit on plane
Details
       

 06-01-2009
1.00
Nose bowl flange fitup
Details
       

 06-01-2009
1.00
Cowl Nose trimming
Details
       

 05-30-2009
6.00
Top cowl trim
Details
       

 05-30-2009
1.00
Cowl oil door
Details
       

 05-28-2009
4.00
Cowl hinges on FW
Details
       

 05-22-2009
3.00
Cowl Hinges
Details
     

 05-21-2009
1.00
LSE Ign Harness
Details
       

 04-27-2009
1.50
Engine Tach signal
Details
     

 04-25-2009
2.00
Move LSE Computer location
Details
       

 04-22-2009
2.00
Prop mounted
Details
       

 04-18-2009
3.50
Spinner Backplate fab
Details
       

 04-11-2009
5.00
Exhaust pipes installed
Details
       

 04-03-2009
1.00
Prop Gov bolting changed
Details
       

 04-02-2009
0.50
EIS Excitation V block completed
Details
       

 04-01-2009
1.00
Throttle cable "Eyeball" pene
Details
       

 03-31-2009
2.00
EGT/CHT Wiring harness run. EIS Dwg Update
Details
       

 03-30-2009
0.50
Throttle cable ran
Details
     

 03-28-2009
0.10
Prop Governor control attachment
Details
       

 11-15-2008
3.00
Panel color coat paint
Details
     

 11-06-2008
2.00
Starter Wire run
Details
       

 11-05-2008
2.00
Solenoid & Alternator wiring runs
Details
       

 11-02-2008
3.00
LSE Module, Antenna shelf, Panel cutou
Details
       

 11-01-2008
2.00
Oil-Fuel senders, electrical
Details
       

 10-25-2008
1.50
Houston, We have a PROBLEM....
Details
       

 10-25-2008
1.00
Exhaust pipe setup
Details
     

 09-05-2008
2.00
Starter cable run
Details
       

 09-05-2008
2.00
Master/Starter Solenoids
Details
       

 09-05-2008
2.00
Batt & Engine ground cables
Details
       

 09-04-2008
2.00
Sort out Van's wiring harness
Details
     

 09-02-2008
2.00
Fuel Inj cable trial fit
Details
     

 08-06-2008
1.00
Starter power cable
Details
     

 08-05-2008
3.00
Fuel Injector Body fuel line
Details
       

 08-05-2008
2.00
Fuel Inj body - Van's fuel lines
Details
       

 08-03-2008
4.00
Manifold Press hose & Alternator
Details
       

 08-02-2008
4.00
Fuel line, crankcase vent, oil pressure line
Details
       

 07-27-2008
3.00
Mounting the engine
Details
       

 07-27-2008
1.00
Engine mount
Details
     

 07-20-2008
4.00
Cabin Heat vlv and sensor manifold
Details
       

 07-05-2008
1.00
FWF Kit from Vans
Details
       

 06-13-2008
1.00
Brought engine home
Details
       

 03-29-2008
1.00
Prop Gov bolting change

 03-27-2008
2.50
Mounted engine mount
Details
     

 03-26-2008
3.00
Master/Starter solenoids
Details
       

 03-18-2008
2.00
Battery box mounted to FW
Details
       

 03-18-2008
2.00
Battery box assy
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.