Layed out static port locations per DWG28 and hooked up static lines to port sensor stubs (Van's rivet design), then RTV sealed the friction connections. Had to use boiling water to soften the tube ends to slide them over the rivet stubs. Routed sensing line under arm rest as the upper fuselage side will be "busy" with tip-up canopy latching hardward.