Brief Description: Final Drill Left C-613, WD-716, WD-725, C-723
Once the right side was drilled I repeated everything on the left. The left C-723 wedge was inserted in the gap between the flange of the C-613 splice plate and the WD-716 canopy frame, and everything was match-drilled to #30, including the top tab of the side rail.
Outside view of left WD-716 and WD-725 side rails drilled to C-613 splice plate
Inside view of left WD-716 and WD-725 side rails drilled to C-613 splice plate and C-723 wedge