Powered By Kitlog Pro v2.0
Mikes RV-9A Web Site
RV-9A
Assembly & Preflight
Work Logs Found:
42
Category Work Time:
85 Hours
Date
Hours
Work Log Summary
Details
07-23-2010
3.00
Ready for FIRST FLIGHT!
Details
07-22-2010
3.00
More assyembly
Details
07-21-2010
2.00
Squawk List worked off
Details
07-21-2010
1.00
FAA INSPECTION!!
Details
07-21-2010
6.00
Buttoning up the airplane
Details
07-19-2010
1.50
EAA Bldrs Grp Inspection
Details
07-17-2010
3.00
Gust locks & misc
Details
07-17-2010
1.00
EFIS Magnetometers calib
Details
07-09-2010
1.00
Prop low pitch limit reset
Details
07-08-2010
1.00
Prop leak issue....
Details
07-08-2010
0.50
FSDO inspection scheduled!!
Details
07-07-2010
1.00
Prop oil leak, FT RPM check... over redline
Details
07-01-2010
2.00
Seat Belts, Baggage tiedowns
Details
06-30-2010
1.50
Fuel Tank Lvl recalib
Details
06-29-2010
2.50
8 lbs Ballast added - W&B Mod
Details
06-27-2010
0.50
Taxi Testing
Details
06-24-2010
1.00
W&B-Nose wheel weight issues
Details
06-23-2010
1.50
W&B completed!
Details
06-19-2010
1.50
FIRST engine start!!
Details
06-03-2010
1.00
W&B station check - "Odd" finding
Details
05-25-2010
2.00
Conditional Inspection - ready for engine run
Details
05-21-2010
1.00
LSE Spark Plugs installed
Details
05-20-2010
2.00
Pitot-Static leak check
Details
05-19-2010
2.00
Timing Index arm
Details
05-18-2010
3.00
Conditional Inspection
Details
05-14-2010
1.50
Fuel Tank Lvl Calib.. FINALLY
Details
05-12-2010
2.00
Fuel Tank level data
Details
05-11-2010
1.50
Fuel Tk Lvl Calib Arrggggg
Details
05-10-2010
3.00
Pedals / Brakes / Fuel lvl calib
Details
05-07-2010
3.00
Control Sys Rigging
Details
05-06-2010
5.00
Misc assy
Details
05-05-2010
2.00
Left wing tip wiring
Details
05-04-2010
1.50
Left Wing wiring
Details
05-03-2010
2.00
Rt wing tip completed
Details
04-27-2010
1.50
Rt Wing tip wiring.
Details
04-26-2010
2.00
Wing tip wiring
Details
04-14-2010
2.00
Completed Tail assembly
Details
04-13-2010
2.00
Elevator trim tab hook up
Details
04-12-2010
1.50
Tail assy
Details
04-09-2010
1.00
ID Tag and tail mounting
Details
04-08-2010
4.00
Mounted ailerons,flaps & HS
Details
04-08-2010
4.00
Completed wing bolt installation
Details
SITE NAVIGATION
Contact Builder
Long-EZ Home
RV-9A Home
Category
# Logs
# Hours
All
730
1787
Assembly & Preflight
42
85
Assyembly & Prefligh
42
85
Avionics
67
264
Baggage Aux Fuel Tk
18
44
Canopy
68
138
Delivery
1
3
Documentation
1
6
Electrical Dwgs
9
2
Empennage
62
144
Firewall Forward
135
262
Flight Test
20
39
Fuselage
165
382
Maint-Squawks
3
5
Miscellaneous
8
6
Paint-Finishing
43
202
Shop Supplies
1
8
Wings
45
112
Copyright © 2001-2024 Matronics. All Rights Reserved.