KitLog pro

Powered By Kitlog Pro v2.0

Dan's Web Site
Work Logs Found: 1854
Category Work Time: 2264 Hours
 Date
Hours
Work Log Summary

Details

 07-10-2012
0.00
XeVision HID and Balast on Duckworks Mount
Details
     

 07-10-2012
1.00
Recharge Dessicant Plugs; Remove Lower Cowl
Details
       

 06-01-2012
0.50
Rivet Nutplates to Ribs for Duckworks Mount
Details
     

 06-01-2012
0.50
Match Drill Reinf Strips for Plexiglass Cover
Details
     

 06-01-2012
0.50
Drill Rivet Holes for Nutplates using Jig
Details
     

 06-01-2012
0.50
Drill Ribs for Screws to Secure Duckworks Kit
Details
       

 05-20-2012
0.50
Measure / Mark for Duckworks Cutout
Details
       

 05-20-2012
1.00
Dremel Duckworks Cutout; Debur
Details
       

 05-07-2012
0.50
Rivet Nutplates to Ribs for Duckworks Mount
Details
       

 05-07-2012
0.50
Recharge Dessicant Plugs; Top Off Oil
Details
       

 05-07-2012
0.50
Measure / Mark for Duckworks Cutout
Details
       

 05-07-2012
0.50
Match Drill Reinf Strips for Plexiglass Cover
Details
     

 05-07-2012
0.50
Drill Rivet Holes for Nutplates using Jig
Details
       

 05-07-2012
0.50
Drill Ribs for Screws to Secure Duckworks Kit
Details
       

 05-07-2012
1.00
Dremel Duckworks Cutout; Debur
Details
       

 03-16-2012
0.50
Trim Wing Tip Trailing Edge to Match Aileron
Details
       

 03-16-2012
1.00
Trim Left Wing Tip and Rib Flanges
Details
       

 03-16-2012
0.50
Rivet Rib to Left Wing Tip
Details
       

 03-16-2012
0.75
Right Wing Tip - Install Nutplates for Position Li
Details
       

 03-16-2012
0.25
Mark Aft Edge of Wing Tip Rib on Fiberglass Tip
Details
       

 03-16-2012
0.25
Mark 1-1/2" Rivet Spacing for Wing Tip Rib
Details
       

 03-16-2012
0.75
Left Wing Tip - Install Nutplates for Position Lig
Details
       

 03-16-2012
0.50
Install Tip on Wing; Drill Rib to Tip
Details
       

 03-16-2012
1.00
Flox Wing Tip Trailing Edges Together
Details
       

 03-16-2012
0.75
Countersink Fiberglass Wing Tip for RIb
Details
       

 03-12-2012
1.00
Rivet Rib to Right Wing Tip
Details
       

 03-12-2012
1.00
Prep Work to Install Wing Tip Rib
Details
       

 03-10-2012
0.50
Trim Wing Tip Trailing Edge to Match Aileron
Details
       

 03-10-2012
1.50
Create Shims For Top Flange of Wing Tip Rib
Details
       

 03-10-2012
0.50
Cleco Rib and Shims to Right Wing Tip
Details
       

 03-07-2012
0.25
Wing Tip Cosmetic Problems
Details
       

 03-07-2012
0.50
Trim Right Wing Tip Rib Around Nutplates
Details
       

 03-07-2012
0.50
Trim Fiberglass Tip for 1/4" Clearance From Ailero
Details
       

 03-07-2012
1.00
Mark Locations For Rivets; Drill & Cleco Rib to Ti
Details
       

 03-07-2012
0.25
Insert Wing Tip Rib; Mark Aft Edge
Details
       

 03-03-2012
1.00
Debur / Dimple for Wing Tips
Details
       

 03-03-2012
1.00
Countersink Fiberglass Wing Tips for #6 Screws
Details
       

 03-01-2012
2.00
Install Nutplates on Left Wing Tip
Details
       

 02-29-2012
2.00
Install Nutplates on Right Wing Tip
Details
       

 01-12-2012
0.50
Mark Nose Wheel Pants for Drilling
Details
       

 01-12-2012
0.50
Drill Nose Wheel Pant Halves Together
Details
     

 01-11-2012
0.50
Trace Whelen Base onto Left Wing Tip
Details
       

 01-11-2012
0.50
Take Left Wing Tip to Hangar - Drill to #30
Details
       

 01-11-2012
1.00
Sand Left Wing Tip Flanges
Details
     

 01-11-2012
1.00
Left Wing Tip - Cutout for Whelen Position Light
Details
       

 01-10-2012
0.50
Trace Whelen Base onto Right Wing Tip
Details
       

 01-10-2012
0.50
Take RIght Wing Tip to Hangar - Drill to #30
Details
     

 01-10-2012
1.00
Right Wing Tip - Cutout for Whelen Position Light
Details
       

 01-10-2012
1.00
Left Wing Tip - Micro Top Reinforcement Strip
Details
       

 01-10-2012
1.00
Left Wing Tip - Micro Bottom Reinforcement Strip
Details
       

 01-10-2012
0.50
Disassemble Whelen Position Light
Details
     

 01-09-2012
1.00
Wing Tip - Micro Top Reinforcement Strip
Details
       

 01-09-2012
0.50
Trim Left Wing Tip
Details
       

 01-09-2012
0.50
Leftt Wing Tip - Redrill Bottom Holes
Details
       

 01-07-2012
1.00
Wing Tip - Micro Bottom Reinforcement Strip
Details
       

 01-05-2012
0.50
Trim Right Wing Tip
Details
       

 01-05-2012
0.50
Right Wing Tip - Trailing Edge Work
Details
       

 01-05-2012
0.50
Right Wing Tip - Redrill Bottom Holes
Details
       

 01-05-2012
0.50
Debur Right Wing Tip Reinforcement Tips
Details
       

 12-30-2011
1.00
Drill Wing Tip Reinforcement Strips to Outboard Ri
Details
       

 12-30-2011
1.00
Drill Wing Tip Reinforcement Strips to Outboard Ri
Details
       

 12-28-2011
0.50
Right Wing Tip - Trailing Edge Problems
Details
       

 12-28-2011
0.50
Left Wing Tip - Trailing Edge Problems
Details
       

 12-28-2011
0.50
Drill Right Wing Tip to Right Wing
Details
       

 12-28-2011
0.50
Drill Left Wing Tip to Left Wing
Details
       

 09-30-2011
0.00
Right Flap Aligned with Right Aileron
       

 09-30-2011
0.50
Recharge Dessicant Plugs
Details
       

 09-30-2011
0.00
Left Flap Pushrod - Up Position
       

 09-30-2011
0.00
Left Flap Aligned with Left Aileron
       

 09-30-2011
2.00
Clamp Plywood Jig to Right Wing; UHMV Tape
Details
       

 09-30-2011
1.00
Adjust and Bolt Right Flap Pushrod
Details
       

 09-30-2011
1.00
Adjust and Bolt Left Flap Pushrod
Details
       

 08-03-2011
0.50
Recharge Dessicant Plugs
Details
       

 07-21-2011
0.00
Right Flap and Aileron - Trailing Edges Aligned
       

 07-21-2011
1.00
Replace Round Flap Pushrods with Hex Pushrods
Details
       

 07-21-2011
0.00
Left Flap and Aileron - Trailing Edges Aligned
       

 07-21-2011
1.00
Install Right Flap & Safety Wire Piano Hinges
Details
       

 07-21-2011
1.00
Install Left Flap & Safety Wire Piano Hinges
Details
       

 07-16-2011
1.00
Loosely Install Main Aileron Pushrods and Adjust
Details
       

 07-16-2011
1.00
Install Pushrod Between Right Aileron & Bellcrank
Details
       

 07-16-2011
1.00
Install Pushrod Between Left Aileron & Bellcrank
Details
       

 07-16-2011
3.00
Create Plywood Wing/Aileron Jig - Clamp Left Wing
Details
       

 07-16-2011
1.00
Bolt, Torque, Seal Right Aileron Main Pushrod
Details
       

 07-16-2011
1.00
Bolt, Torque, Seal Left Aileron Main Pushrod
Details
       

 07-16-2011
1.00
Bolt Short Left Aileron Pushrod to Bellcrank
Details
     

 07-12-2011
2.00
Top Skin Access Panels - Drill Reinforcement Rings
Details
       

 07-12-2011
0.50
Access Panels - Rivet Reinf Rings to Top Skin
Details
       

 07-12-2011
1.00
Access Panels - Countersink Access Reinf Rings
Details
       

 07-11-2011
0.25
Install Right Fuel Tank Vent Connector Line
Details
       

 07-11-2011
0.25
Install Left Fuel Tank Vent Connector Line
Details
       

 07-11-2011
0.50
Connect Right Tank Fuel Line
Details
       

 07-11-2011
0.50
Connect Left Tank Fuel Line
Details
       

 07-11-2011
0.50
Bolt & Safety Wire Right Fuel Tank Attach Brackets
Details
       

 07-11-2011
0.50
Bolt & Safety Wire Left Fuel Tank Attach Brackets
Details
       

 07-06-2011
0.00
Right Aileron Pictures
       

 07-06-2011
0.00
Left Aileron Pictures
       

 07-06-2011
1.00
Bolt Right Aileron to Wing
Details
       

 07-06-2011
1.00
Bolt Left Aileron to Wing
Details
       

 07-05-2011
1.00
Install Screws Joining Bottom Wing/Fuselage Skins
Details
       

 07-05-2011
1.00
Install Rear Spar Bolts, Nuts, Cotter Pins
Details
       

 07-04-2011
1.00
Torque Right Wing Attach Bolts
Details
       

 07-04-2011
1.00
Torque Left Wing Attach Bolts
Details
       

 07-04-2011
0.00
Empty Wing Cradle
Details
       

 07-02-2011
0.00
Wings Are On!!!
Details
       

 07-02-2011
0.00
Wings Are On!!!
Details
       

 07-02-2011
1.50
Right Wing Root Fairing Nutplates - Fuel Tank
Details
     

 07-02-2011
0.00
Matt and His Beautiful Lancair 320
Details
       

 07-02-2011
2.00
Mate the Right Wing to the Fuselage
Details
       

 07-02-2011
2.00
Mate the Left Wing to the Fuselage
Details
       

 07-02-2011
0.50
Dimple Bottom Fuselage Skins for Wing Root Skins
Details
     

 07-01-2011
1.00
Wing Root Fairing - Top Aft Platenut - Both Wings
Details
       

 07-01-2011
1.00
Left Wing Root Fairing Nutplates - Fuel Tank
Details
       

 07-01-2011
0.50
Left Wing - Install Nutplate on Fuel Tank Bracket
Details
       

 07-01-2011
1.00
Dimple&Rivet K1100 Platenuts - Bottom Aft Skins
Details
       

 06-18-2011
2.00
Install Wing Root Gap Fairing Platenuts - Top Skin
Details
       

 06-18-2011
1.00
Countersink for #8 Screws - Top Wingwalk Area
Details
       

 06-08-2011
2.00
Intall Rudder and Elevators
Details
       

 06-08-2011
1.00
Bolt Rudder Cables to Rudder; Charge Battery
Details
       

 06-07-2011
0.00
Remove Canopy and Top Cowl
Details
       

 06-07-2011
0.00
Move Workbenchs and Shelves to Hangar
Details
       

 06-07-2011
1.00
Install Vertical Stabilizer
Details
       

 06-07-2011
1.00
Install Horizontal Stabilizer
Details
       

 06-02-2011
0.00
Gleim Back-Filled, Grass Seed Planted
Details
     

 05-26-2011
0.00
DB Masonry - Rebuilding the Wall
Details
       

 05-25-2011
0.00
House Gives Birth to Airplane & Moves to Hangar
Details
       

 05-24-2011
0.00
Hole is Tarped for the Night
Details
       

 05-24-2011
0.00
DB Masonry - Shoring / Knocking Out Wall
Details
       

 05-23-2011
0.00
Gleim Excavating - Part II
Details
       

 05-23-2011
0.00
Gleim Excavating - Part I
Details
       

 05-23-2011
0.00
Before Pictures - Prep Work
Details
       

 02-26-2011
0.50
Recharge Dessicant Plugs
Details
       

 02-26-2011
1.00
Mark Top Forward Skin for Access Panels
Details
       

 02-26-2011
2.00
File and Debur Access Panels
Details
       

 02-26-2011
2.00
Fabricate 2 Access Panel Support Rings
Details
       

 02-26-2011
1.00
Cut Out Access Panels in Top Forward Skin
Details
       

 12-10-2010
1.00
Reinstall Dynon Remote Compass Sensor
Details
     

 12-07-2010
0.50
Wire Fuel Flow Sensor
Details
     

 12-06-2010
1.00
Reinstall Dynon D10A EFIS in Panel
Details
       

 12-06-2010
0.50
Recharge Dessicant Plugs
Details
     

 12-06-2010
1.00
Install Air Gizmo Dock for Garmin Aera 560
Details
       

 11-15-2010
1.00
Secure More Wires in Engine Compartment
Details
       

 11-15-2010
1.00
Install and Safety Wire Oil Filler/Dipstick Tube
Details
       

 11-01-2010
0.50
Install Heat Shield Between Starter and Exhaust
Details
     

 10-24-2010
1.00
Secure #2 & #4 Cyl EGT & CHT Wires
Details
       

 10-24-2010
1.00
Secure #2 & #4 Cyl EGT & CHT Wires
Details
       

 10-24-2010
1.00
Secure #1 & #3 Cyl EGT & CHT Wires
Details
       

 10-24-2010
1.00
Secure #1 & #3 Cyl EGT & CHT Wires
Details
       

 10-24-2010
1.00
Remove Dynon D10A EFIS to Ship for Repair
Details
       

 10-23-2010
2.00
Secure Right Side Primer Lines with Adel Clamps
Details
       

 10-23-2010
2.00
Secure Left Side Primer Lines with Adel Clamps
Details
       

 10-23-2010
2.00
Install Fuel Flow Sensor
Details
       

 09-25-2010
0.00
Signed Hangar Lease - Lucky #7 at CXY
Details
       

 04-24-2010
0.50
Recharge Dessicant Plugs
Details
       

 04-24-2010
1.00
Install Right Side Primer Fittings / Fab SS Lines
Details
       

 04-24-2010
1.00
Install Right Side Cylinders 1 & 3 Brass T Fitting
Details
       

 04-24-2010
1.00
Install Left Side Primer Fittings / Create Templat
Details
       

 04-24-2010
1.00
Install Left Side Cylinders 2 & 4 Brass T Fittings
Details
       

 04-24-2010
1.00
Bend / Install Stainless Steel Primer Lines 2 & 4
Details
       

 04-10-2010
0.00
Passed My Private Pilot Checkride! Lakeland, FL
Details
       

 02-07-2010
0.00
Solo - Tailwheels, Etc - Winter Haven, FL
Details
       

 12-19-2009
1.00
Secure Right Baffle Cylinder Fin Wraps
Details
       

 12-19-2009
1.00
Secure Left Baffle Cylinder Fin Wraps
Details
       

 12-19-2009
1.00
Replace Lower Oil Cooler Fitting with 45
Details
       

 12-19-2009
1.00
Install and Safety Wire Oil Cooler Support Rod
Details
       

 12-07-2009
1.00
Reinstall Baffles and Oil Cooler
Details
     

 12-05-2009
0.50
Install Baffle Material with Screws
Details
     

 12-04-2009
1.00
Install Baffle Material with Screws
Details
       

 12-03-2009
1.00
Install 3rd Fiberglass Layup for Intake
Details
       

 12-02-2009
1.00
Install 2nd Fiberglass Layup for Intake
Details
     

 12-01-2009
2.00
Remove Baffles and Drill Out Pop Rivets
Details
       

 12-01-2009
0.50
Install 1st Fiberglass Layup for Intake
Details
     

 12-01-2009
0.50
Drill Hex Oil Cooler Brace for Safety Wire
Details
     

 11-30-2009
1.00
Replace Pop Rivets with Screws - Left Front
Details
       

 11-30-2009
0.50
Mask Off FAB Intake / Install Lower Cowl
Details
       

 11-30-2009
0.50
Final Trim Intake Foam
Details
       

 11-30-2009
0.50
Bondo Foam to Inside of Lower Cowl Intake
Details
       

 11-23-2009
1.00
Bolt / Safety Wire FAB Mount Plate to Carb
Details
       

 11-14-2009
0.50
Rivet FAB - Top Plate to Fiberglass
Details
     

 11-04-2009
0.50
Rivet Carb Heat Door Parts to FAB Top Plate
Details
       

 11-04-2009
0.50
Debur, Clean, Alodine Carb Heat Door Parts
Details
     

 11-02-2009
1.00
Remove FAB/Filter; Install Bypass Door/Clamp
Details
       

 10-24-2009
1.00
Trim Air Filter; Pro-Seal Filter & Flange for Bypa
Details
       

 10-24-2009
0.50
Remove Nose Wheel; Punch Fork for New Hole
Details
       

 10-24-2009
0.50
Pull & Tie the Tail Down to Raise Nose Wheel
Details
       

 10-24-2009
0.50
Install Matco Spacer/Axle; Reinstall Nose Wheel
Details
       

 10-24-2009
0.50
Install Air Filter and FAB while Pro-Seal Cures
Details
       

 10-24-2009
0.50
Drill 1/4" Anti-Rotation Hole in Fork
Details
       

 10-17-2009
0.50
Tap New Matco Nose Wheel Axle
Details
     

 10-09-2009
1.50
Cut Hole in Bottom of FAB for Bypass Door
Details
       

 10-08-2009
1.50
Fabricate/Drill Carb Heat Door
Details
       

 10-08-2009
0.50
Drill Cable Arm to Carb Heat Door
Details
     

 10-07-2009
1.50
Notch/Bend Neck of Top Plate to Match Scoop
Details
       

 10-07-2009
1.50
Drill Fiberglass FAB to Top Plate and Trim
Details
     

 10-07-2009
0.50
Check Final Alignment - FAB to Scoop
Details
       

 10-06-2009
2.00
Trim, Punch, Drill, Rivet Final Airseal Strips - F
Details
       

 10-06-2009
1.00
Countersink, Alodine, Rivet Retention Clips/Nutpla
Details
       

 10-06-2009
0.50
Bolt Top Plate to Mount Plate to Carb
Details
       

 10-05-2009
1.00
Trim/Debur FAB Mount Plate
Details
       

 10-05-2009
1.00
Trim Neck of FAB - Align Horizontally to Cowl
Details
       

 10-05-2009
0.25
Replace Carb Drain Bolt with Allen Head Cap
Details
       

 10-05-2009
0.25
Fit FAB Mount Plate to Carb
Details
       

 10-05-2009
1.50
Drill Top Plate to Mount Plate; Fab Retention Clip
Details
       

 09-19-2009
0.50
Trim & Punch Right Front Airseal Fabric Strip
Details
       

 09-19-2009
0.50
Trim & Punch Left Front Airseal Fabric Strip
Details
       

 09-09-2009
0.50
Trim & Punch Left Side (Middle) Airseal Fabric Str
Details
       

 09-09-2009
0.50
Rivet Airseal Fabric to Left Side (Middle) Baffle
Details
     

 09-09-2009
0.25
Reinstall Top Cowl; Check Baffle Contours - Right
Details
       

 09-09-2009
0.25
Reinstall Top Cowl; Check Baffle Contours - Left
Details
       

 09-09-2009
0.00
Photo Op: Front Baffles Marked for Final Trimming
Details
       

 09-09-2009
0.50
Paint 2nd Coat on Inside of Lower Cowl
Details
     

 09-09-2009
0.50
Mark Front Baffles for Further Trimming
Details
       

 09-09-2009
1.00
Install Right Side (Middle) Airseal Strip
Details
     

 09-09-2009
1.00
Install Right Side (Front) Airseal Strip
Details
     

 09-09-2009
1.00
Install Left Side (Front) Airseal Strip
Details
     

 09-09-2009
1.50
Final Trim Front Baffles
Details
       

 09-08-2009
2.00
Sand, Clean, Tape, Paint Inside of Lower Cowl
Details
     

 08-31-2009
0.50
Trim & Punch Right Side (Aft) Airseal Fabric Strip
Details
       

 08-31-2009
0.50
Rivet Airseal Fabric to Right Side (Aft) Baffle
Details
     

 08-28-2009
0.50
Trim & Punch Left Side (Aft) Airseal Fabric Strip
Details
       

 08-28-2009
0.50
Trim & Punch Left Aft Airseal Fabric Strip
Details
       

 08-28-2009
0.50
Rivet Airseal Fabric to Left Side (Aft) Baffle
Details
       

 08-28-2009
0.50
Rivet Airseal Fabric to Left Aft Baffle
Details
       

 08-27-2009
1.00
Trim & Punch Right Aft Airseal Fabric Strip
Details
       

 08-27-2009
0.50
Rivet Airseal Fabric to Right Aft Baffle
Details
       

 08-27-2009
0.25
Install Mag Cooling Blast Tubes
Details
       

 08-27-2009
0.50
Install Cover Plate/Airseal Fab over Manifold Pres
Details
       

 08-27-2009
1.00
Final Install Right Baffles; Fab Manifold Cover Pl
Details
       

 08-27-2009
0.25
Bolt Baffles to Center Braces; Add Oil Cooler Brac
Details
       

 08-26-2009
1.50
Final Install Left Baffles & Oil Cooler
Details
       

 08-25-2009
1.00
Rivet Gap Filler Plates to Aft Bulkhead
Details
       

 08-25-2009
0.50
Prime Spinner Components
Details
     

 08-25-2009
1.00
Paint Inside of Top Cowl
Details
       

 08-25-2009
0.50
Final Rivet Front Baffles - Cyl Fin Wrap Plates
Details
       

 08-25-2009
1.00
Final Rivet Back Baffles - Cyl Fin Wrap Plates
Details
       

 08-25-2009
0.50
Final Install of Spinner
Details
       

 08-24-2009
1.50
Rivet Nutplates to Bulkheads; Final Trim Spinner
Details
       

 08-24-2009
0.50
Debur / Clean Spinner Components
Details
       

 08-22-2009
2.00
Drill/Countersink Bulkheads for Nutplates
Details
       

 08-18-2009
0.50
Fabricate 2nd Gap Filler Plate Support Tab
Details
       

 08-18-2009
1.00
Fabricate 2nd Gap Filler Plate
Details
       

 08-18-2009
0.50
Drill 2nd Gap Filler & Support Tab to Spinner
Details
     

 08-16-2009
0.50
Fabricate 1st Gap Filler Plate Support Tab
Details
       

 08-16-2009
1.00
Fabricate 1st Gap Filler Plate
Details
       

 08-16-2009
0.50
Drill 1st Gap Filler & Support Tab to Spinner
Details
       

 08-15-2009
1.00
Use Template to Make Spinner Cutouts for Prop
Details
       

 08-15-2009
1.00
Measure, Mark, and Drill Spinner to Foreward Bulkh
Details
       

 08-15-2009
1.00
Measure, Mark, and Drill Spinner to Aft Bulkhead
Details
       

 08-15-2009
1.00
Deepen Prop Cutouts to Seat Front Bulkhead
Details
       

 07-19-2009
1.00
Make Cardboard Template For Spinner Cutout
Details
       

 07-10-2009
6.00
Build Up Back of Spinner Area; Sand Front
Details
       

 07-03-2009
0.00
Prob: Top Cowl Too Close to Spinner Back Plate
Details
       

 07-03-2009
0.50
Bend & Install Camloc Recepticle Strips on Firewal
Details
       

 07-03-2009
0.50
Adjust Camloc Recepticles
Details
       

 06-29-2009
1.00
Drill Top Cowl For Camloc Studs; Install
Details
       

 06-29-2009
1.50
Countersink for Camloc Recepticles; Rivet
Details
       

 06-26-2009
1.00
Use Skybolt's Steel Template - Drill Recepticles
Details
     

 06-23-2009
1.00
Use Skybolt's Steel Template - Drill Rivets / Offs
Details
     

 06-22-2009
3.50
Mark & Drill #30 Holes for Camloc's; Scallop Strip
Details
       

 06-16-2009
1.00
Trim Camloc Strips for 1-1/4" Overlap
Details
       

 06-16-2009
1.00
Sand Micro Along Aft Firewall Edge of Top Cowl
Details
     

 06-12-2009
1.00
Micro Over Fiberglass - Firewall Edge of Top Cowl
Details
     

 06-10-2009
1.00
Micro Rivet Holes & Cover with Fiberglass
Details
     

 06-10-2009
1.00
Drill Oil Filler Door Hinge and Latches
Details
       

 06-10-2009
1.00
Debur, Alodine, Rivet Hinge/Latches to Door
Details
       

 06-09-2009
1.50
Sand Right Inlet Ramp; Fiberglass Over Rivet Holes
Details
     

 06-09-2009
1.50
Fabricate New Aluminum Oil Filler Access Door
Details
       

 06-08-2009
1.00
Trim, Bend, Drill, & Countersink Right Camloc Stri
Details
       

 06-08-2009
1.00
Trim, Bend, Drill, & Countersink Left Camloc Strip
Details
       

 06-06-2009
0.50
Countersink Center Camloc Strip
Details
     

 06-05-2009
1.00
Drill 0.050 Aluminum Camloc Strip to Firewall
Details
     

 06-04-2009
1.00
Sand Micro on Right Inlet Duct Ramp
Details
     

 06-02-2009
1.00
Sand, Clean, & Micro Inlet Duct Ramps
Details
     

 06-01-2009
0.00
Fuel Primer Components and Skybolt Fasteners
Details
       

 06-01-2009
2.00
Flox / Fiberglass Ramps to Strengthen
Details
       

 05-31-2009
1.50
Fiberglass Over End Ribs of Inlet Duct Ramps
Details
       

 05-30-2009
2.00
Flox End Ribs/Caps on Inboard Sides of Ramps
Details
       

 05-27-2009
1.00
Sand Excess Flox from Inlet Duct Ramps
Details
     

 05-25-2009
1.00
Trim Inlet Duct Ramps; Sand; Flox to Top Cowl
Details
       

 05-25-2009
1.00
Sand Mirco from Upper Cowl Side Hinges
Details
       

 05-25-2009
0.50
Install Top Cowl While Inlet Ramps Cure
Details
       

 05-25-2009
0.50
Drill Inlet Duct Ramps to Top Cowl
Details
       

 05-13-2009
1.00
Remove Primer Valve Bracket from Firewall
Details
     

 05-12-2009
0.50
Remove Forrest of Ground Tabs - Engine Side
Details
       

 05-12-2009
1.00
Move Primer Valve to Top of Gascolator
Details
       

 05-12-2009
1.00
Fabricate Oil Cooler Support Brackets / Rod
Details
       

 05-11-2009
2.00
Final Trim Back Left Baffles; Reinf Flanges; Cap
Details
     

 05-11-2009
1.00
Fabricate and Drill Retention Clips
Details
       

 05-05-2009
3.00
Final Trim Front Baffles; Reinf Flanges
Details
       

 05-04-2009
2.00
Final Trim Right Aft Corner Baffles; Reinf Screw H
Details
     

 05-03-2009
1.00
Remaining Baffles - Mark Top Edges for Final Trim
Details
       

 05-03-2009
0.25
Recharge Dessicant Plugs
Details
       

 05-03-2009
0.25
Install Lower Cowl
Details
     

 05-03-2009
0.50
Front Baffles - Mark Top Edges for Final Trim
Details
       

 05-03-2009
0.25
Drill Mounting Holes for Harness Grommets
Details
       

 05-03-2009
0.25
Drill Hole For Alternator Blast Tube
Details
     

 05-03-2009
0.50
Connect the Dots to Mark the Final Trim Lines
Details
     

 04-04-2009
0.75
Parts 5&6 - Cutouts for Harness, Blast Tube
Details
     

 04-04-2009
1.00
Part 7 - Cutouts for Cabin Heat, Harness, Blast Tu
Details
       

 04-04-2009
0.25
Match Drill Cabin Heat Inlet Flange to Part 7
Details
       

 03-17-2009
1.00
Trim, Drill, Debur, Bolt Part 12 to Engine & Parts
Details
       

 03-16-2009
1.00
Rivet Part 7 to Part 8 Reinforcement Angles
Details
       

 03-16-2009
1.00
Cut Flanges Off Part 8; Fabricate Angle Replacemen
Details
       

 03-16-2009
1.00
Countersink, Debur, Alodine, Rivet Angles to Part
Details
       

 02-25-2009
1.00
Install Parts 4,5&6, Clamp and Drill 5&6 Together
Details
       

 02-25-2009
1.00
Countersink, Debur, Clean, Alodine Rivet Parts 5&6
Details
       

 02-24-2009
1.00
Bend, Drill, Debur, Alodine, Install Part 15
Details
       

 02-23-2009
0.50
Rivet Mounting Spacer to Part 6
Details
       

 02-23-2009
0.50
Install Part 6 on Engine
Details
       

 02-23-2009
1.00
Fabricate Mounting Spacer for Part 6
Details
       

 01-19-2009
1.00
Install Parts 4&5 and Oil Cooler
Details
       

 01-19-2009
1.00
Debur, Clean, Alodine, Rivet Parts 4&5
Details
       

 01-19-2009
0.50
Cut Flange Off Part 8; Fabricate Angle Instead
Details
       

 01-19-2009
0.50
Countersink Parts 4 and 5
Details
       

 01-18-2009
0.50
Match Drill Parts 4 & 5 & Reinforcement Components
Details
       

 01-18-2009
1.00
Fabricate and Drill Part 4 Brace Angle / Spacer
Details
       

 01-18-2009
0.50
Drill Oil Cooler Mounting Holes in Aft Baffle/Doub
Details
     

 01-18-2009
1.00
Align Drill Parts 4 & 5 & Reinforcement Components
Details
       

 01-17-2009
0.25
Trim Top of #3 Baffle; Install Cowl
Details
     

 01-17-2009
0.25
Trial Fit Cowl Halves - Edges Line Up Nicely
Details
       

 01-17-2009
2.00
Position & Drill FF-709 Oil Cooler Doubler to Part
Details
       

 01-17-2009
1.25
Mark 3/8" Down From Top of Paper Clips & Trim
Details
       

 01-17-2009
0.25
Install Paper Clips on Top Edges of Baffles
Details
       

 01-13-2009
0.50
Third Iteration of Trimming Top Bulkhead Edges
Details
       

 01-13-2009
0.50
Second Iteration of Trimming Top Bulkhead Edges
Details
       

 01-13-2009
0.50
Mark Front of Left Side Baffle for Trimming
Details
       

 01-12-2009
1.00
Trim New Left Aft Baffle Parts 4 & 5
Details
       

 01-12-2009
1.00
First Iteration of Trimming Top Bulkhead Edges
Details
       

 01-10-2009
0.50
Trim/Fabricate Part 13 - Left Inlet Floor Support
Details
       

 01-10-2009
0.50
Rivet Right Inlet Components
Details
       

 01-10-2009
0.50
Rivet Part 13 Left Inlet Floor Support to Baffles
Details
       

 01-10-2009
0.50
Rivet Left Inlet Components
Details
       

 01-10-2009
0.50
Pre Drill F1A&B to Left Inlet Floor and Bulkhead
Details
       

 01-10-2009
0.50
Pre Drill F11A&B to Right Inlet Floor and Bulkhead
Details
       

 01-10-2009
0.50
Install Right Front Inlet Corner Assembly
Details
       

 01-10-2009
0.50
Install Left Front Inlet Corner Assembly
Details
       

 01-10-2009
0.50
Final Drill Reinf Brackets to Inlet Floors/Bulkhea
Details
       

 01-10-2009
0.50
Debur, Clean, Alodine All Inlet Components
Details
       

 01-10-2009
0.50
Bend Right Inlet Reinforcement Angles - F11A&B
Details
     

 01-09-2009
0.50
Trim Right Front Bulkhead - Lower to Inlet Floor
Details
       

 01-09-2009
0.50
Trim Left Front Bulkhead - Lower to Inlet Floor
Details
       

 01-09-2009
0.00
Initial fitting of Front Bulkheads - Parts 1 & 11
Details
       

 01-09-2009
0.00
Front Bulkheads Lowered to Inlet Floors
Details
       

 01-09-2009
0.50
Fabricate Front Bulkhead Angles - F1A&B, F11A&B
Details
       

 01-08-2009
0.00
Oil Cooler Mounted Too High - Need to Redo
Details
       

 01-08-2009
5.00
5 Iterations of Trimming Top Edges of Baffles
Details
       

 01-07-2009
0.50
Trim Front/Top of Part 9 Side Baffle for Top Cowl
Details
       

 01-07-2009
0.50
Trim Front/Top of Part 3 Side Baffle for Top Cowl
Details
       

 01-07-2009
0.50
Temp Install Right Inlet Baffle and Lower Cowl
Details
       

 01-07-2009
1.00
Rivet Right Inlet Floor - Parts 9, 10, and 10S
Details
       

 01-07-2009
0.50
Install Lower Cowl, Then Upper Cowl; Mark Baffles
Details
       

 01-07-2009
2.00
3 Iterations of Trimming Top Edges of Baffles
Details
       

 01-05-2009
0.50
Temp Install Parts 9&10 - Right Inlet
Details
     

 01-05-2009
2.00
Fabricate Part 10S Reinf Angle; Drill to Right Inl
Details
       

 01-05-2009
0.50
Bend Parts 9&10 - Right Inlet Floor / Baffle
Details
       

 12-20-2008
1.00
Rivet Left Intake Parts 2, 2S, and 3
Details
       

 12-20-2008
0.50
Intall Left Intake Baffles on Engine - Parts 2&3
Details
       

 12-20-2008
1.50
Fabricate Part 2S Angle - Drill to Parts 2 & 3
Details
       

 11-08-2008
1.00
Make Bends in Left Intake Parts 2 & 3
Details
       

 11-01-2008
0.50
Recharge Dessicant Plugs
Details
       

 11-01-2008
1.00
Adjust and Tighten Exhaust Pipes
Details
       

 09-27-2008
0.50
Rivet Right Inlet Floor Parts - 10, 10R, 16
Details
       

 09-27-2008
0.50
Install Right Inlet Floor on Engine - Part 10
Details
       

 09-25-2008
0.50
Match Drill Part 10R to Part 10 - Right Inlet Floo
Details
       

 09-25-2008
0.50
Drill Part 2 - Left Inlet Floor to Parts 2R and 14
Details
       

 09-25-2008
0.50
Drill Part 16 Bracket to Right Inlet Floor
Details
       

 09-25-2008
0.50
Debur, Alodine, Rivet Parts 2, 2R, 14 - Left Inlet
Details
       

 09-24-2008
1.00
Fabricate Part 2R Reinf Angle for Left Inlet Floor
Details
       

 09-23-2008
1.00
Rivet R7F Reinf Plate to Part 7 - Right Aft Baffle
Details
       

 09-23-2008
1.00
Install Part 7 on Engine - Right Aft Baffle
Details
       

 09-22-2008
0.50
Trim Part 6 Baffle; Remove Oil Filler Tube
Details
       

 09-22-2008
0.50
Rivet Reinforcement Angle to Part 8
Details
       

 09-22-2008
1.00
Fabricate Diagonal Support Angle for Part 8
Details
     

 09-20-2008
0.50
Install Left Aft Corner Baffles/Oil Cooler on Engi
Details
       

 09-20-2008
0.50
Bolt Oil Cooler to Baffles
Details
       

 09-20-2008
1.00
Acetone, Alodine, Rivet Parts 4&5 - Oil Cooler
Details
       

 09-17-2008
2.00
Final Trim and Debur Oil Cooler Baffle Components
Details
     

 09-16-2008
1.50
Cutout Part 5 for Oil Cooler; Countersink 4&5
Details
     

 09-14-2008
1.50
Fit and Drill Oil Cooler to Baffles
Details
       

 09-14-2008
1.50
Drill / Debur Oil Cooler Baffle Parts (4&5)
Details
       

 08-30-2008
1.50
Install Left Wheel Pant Bracket
Details
       

 08-23-2008
0.75
Safety Wire Right Caliper, Cotter Pin Axle Nut
Details
       

 08-23-2008
0.75
Install Right Wheel Pant Bracket
Details
       

 07-25-2008
1.00
Fabricate 6 Spacers for Oil Cooler Bolts
Details
       

 05-17-2008
1.00
Replace Brake Pedal Bolts with Single AN3-56 Bolts
Details
       

 05-17-2008
0.50
Recharge Dessicant Plugs
Details
       

 05-17-2008
1.50
Add External Springs to Master Cylinders
Details
       

 03-10-2008
1.00
Part 9: Front Right Side Baffle - Drill & Rivet Re
Details
       

 03-10-2008
1.00
Part 8: Back Right Side Baffle - Drill & Rivet Rei
Details
       

 03-03-2008
1.00
Part 3: Front Left Baffle - Drill and Rivet Reinf
Details
     

 02-06-2008
2.00
Sand, Clean, Micro, Rivet Upper Cowl Side Hinges
Details
     

 02-05-2008
2.00
Micro / Rivet Remaining Lower Cowl Hinges
Details
       

 02-04-2008
0.75
Micro / Rivet Bottom Hinges to Lower Cowl
Details
       

 02-04-2008
0.75
Drill 1/4" Holes in Cowl Hinges for Micro
Details
       

 02-04-2008
0.50
Drill 1/4" Holes and Sand Remaining Cowl Hinges
Details
     

 01-16-2008
1.00
Install New Avery Axle Nuts
Details
       

 01-16-2008
1.00
Debur Cowl Hinges
Details
     

 01-11-2008
1.00
Torque Nose Gear Axle; Lower Nose onto Gear
Details
       

 01-11-2008
0.50
Assemble Van's Axle Nut Wrench; Avery Axle Nuts
Details
       

 01-10-2008
0.50
Replace Right Caliper O-Rings with Viton O-Rings
Details
       

 01-10-2008
0.50
Replace Left Caliper O-Rings with Viton O-Rings
Details
       

 01-07-2008
1.50
Set Nose Wheel Breakout Force; Install Cotter Pin
Details
       

 01-07-2008
0.50
Install Stop Bracket, Zerk Fitting, & Allen Stop S
Details
       

 01-07-2008
1.00
Countersink Sides of Upper/Lower Cowl for Hinges
Details
       

 01-07-2008
1.00
Countersink Aft Edges of Cowl for Hinges
Details
       

 01-06-2008
0.50
Aileron Attach Bracket Fix - Van's OK's Fix
Details
       

 12-31-2007
0.50
Ream New Nose Gear Leg to 0.311
Details
       

 12-31-2007
1.50
Install New Nose Gear Leg in Engine Mount
Details
       

 12-22-2007
0.50
New Nose Gear Leg and Fork Arrive from Van's
Details
     

 11-18-2007
1.50
Remove Nose Gear Leg and Ship to Van's
Details
       

 11-18-2007
0.50
Drilled Hole in Concrete; Lower Tail with Tie Down
Details
     

 11-04-2007
1.00
Drill Side Hinges to Upper Cowl
Details
       

 11-04-2007
1.00
Drill Left and Right Side Hinges to Lower Cowl
Details
       

 11-03-2007
0.50
Trim Lower Cowl Side Edges
Details
       

 11-03-2007
0.50
Remove Top Cowl and Sand Edges
Details
       

 11-03-2007
0.50
Install Top Cowl and Mark Lower Cowl Side Edges
Details
     

 11-03-2007
0.50
Cut Side Hinges - Position Right Hinge for Drillin
Details
     

 11-02-2007
0.50
Rivet Side Hinges to Firewall Flanges
Details
       

 11-02-2007
0.50
Mark & Trim Side Edges of Lower Cowl
Details
     

 11-02-2007
1.00
Drill, Debur, & Countersink Side Hinges
Details
       

 11-02-2007
0.50
Drill Upper Cowl to Firewall Hinges
Details
       

 11-02-2007
0.50
Drill Sides of Lower Cowl to Hinges
Details
       

 11-02-2007
1.00
Drill Lower Cowl to Bottom Hinges
Details
       

 11-01-2007
1.00
Support Upper Cowl / Initial Fit Lower Cowl
Details
       

 11-01-2007
0.50
Rivet Bottom Cowl Hinges to Firewall
Details
       

 11-01-2007
1.00
Mark & Trim Bottom Edge of Lower Cowl
Details
       

 11-01-2007
1.00
Cut and Drill Bottom Cowl Hinges to Firewall
Details
       

 11-01-2007
0.50
Countersink Bottom Cowl Hinges
Details
       

 10-31-2007
1.00
Sand to Fit Forward Edges; Drill Intake Fasteners
Details
       

 10-31-2007
1.00
Position Upper Cowl Referencing Spinner Bulkhead
Details
       

 10-31-2007
1.00
Mark & Trim Aft Edge of Upper Cowl
Details
       

 10-31-2007
1.00
Cleco Upper Hinges; Install Upper Cowl; Drill 4 Ho
Details
       

 10-30-2007
1.50
Trim Lower Cowl for Nose Gear Leg
Details
       

 10-30-2007
1.50
Mark and Cut Cowl for Oil Access Door
Details
       

 10-29-2007
1.00
Cut, Drill, Countersink Upper Right Piano Hinge
Details
       

 10-29-2007
1.00
Cut, Drill, Countersink Upper Left Piano Hinge
Details
       

 10-29-2007
1.00
Cleco Top Skin; Mark 2" Reference Line
Details
       

 10-25-2007
1.00
Ground Whelen Shields, Route Power/Ground Wires
Details
       

 10-24-2007
0.50
Connect Strobe Wires from Wings to Power Supply
Details
     

 10-22-2007
1.00
Redo Right Brake Line from Fuselage to Caliper
Details
       

 10-22-2007
1.00
Redo Left Brake Line from Fuselage to Caliper
Details
       

 10-21-2007
0.50
Test and Reverse Aileron Trim Wiring
Details
     

 10-21-2007
2.50
Complete Trim Relay and Indicator Wiring
Details
       

 10-17-2007
0.50
Install Male Pins on Trim/Stick Cables
Details
     

 10-15-2007
0.50
Switch GMA-340 Power from E-Buss to Main Buss
Details
     

 10-11-2007
0.50
Reinstall SL40 & Test - Works - Rx & Tx!
Details
     

 10-06-2007
0.50
Straighten #9 Pin on J1 GMA-340 Connector
Details
     

 10-06-2007
1.00
Re-Route Battery Buss Wires
Details
       

 10-06-2007
1.00
Re-Route 2 Wires to Main Buss
Details
       

 10-05-2007
0.50
Found Problem with Audio (Receiving)
Details
     

 10-02-2007
1.50
Install Ray Allen Relays on Sub Panel
Details
       

 09-17-2007
2.00
Install Nutplates for Voltage Reg and Man Press
Details
     

 09-11-2007
1.00
Join Stick Wires to Cable Running to Sub Panel
Details
       

 09-11-2007
0.50
Install BNC Connector on RG400 to Com Antenna
Details
     

 09-06-2007
0.50
Install Spherical Washers on CoPilot Stick
Details
     

 09-05-2007
1.50
Crimp D Sub Pins onto Stick Wires
Details
       

 09-03-2007
0.50
Route Wing Strobe Wires thru Fuselage Conduit
Details
       

 09-03-2007
1.50
Connect Aileron Trim Wires to Sub-Panel Cable
Details
     

 09-02-2007
1.00
Install Ray Allen G205 Stick Grips
Details
     

 09-01-2007
1.50
Drill 3/8 Holes in Sticks for Wiring; Secure Stick
Details
       

 08-31-2007
0.50
Run Strobe Wires from Power Supply Out to Wings
Details
       

 08-31-2007
1.00
Repeat for Mic, Phones, and Remote Compass
Details
     

 08-31-2007
0.50
Cut / Debur Control Sticks
Details
       

 08-31-2007
0.50
Connect Tail Strobe Wire to Whelen Power Supply
Details
     

 08-31-2007
0.50
Connect Pilot Phones to Harness Pigtail
Details
       

 08-30-2007
2.00
Wire Flap Position Module and Test
Details
     

 08-29-2007
1.00
Route Wire for Tail Strobe and Elevator Trim
Details
       

 08-29-2007
1.00
Route Flap Power, Ground, Extend, Retract Wires
Details
     

 08-28-2007
1.00
Finish Wiring Dynon Remote Compass / OAT
Details
     

 08-27-2007
0.50
Partially Wire a 9-Pin D-Sub for Dynon Remote Comp
Details
       

 08-27-2007
0.50
Install Headset Jacks and Route Wires
Details
       

 08-27-2007
0.50
Install Dynon OAT - Outside Air Temp Probe
Details
     

 08-27-2007
1.00
Install Click Bond Tie Wrap Mounts
Details
       

 08-27-2007
0.50
Drill Hole in F-705 Bulkhead for Wires
Details
     

 08-20-2007
0.50
Install Fiberglass Sleeve Around RAC Grip Wires
Details
     

 08-18-2007
1.00
Solder Second Ray Allen G205 Stick Grip
Details
       

 08-15-2007
1.00
Solder First Ray Allen G205 Stick Grip
Details
       

 08-05-2007
1.50
Solder Shielded Wire to Headset Jacks
Details
     

 08-05-2007
0.50
Drill Holes for Wires in Sub-Panel/Support Channel
Details
       

 08-04-2007
1.00
Wire Power and Ground Leads for Trutrak ADI
Details
     

 07-31-2007
1.00
Install Trutrak ADI in Panel
Details
     

 07-14-2007
0.50
Rivet Brackets for Headset Jacks to Fuselage
Details
       

 07-14-2007
0.50
Install GMA340 J1 & J2 Harnesses / Backplate
Details
       

 07-14-2007
1.00
Fabricate Brackets for Headset Jacks
Details
       

 07-08-2007
2.00
Rivet ELT & Whelen Power Supply Brackets
Details
       

 07-07-2007
1.00
Drill ELT & Whelen Power Supply Brackets to Fusela
Details
       

 07-05-2007
1.00
Install Carb Heat Cable Firewall Fitting & Nose Pl
Details
       

 07-05-2007
1.00
Connect J2 Harness to GMA-340 Backplate - Audio
Details
       

 07-04-2007
1.50
Install GTX-327 Transponder Backplate
Details
       

 07-03-2007
1.00
Screw SL40 Backplate to Tray; Install Antenna
Details
       

 07-03-2007
0.50
Install RG400 to GTX-327 Backplate
Details
       

 07-03-2007
0.50
Install Dynon EDC-D10A Remote Compass
Details
     

 07-01-2007
1.00
Install RG400 and Harness to SL40 Backplate
Details
       

 06-30-2007
1.00
Fabricate Bracket for Dynon EDC-D10A - Compass
Details
       

 06-30-2007
1.00
Drill EDC-D10A Bracket to Vertical Baggage Support
Details
       

 06-29-2007
1.00
Wire Falcon Turn Coordinator
Details
       

 06-28-2007
0.50
Install Transponder Antenna
Details
       

 06-28-2007
1.50
Drill Fuselage for Comant Bent Whip Antenna
Details
       

 06-24-2007
0.50
Install 9-Pin D-Sub on EFIS Remote Compass Wires
Details
     

 06-24-2007
0.50
Connect Dynon EMS and EFIS DSAB's Together
Details
       

 06-21-2007
1.00
Wire Dynon EFIS / EMS Together - DSAB
Details
     

 06-19-2007
0.50
Power Up the Dynon EFIS and EMS Units
Details
       

 06-19-2007
1.00
Install and Wire Manifold Pressure Sensor
Details
       

 06-18-2007
0.50
Wire Tach Pick-up's From P-Leads
Details
       

 06-18-2007
0.50
Wire Carb Temp Sensor to Dynon EMS
Details
     

 06-16-2007
1.50
Wire #1/3 EGT and CHT Probes to Dynon EMS
Details
       

 06-13-2007
1.00
Wire #2/4 EGT and CHT Probes to Dynon EMS
Details
       

 06-13-2007
0.50
Connect Fusible Links to Ammeter Shunt
Details
       

 06-13-2007
0.50
Bundle/Route #2&4 EGT, CHT, Carb Temp Wires
Details
       

 06-11-2007
0.50
Wire Oil/Fuel Pressure and Oil Temp Senders
Details
       

 06-11-2007
0.50
Connect Dynon EFIS & EMS Power / Grounds
Details
       

 06-07-2007
0.50
Wire Dynon EFIS Keep-Alive/Ground Leads
Details
       

 06-07-2007
0.50
Install New 1/4" Ring Terminal on Positive Lead
Details
       

 06-07-2007
0.50
Install New 1/4" Ring Terminal on Ground Lead
Details
       

 06-04-2007
0.50
Wire Starter Contactor to Ignition Switch
Details
       

 06-04-2007
0.50
Enlarge J1/J2 Slots in Sub Panel For Audio Cables
Details
       

 06-02-2007
0.50
Wire the Battery Buss - 14 AWG
Details
       

 06-02-2007
1.50
Wire Fusible Link & E-Buss Alternate Feed Switch
Details
       

 06-01-2007
0.50
Recharge Desiccant Plugs
Details
       

 06-01-2007
1.00
18AWG from Volt Reg to Breaker to Master
Details
       

 05-31-2007
0.75
Wire Battery Contactor Portion of Master Switch
Details
       

 05-31-2007
0.25
Test Master Switch / Battery Contactor
Details
     

 05-30-2007
0.50
Run 14AWG from Main to Diode to E-Buss
Details
       

 05-30-2007
0.50
Fabricate 6 AWG Power Cable for Main Buss
Details
     

 05-30-2007
0.50
Connect 6AWG from Bat Relay to Main Buss
Details
       

 05-28-2007
0.50
Install P-Lead's / Grounds to Ignition Switch
Details
       

 05-28-2007
0.50
Connect Wires for Low-Voltage Warning Lamp
Details
       

 05-28-2007
0.50
Connect Right P-Lead / Ground to Right Mag
Details
       

 05-28-2007
0.50
Connect Left P-Lead / Ground to Left Mag
Details
       

 05-27-2007
0.50
Install Solder Sleeve's on P-Leads
Details
       

 05-27-2007
0.50
Install 2 awg Battery + Lead to Master Relay
Details
     

 05-27-2007
1.00
Drill Holes in Firewall for Wires; Install Alt Fld
Details
       

 05-26-2007
1.50
Install Shunt and 60amp Current Limiter
Details
       

 05-26-2007
0.50
Install Insulator Boots on Starter and Alternator
Details
       

 05-18-2007
1.00
Install 18awg Alternator Field Wire
Details
       

 05-17-2007
1.00
Install Voltage Regulator - B&C LR3C
Details
     

 05-12-2007
0.50
Secure Alternator B-Lead with Adel Clamps
Details
       

 05-12-2007
1.00
Install Dynon Ammeter Shunt
Details
     

 05-12-2007
0.50
Fabricate 4 AWG Alternator B-Lead
Details
       

 05-12-2007
0.50
Bolt 4 AWG B-Lead to Shunt and Alternator
Details
       

 05-11-2007
0.50
Install Primer Line from Gascolator to Valve
Details
       

 05-09-2007
1.50
Fabricate and Install Bracket for Primer Valve
Details
     

 05-05-2007
1.00
Re-Safety Wire Alternator Tension Arm Bolts
Details
       

 05-05-2007
1.00
Install Slick Harnesses on Mags
Details
       

 05-05-2007
1.00
Install EGT Probes for Cylinders 1 and 3
Details
     

 04-29-2007
1.00
Install EGT Probes on Cylinders 2 and 4
Details
     

 04-27-2007
2.00
Trim Crossover Pipes for O-320; Install Headers
Details
       

 04-27-2007
1.00
Loosely Install Exhaust Pipe Supports
Details
       

 04-27-2007
1.00
Install Heat Muff and Tail Pipes
Details
       

 04-27-2007
1.00
Adjust and Tighten All Exhaust Supports / Hardware
Details
       

 04-26-2007
0.50
Safety Wire Prop Bolts
Details
     

 04-26-2007
0.50
Remove Plastic Spiral Tubing from Low Pressure Lin
Details
       

 04-26-2007
0.50
Adel Clamp Manifold Pressure Hose to Engine Mount
Details
     

 04-11-2007
1.00
Re-Route Engine Control Cables
Details
       

 04-11-2007
1.00
Re-Route Engine Control Cables
Details
     

 04-09-2007
0.50
Replace Manifold Pressure Firewall Bulkhead Fittin
Details
       

 04-09-2007
2.00
Remove Prop & Spacer, Reinstall with Spinner Bulkh
Details
       

 04-09-2007
0.50
Adel Clamp Engine Cables to Subpanel Bracket
Details
     

 04-01-2007
2.00
Run Engine Control Cables through Firewall
Details
       

 04-01-2007
2.00
Punch Holes in Firewall for Eyeball Cable Mounts
Details
       

 04-01-2007
1.00
Bolt Throttle and Mixture Cables to Support Bracke
Details
     

 04-01-2007
1.00
Bolt Throttle and Mixture Cable Ends to Carburetor
Details
       

 03-31-2007
0.50
Install Braided Engine Grounding Strap
Details
       

 03-30-2007
2.00
Install Parking Brake, Carb Heat, Throttle, Mixtur
Details
       

 03-30-2007
1.00
Install Panel and Vents Permanently
Details
       

 03-30-2007
1.00
Drill and Install Bracket for Engine Control Cable
Details
       

 03-29-2007
0.50
Install Manifold Pressure Line
Details
       

 03-29-2007
1.50
Drill/Dremel Holes in Subpanel for Harnesses/Cable
Details
     

 03-28-2007
0.50
Wrap Low Pressure Lines with Spiral Tubing
Details
       

 03-28-2007
1.50
Temporarily Install Panel; Mark Subpanel for Cutou
Details
       

 03-28-2007
1.00
Rivet New Rudder Stops to Fuselage
Details
       

 03-28-2007
0.50
Install Tach Cover
Details
     

 03-28-2007
3.00
Drill/Dremel Holes in Subpanel for Harnesses/Cable
Details
       

 03-24-2007
0.50
Secure P14 2 AWG Starter Wire with Adel Clamps
Details
       

 03-24-2007
0.50
Secure P14 2 AWG Starter Wire with Adel Clamps
Details
       

 03-24-2007
0.50
Install Oil Temp and Carb Temp Senders
Details
       

 03-24-2007
0.50
Install Dynon CHT Probes
Details
       

 03-23-2007
1.00
Safety Wire Dipstick Tube / Alternator Bolts
Details
       

 03-23-2007
1.00
Install P14 2 AWG to Starter and Contactor
Details
       

 03-22-2007
1.00
Install Sensenich Fixed Pitch Prop and Spacer
Details
       

 03-22-2007
0.50
Install Oil Filler Tube and Dipstick
Details
     

 03-22-2007
1.00
Install Firewall Forward Fuel Lines
Details
       

 03-22-2007
1.00
Install Breather Tube
Details
       

 03-22-2007
1.00
Install Alternator
Details
       

 03-21-2007
1.00
Wrap and Secure Right Brake Line
Details
       

 03-21-2007
1.00
Wrap and Secure Left Brake Line
Details
       

 03-21-2007
0.50
Install Carburetor and Control Bracket
Details
     

 03-20-2007
2.00
Install Pegasus Steel Braided Brake Lines
Details
       

 03-18-2007
1.00
Hang Engine
       

 03-18-2007
1.00
Hang Engine
     

 03-18-2007
1.00
Hang Engine
       

 03-18-2007
1.00
Hang Engine
       

 03-18-2007
1.00
Hang Engine
       

 03-18-2007
1.00
Hang Engine
Details
       

 03-17-2007
0.00
Unhook Engine from Cable; Roll Engine to Plane
       

 03-17-2007
0.00
The Engine is Ready to be Hung!
       

 03-17-2007
0.00
The Engine is in the Basement!
       

 03-17-2007
0.00
Snap Pictures of Data Plate
       

 03-17-2007
0.00
Set Pallet / Engine Down on Furniture Dolly
       

 03-17-2007
0.00
Roll Engine Up Front Walk; Lift Onto Porch
       

 03-17-2007
0.00
Remove Shrink Wrap from Engine
       

 03-17-2007
0.00
Lift Engine Into House, Roll to Basement Door
       

 03-17-2007
0.00
Hook the Engine to the Hoist
       

 03-17-2007
0.00
Hook Engine to Cable; Lower to Basement
Details
       

 03-17-2007
0.00
Hoist Engine / Pallet Out of Van
       

 03-17-2007
0.00
Hang Steel Cable above the Stairs
Details
       

 03-17-2007
0.00
Admire New Gold Engine
       

 03-16-2007
0.00
Pickup Engine from PJAX Terminal
Details
       

 03-16-2007
0.00
Open Engine Crate
Details
       

 03-13-2007
0.50
Install Dimmer Switch Knob
Details
     

 03-10-2007
2.00
Set Nose Wheel Break-Out Force; Cotter Pin
Details
       

 03-10-2007
1.00
Safe Tie the Bolts on the Calipers
Details
       

 03-10-2007
1.00
Install NACA Ducts
Details
       

 03-03-2007
1.00
Lift Plane / Install Landing Gear
Details
       

 03-03-2007
1.00
Lift Plane / Install Landing Gear
Details
       

 03-03-2007
1.00
Lift Plane / Install Landing Gear
Details
       

 03-03-2007
3.00
Install Aluminum Brake Lines in Cabin
Details
       

 03-02-2007
1.00
Install Parking Brake Fittings / Bolt to Firewall
Details
     

 03-02-2007
1.00
Install Left Main Wheel on Axle; Drill / Cotter Pi
Details
     

 03-01-2007
2.00
Install Right Main Wheel on Axle; Drill / Cotter P
Details
       

 02-28-2007
0.50
Rivet Parking Brake Bracket to Firewall
Details
       

 02-28-2007
1.50
Fabricate New Parking Brake Valve Bracket
Details
       

 02-27-2007
0.50
Drill Out F-6122-1 Brake Bracket from Firewall
Details
     

 02-25-2007
2.50
Install Flexible Brake Lines in Cabin
Details
       

 02-24-2007
3.00
Bolt Nose Wheel to Fork; Bolt Fork to Nose Gear
Details
       

 02-23-2007
2.00
Fabricate U-408 Spacers; Bolt Caliper Brackets
Details
       

 02-18-2007
1.00
Debur U-810 Wheel Pant Brackets
Details
     

 02-11-2007
1.00
Ream / Bolt U-403 Brake Brackets to Gear
Details
     

 02-10-2007
2.00
Make New Rudder Stops
Details
       

 02-10-2007
2.00
Fabricate / Install Nylon Canopy Guides
Details
       

 02-06-2007
3.00
Wet Sand/Polish Panel, Install Instruments
Details
       

 02-06-2007
3.00
Wet Sand/Polish Panel, Install Instruments
Details
       

 01-23-2007
0.00
Daisy and Stevie Sitting in the Plane
Details
       

 01-23-2007
0.00
Daisy and Stevie Flying Around the Basement
Details
       

 01-22-2007
0.50
Prime Plastic NACA Ducts
Details
     

 01-22-2007
2.00
Prime Emp Fairing; Install Fairing, Rudder, Elevat
Details
       

 01-21-2007
2.00
Sand, Countersink, Fill Empennage Fairing Pinholes
Details
       

 01-20-2007
2.00
Prime, Remove Masking, Install on Fuselage
Details
       

 01-20-2007
0.00
Finished Canopy Pictures
Details
       

 01-20-2007
0.00
Finished Canopy Pictures
Details
       

 01-19-2007
1.50
Sand Targa Strip & Right Side Rail / Corner
Details
       

 01-19-2007
1.50
Sand Left Corner, Clean, Wonder-Fil Pinholes
Details
       

 01-18-2007
1.50
Sand Rage; Apply a 2nd Layer of Filler
Details
       

 01-18-2007
1.50
Acetone / Sand Primer; Clean; Rage
Details
       

 01-17-2007
1.00
Sand Micro, Begin Countersinking
Details
     

 01-17-2007
0.50
Prime and Inspect Canopy
Details
       

 01-17-2007
0.50
Prime and Inspect Canopy
Details
       

 01-17-2007
0.50
Prime and Inspect Canopy
Details
       

 01-16-2007
2.00
Sand Rage Along Front Corners & Targa Strip
Details
       

 01-16-2007
1.00
Micro Empennage Fairing Again
Details
     

 01-15-2007
1.00
Sand Micro on Fairing; Rage Canopy
Details
     

 01-15-2007
1.00
Sand Micro on Empennage Fairing
Details
     

 01-14-2007
2.00
Micro Inside Edges of Fairing; Remove Canopy
Details
       

 01-13-2007
3.00
Install Lower Aluminum Fairing Strips
Details
       

 01-08-2007
2.00
Drill & Tap Longerons for Fairing; Install Nutplat
Details
       

 01-07-2007
3.00
Drill / Rivet Empennage Fairing Nutplates
Details
       

 01-06-2007
1.00
Drill Stabilizers for Empennage Fairing Nutplates
Details
       

 01-06-2007
1.50
Drill Fairing to Stabilizers / Heat to Fit
Details
       

 01-06-2007
1.50
Drill Fairing to Stabilizers / Heat to Fit
Details
       

 01-04-2007
1.00
Initial Trimming of Empennage Fairing
Details
     

 01-01-2007
0.50
Drill, Debur, Dimple, Rivet Nutplates for Access C
Details
       

 01-01-2007
0.50
Bolt Vertical Stabilizer to Fuselage
Details
       

 12-31-2006
0.50
Rivet / Bolt Elevator Stop to Fuselage
Details
     

 12-31-2006
1.50
Prime Tips; Bolt to Fuselage
Details
       

 12-31-2006
2.00
Fabricate / Prime / Rivet F-781B to Front Spar
Details
       

 12-30-2006
3.00
Shape (Rage), Sand, Fill Pinholes on Both Tips
Details
       

 12-30-2006
1.00
Mask Plexiglass in Prep for Priming
Details
       

 12-24-2006
2.00
Sand / Clean / Prime Left Elevator
Details
       

 12-22-2006
2.00
Prime Right Elevator; Mask / Rage Left Elevator
Details
       

 12-19-2006
0.50
Removing Masking / Clean / Store
Details
       

 12-18-2006
0.50
Tape Perimeter of Plexiglass - Prep for Primer
Details
     

 12-18-2006
2.00
Prime Rudder Tips / Rage Right Elevator
Details
       

 12-17-2006
2.00
Unmask/Store Vert Stab; Rage/Sand/Mask Rudder
Details
       

 12-16-2006
4.00
Prime Vertical Stabilizer Tip; Rage/Sand Rudder
Details
       

 11-23-2006
2.00
Sand Micro, Apply Evercoat Xtreme Rage, Sand
Details
       

 11-12-2006
1.50
Sand Bottom Tip (Micro) / Epoxy Nuts for Strobe
Details
       

 11-12-2006
1.50
Sand / Clean / Micro Vert Stabilizer Tip
Details
     

 11-12-2006
0.00
Photo shoot - Center Handle Holding Canopy Open
Details
       

 11-12-2006
1.50
Install Center Canopy Handle / Latch
Details
       

 11-12-2006
1.50
Fabricate/Install Line from Valve to Elec Pump
Details
       

 11-12-2006
1.00
Drill / Bolt Latches to Canopy Frame
Details
       

 11-10-2006
0.00
Faxed Order for Sensenich FP Prop
Details

 11-09-2006
1.00
Sand Fiberglass on Bottom Tip & Micro
Details
     

 10-30-2006
1.50
Sand/Clean/Fiberglass Bottom Tip
Details
       

 10-29-2006
1.50
Micro Bottom Rudder Tip & Vert Stab Tip
Details
       

 10-25-2006
1.50
Countersink Bottom Tip / Flox & Rivet
Details
       

 10-24-2006
2.00
Final Trim / Drill Bottom Tip to Rudder
Details
       

 10-21-2006
1.00
Trim Rudder Bottom Tip
Details
       

 10-21-2006
2.00
Sand Vertical Stabilizer & Rudder
Details
       

 10-08-2006
1.50
Sand, Clean, Micro Rudder & Vertical Stabilizer
Details
       

 10-08-2006
0.50
Cut Hole in Rudder Bottom Tip for Lights
Details
       

 10-07-2006
2.00
Targa Strip Photo's
Details
       

 10-07-2006
2.00
Sand Micro on Targa Stip; Cut Trailing Edge
Details
       

 10-05-2006
3.00
Sand Targa Strip, Clean, Micro
Details
       

 10-01-2006
0.50
Remove Tape from Targa Strip; Open Canopy
Details
       

 10-01-2006
1.50
Add Inside Layer of Fiberglass on Targa Strip
Details
       

 09-30-2006
1.00
Mask and Tape for Targa Strip
Details
       

 09-30-2006
1.00
Fiberglass Vertical Stabilizer Tip
Details
       

 09-30-2006
1.00
Fiberglass Rudder Tip
Details
       

 09-30-2006
2.00
Create Targa Strip using 4 Layers of Fiberglass
Details
       

 09-29-2006
1.00
Sand Rudder & Vertical Stabilizer Tips
Details
       

 09-29-2006
1.00
Sand Horizontal Stabilizer Tips
Details
       

 09-28-2006
1.00
Sand, Clean, Micro Rudder & Vertical Stabilizer Ti
Details
       

 09-28-2006
0.50
Build Up Horizontail Stab Tips with Mirco
Details
       

 09-25-2006
1.00
Fabricate Honeycomb Cap; Flox to Vert Stabilizer
Details
     

 09-24-2006
1.50
Flox/Rivet Vertical Stabilizer and Rudder Tips
Details
       

 09-24-2006
0.50
Countersink Tip; Debur & Dimple Aluminum
Details
       

 09-23-2006
2.00
Trim, Drill, Countersink Upper Tip
Details
       

 09-23-2006
1.00
Trim & Drill Fiberglass Tip to Vertical Stablizer
Details
     

 09-23-2006
1.50
Sand Micro on All Fiberglass Tips
Details
       

 09-23-2006
1.00
Remove All Spraylat and Tape
Details
       

 09-23-2006
0.50
Debur & Dimple Rudder for Upper Fiberglass Tip
Details
     

 09-07-2006
1.00
Sand Fiberglass; Add Micro
Details
       

 09-07-2006
2.00
Sand Fiberglass; Add Micro
Details
       

 09-06-2006
2.50
Sand Micro on Side Skirts
Details
       

 09-06-2006
1.50
Add 1 Layer of Fiberglass Around All Tips
Details
       

 09-05-2006
1.50
Sand, Clean, Micro Horizontal Stabilizer Tips
Details
       

 09-05-2006
1.00
Sand, Clean, and Mirco Canopy Skirts
Details
       

 09-05-2006
1.50
Sand, Clean, and Fiberglass over Counterweights
Details
       

 09-04-2006
1.00
Flox Honeycomb to Horizontal Stabilizer Tips
Details
       

 09-04-2006
0.50
Flox Gaps on Trailing Edges of Elevator Tips
Details
       

 09-02-2006
1.50
Sand Flox on Elevator Tips
Details
       

 09-02-2006
0.50
Cutout Honeycomb to Closeout Tips
Details
     

 08-31-2006
1.00
Flox/Rivet Tips to Horizontal Stabilizer
Details
       

 08-31-2006
1.00
Flox Gaps Between Elevators and Tips
Details
       

 08-30-2006
0.75
Drill Horizontal Stabilizer Tips
Details
       

 08-30-2006
0.75
Countersink Horizontal Stabilizer Tips
Details
       

 08-29-2006
2.00
Sand Fiberglass Reinforced Corners
Details
       

 08-29-2006
0.25
Install Canopy; Inspect Fit - Right Side
Details
       

 08-29-2006
0.25
Install Canopy; Inspect Fit - Left Side
Details
       

 08-28-2006
2.00
Sand Elevator Tips; Trim Horiz. Stab. Tips
Details
       

 08-27-2006
1.50
Flox/Rivet Tips to Elevators
Details
     

 08-27-2006
1.50
Add 2 More Layers of Fiberglass on Corners
Details
       

 08-26-2006
1.00
Remove Elevators, Sand Flanges, Clean, Dimple
Details
       

 08-26-2006
2.00
Reinforce Inside Corners with Fiberglass
Details
       

 08-26-2006
1.00
Mirco Canopy Corners; Mirco Right Elev Lead
Details
       

 08-26-2006
2.00
Countersink Right Tip; Trim/Drill Left Tip
Details
       

 08-19-2006
2.00
Lighten Right Elevator Lead; Trim Tip
Details
       

 08-18-2006
2.00
Final Sanding Along Side Rails; Open Canopy
Details
       

 08-17-2006
6.00
Fiberglass Side Rails and Corners to Fill Gaps
Details
       

 08-16-2006
1.00
Bend Corners Down and In
Details

 08-08-2006
0.00
Crappy Canopy Fit to Fuselage Photo's for Matt - 5
Details
       

 08-08-2006
0.00
Crappy Canopy Fit to Fuselage Photo's for Matt - 4
Details
       

 08-08-2006
0.00
Crappy Canopy Fit to Fuselage Photo's for Matt - 3
Details
       

 08-08-2006
0.00
Crappy Canopy Fit to Fuselage Photo's for Matt - 2
Details
       

 08-08-2006
0.00
Crappy Canopy Fit to Fuselage Photo's for Matt - 1
Details
       

 08-03-2006
1.00
Sand Pinholes That Were Filled With Micro
Details
       

 08-03-2006
1.00
Fill In Pinholes with Micro using a Razor Blade
Details
     

 08-02-2006
2.00
Sand, Clean, Micro Over Fiberglass
Details
       

 08-02-2006
2.00
Sand Micro
Details
       

 08-02-2006
0.00
Learn How to Cap the Fiberglass Stabilizer Tips
Details
       

 08-01-2006
2.00
Sand the Flox Filler - Ready for Fiberglass
Details
       

 08-01-2006
0.50
Remove Peel Ply and Begin Sanding
Details
       

 08-01-2006
1.00
Make Fiberglass Sandwich for Front Edge of Canopy
Details
       

 08-01-2006
0.50
Apply 2 Layers of Fiberglass to Front of Canopy
Details
       

 07-31-2006
1.00
Sand/Clean Panel to Prime Again - Gray This Time
Details
       

 07-31-2006
2.00
Sand the Flox Around Ears; Tape/Sand Plexi & Skin
Details
       

 07-31-2006
0.50
Prime Panel Using Gray Epoxy Primer
Details
       

 07-31-2006
0.50
Inspect Panel and Canopy
Details
       

 07-31-2006
0.50
Flox Front Edge of Canopy and Top Skin
Details
     

 07-24-2006
1.00
Sand/Acetone Panel and Covers for Priming
Details
     

 07-24-2006
1.00
Prime Panel with White Epoxy Primer
Details
       

 07-24-2006
0.50
Inspect Priming
Details
       

 07-24-2006
1.00
Flox Aluminum Ears/Tabs to Plexiglass
Details
       

 07-22-2006
0.25
Steven Signing/Dating Tailcone
Details
       

 07-22-2006
0.25
Heather Signing/Dating Tailcone
Details
       

 07-22-2006
2.00
Create Anti-Rotation Ring for Ignition Switch
Details
       

 07-15-2006
1.00
Drill Holes for Toggle Switches
Details
       

 07-15-2006
1.00
Debur/Edge Prep Anti-Rotation Strips/Panel for Swi
Details
       

 07-15-2006
1.00
Acetone/Alodine/Rivet Anti-Rotation Strips to Pane
Details
       

 07-10-2006
0.50
Bolt/Torque Lower Center Two Engine Mount Bolts
Details
     

 07-07-2006
1.00
Drill Holes for Cabin Heat & Parking Brake Cables
Details
       

 07-07-2006
1.00
Drill Hole for Low Voltage Light; Trim Bracket
Details
       

 07-06-2006
1.00
Fabricate/Install Side Clips for Plexiglass
Details
       

 07-06-2006
2.00
Cut Holes for Trim Indicators, ELT and Ignition Sw
Details
       

 07-05-2006
1.00
Rivet Angle to Andair Fuel Valve Cover
Details
       

 07-05-2006
1.00
Fabricate/Install Center Clip for Plexiglass
Details
       

 07-04-2006
1.00
Screw Canopy to Frame
Details
       

 07-03-2006
1.00
Cleco Canopy to Frame
Details
       

 06-25-2006
1.00
Repaint Interior Canopy Frame
Details
     

 06-25-2006
2.00
Install Gascolator and VA-129 Fuel Line
Details
       

 06-24-2006
0.50
Seal Firewall Recess with High-Temp RTV
Details
       

 06-24-2006
0.50
Need Washers/Spacers for Lower Center Engine Mount
Details
     

 06-24-2006
0.50
Install TG-10 Heater Vent; Drill Hole for Cable
Details
       

 06-24-2006
0.25
Install C-725 Ball Stud/Canopy Strut Mounts on Fra
Details
       

 06-24-2006
2.00
Drill/Bolt Engine Mount to Firewall
Details
       

 06-24-2006
0.50
Drill NACA Ducts to Fuselage
Details
       

 06-24-2006
0.50
Countersink Side Skins for NACA Duct
Details
       

 06-23-2006
0.75
Drill TG-10 Vent to Firewall; Install Fuel Pressur
Details
       

 06-23-2006
0.75
Connect Master/Starter Relays with Copper Bars
Details
       

 06-20-2006
0.25
Install Spike Catching Diodes on Relays
Details
     

 06-17-2006
2.00
Paint Dashboard Flat Black
Details
       

 06-17-2006
1.00
Install Ground Lead, Trans Oil Line, Approach Hub
Details
       

 06-13-2006
1.00
Install Fuel Pump, Gascolator Fittings
Details
       

 06-13-2006
1.00
Install Battery Tray, Battery, and Relays
Details
     

 06-11-2006
2.00
Rivet Top Skin & Side Skirts to Canopy Frame
Details
       

 06-11-2006
2.00
Rivet Relay and Gascolator Doublers & Recess to Fi
Details
       

 06-11-2006
2.00
Rivet Reinforcement Panels to Top Skin & Frame
Details
       

 06-01-2006
2.00
Fabricate/Install SL40 Support Angles in Sub Panel
Details
       

 05-31-2006
1.00
Drill/Install Ground Tabs
Details
       

 05-31-2006
2.00
Drill/Cleco Busses, Approach Sys Hub, Diode
Details
       

 05-30-2006
0.50
Trim Air Gizmo Tray for Garmin 396 Handheld
Details
     

 05-30-2006
0.50
Rivet Nutplates to Relay Doubler; Cleco Gas/Relay
Details
       

 05-30-2006
0.50
Install MS21051-L3 Nutplates for Adel Clamps for H
Details
     

 05-30-2006
1.00
Fabricate/Install Support Strip for Trays
Details
       

 05-30-2006
0.50
Drill/Countersink F-7127D Relay Doubler
Details
       

 05-30-2006
1.00
Cut Slot in Sub-Panel for SL40 Comm Tray
Details
       

 05-30-2006
0.50
Alumaprep/Prime Gascolator and Relay Doublers
Details
     

 05-30-2006
0.50
Acetone/Alodine Rails/Trays; Install Trays
Details
       

 05-28-2006
0.50
Mark Subpanel for SL40 Comm Cutout
Details
       

 05-28-2006
1.50
Drill Air Gizmo Tray to Rails for Garmin 396 GPS
Details
       

 05-27-2006
1.00
Drill SL40 Comm Tray to Rails
Details
       

 05-27-2006
1.00
Drill GTX327 Transponder Tray to Rails
Details
       

 05-27-2006
1.00
Drill GMA340 Audio Tray to Rails
Details
       

 05-26-2006
1.00
Rivet Support Angles for Radio Stack to Panel
Details
       

 05-26-2006
1.00
Fabricate / Drill Support Angles for Radio Stack
Details
       

 05-25-2006
0.50
Drill Firewall for Hose Nutplates
Details
       

 05-24-2006
1.50
Install Transducer Manifold; Seal Brake Reservoir
Details
       

 05-23-2006
2.00
Inventory Firewall Forward Kit
Details
     

 05-22-2006
2.00
Permanently Install Rear Canopy Window
Details
       

 05-21-2006
1.00
Drill VA-161 Gascolator Bracket to Firewall; Dimpl
Details
       

 05-21-2006
0.50
Drill F705 for Static Line; Route to Sub Panel
Details
       

 05-21-2006
0.50
Drill F-7127C Battery Retainer Strap
Details
     

 05-21-2006
1.00
Countersink/Edge Prep VA-161 Gascolator Bracket
Details
       

 05-20-2006
0.50
Rivet F-7127A Angles to Battery Tray
Details
       

 05-18-2006
1.00
Drill Battery Support Angles to Box; Dimple Box
Details
       

 05-18-2006
0.50
Countersink F-7127A Angles; Paint Angles & Tray
Details
       

 05-16-2006
0.50
Drill Out Firewall Rivets for Battery Tray & Relay
Details
       

 05-15-2006
1.00
Fabricate Doubler Plate for Relays; Begin Bat Tray
Details
       

 05-14-2006
2.00
Cut Panel for Radios and GPS
Details
     

 05-12-2006
0.50
Temporarily Install Dynon's, Panel; Sit Back and E
Details
       

 05-12-2006
0.50
Drill Remaining Instrument Attach Holes
Details
       

 05-11-2006
0.50
Use Jig to Drill Instrument Attach Holes
Details
       

 05-11-2006
0.50
Temporarily Install Dynon EMS in Panel
Details
       

 05-11-2006
1.50
Mark / Punch Eight 3-1/8" Instrument Panel Holes
Details
       

 05-10-2006
0.25
The Firewall Forward Kit Arrived Today
Details
     

 05-10-2006
0.25
Open Firewall Forward Kit and Take to Basement
Details
       

 04-22-2006
2.00
Rivet Canopy Frame
Details
       

 04-22-2006
1.00
Mask/Prime Rollbar; Vibratite Screws for Rollbar
Details
       

 04-22-2006
3.00
C-702 Top Skin-Edge Prep, Dimple, Prime Inside
Details
       

 04-18-2006
2.00
Debur C-702 Skin; Prime More Canopy Parts
Details
       

 04-17-2006
1.00
Install Aft Strut Brackets; Prime Side Skirts
Details
       

 04-15-2006
2.00
Acetone, Alodine, Prime Canopy Frame
Details
       

 04-14-2006
0.50
Rebuild Paint Booth
Details
       

 04-12-2006
1.00
Position, Clamp, and Drill Aft Strut Brackets to D
Details
       

 04-12-2006
0.50
Countersink/Tap Forward Strut Brackets; Install
Details
       

 04-12-2006
0.50
Countersink WD-716 Frame for Strut Brackets
Details
       

 04-09-2006
2.00
Alumaprep, Alodine, Prime Canopy Frame Parts
Details
     

 04-01-2006
0.75
Drill Forward Strut Brackets to Frame; Tap Bracket
Details
       

 04-01-2006
0.25
Dimple Outboard Reinforcement Brackets
Details
     

 03-31-2006
1.00
Finish Deburring / Edge Prep of Reinf Brackets
Details
     

 03-30-2006
1.50
Begin Deburring / Edge Prep of Reinf Brackets
Details
       

 03-29-2006
1.50
Drill Strut Mounting Brackets; Debur Reinf Bracket
Details
       

 03-29-2006
1.00
Drill Handle to Left Side Skirt / Rail
Details
       

 03-23-2006
1.50
Fabricate Handle / Strut Mounting Brackets
Details
     

 03-22-2006
2.00
Countersink WD-716 and Debur Reinf Brackets
Details
       

 03-20-2006
0.50
Fabricate 6 F-7128C Clips
Details
     

 03-20-2006
2.00
Drill Reinforcement Brackets to Top Skin
Details
       

 03-11-2006
1.00
Drill Canopy Reinforcement Brackets to Frame
Details
     

 03-10-2006
2.00
Bend Flanges in Lightening Holes of F-7128 Reinfor
Details
     

 03-09-2006
0.50
Trim Top Edge of C-702 Ears to Match Side Skirts
Details
       

 03-09-2006
1.50
Countersink WD-725 Side Rails
Details
       

 03-08-2006
1.00
Trim, Measure, and Pre-Drill Side Skirts
Details
     

 03-08-2006
0.50
Trim Top and Aft Ends of Side Skirts
Details
       

 03-08-2006
0.50
Drill Side Skirts to Canopy Frame
Details
       

 03-08-2006
0.50
Drill Screw Holes in Side Skirts for Canopy Attach
Details
       

 03-08-2006
0.50
Debur/Dimple Side Skirts; Debur Side Rails
Details
       

 03-07-2006
1.00
Install Canopy with 4 Screws in Prep for Skirts
Details
       

 03-07-2006
3.50
Final Trimming of Aft Edge of Tip Up Plexiglass
Details
       

 03-07-2006
1.00
Drill Rollbar to #36, Tap for #6 Screws
Details
     

 03-07-2006
0.25
Dimple 2 Limited Access Holes for Rear Window
Details
       

 03-07-2006
0.25
Dimple 2 Holes in Top Skin over Support Channel
Details
       

 02-25-2006
2.00
Trim Forward Edge of Rear Window; Dimple Top Skin
Details
       

 02-25-2006
0.50
Match Drill Rear Window Backing Strip to Top Skin
Details
       

 02-25-2006
2.00
Mark & Trim Aft Edge of Tip Up Plexiglass
Details
       

 02-25-2006
1.50
Finish Match-Drilling Backing Strip; Debur
Details
       

 02-21-2006
0.50
Clamp Backing Strips to Top Skin; Create Drill Jig
Details
       

 02-20-2006
1.00
Cut Out Rear Window Backing Strips
Details
       

 02-20-2006
0.50
Create Template for Rear Window Support Strip
Details
       

 02-18-2006
1.50
Countersink Tip-Up Plexiglass
Details
       

 02-18-2006
1.50
Countersink Screw Holes in Rear Window Plexi
Details
       

 02-12-2006
1.00
Trim Aft Edge of Tip Up Plexiglass
Details
     

 02-12-2006
1.50
Trim Aft Edge of Rear Window; Enlarge Frame Holes
Details
       

 02-12-2006
1.25
Notch Rear Window and Install for Drilling
Details
       

 02-12-2006
2.00
Install Canopy on Frame, Drill Plexi to Frame
Details
       

 02-12-2006
1.00
Drill Rear Window To Rollbar and Aft Top Skin
Details
       

 02-12-2006
0.50
Drill Bottom Flange of C-704 Splice Plate; Counter
Details
       

 02-12-2006
0.25
Drill Aft C-702 to WD-716 Tube to #30
Details
     

 02-12-2006
0.50
Debur Rear Window Holes, Tape for Final Trim
Details
       

 02-04-2006
0.50
Remove Plexi, Drill Splice Plate to Channel
Details
       

 02-04-2006
1.00
Prep New F-631A Channels
Details
     

 02-04-2006
0.50
Pre-Drill Pilot Holes in Side Rails for Plexiglass
Details
       

 02-04-2006
1.00
Measure/Drill Pilot Holes in Frame for Plexiglass
Details
       

 02-04-2006
0.50
Install Plexi, Position & Clamp F-631A Channels
Details
       

 02-04-2006
0.50
Drill C-703 Splice Plate / Jig to 1 F-631A Channel
Details
       

 02-04-2006
1.00
Clamp & Drill Right Side Rail to F-631A Channel
Details
       

 02-04-2006
1.00
Clamp & Drill Left Side Rail to F-631A Channel
Details
       

 01-31-2006
1.00
Trim Notches in Ears One More Time
Details
       

 01-28-2006
1.00
Mark/Trim Front and Side Edges, Trim and Debur
Details
       

 01-28-2006
1.00
Final Iteration for Front and Sides
Details
       

 01-28-2006
1.00
Enlarge Notches in Ears, Final Trial Fit
Details
       

 01-28-2006
1.00
Cut Aft edge of Rear Window; Debur
Details
       

 01-14-2006
1.00
Trim Front Edge, Debur, Trial Fit
Details
       

 01-14-2006
0.50
Mark Canopy For Next Cut
Details
       

 01-14-2006
0.50
Mark and Tape Rear Window for Next Cut
Details
     

 01-11-2006
1.00
Trial Fit Canopy Again; Mark for Next Cuts
Details
       

 01-11-2006
1.00
The Big Cut - Part 2
Details
       

 01-11-2006
1.00
The Big Cut - Part 1
Details
       

 01-10-2006
0.50
Trial Fit Canopy Again
Details
       

 01-10-2006
0.50
Tape for the Big Cut; Mark Rear Window for Next Cu
Details
       

 01-10-2006
0.50
Tape Canopy Edges to Fuselage; Trace Rear Window
Details
       

 01-10-2006
1.00
Plexiglass - Side Edge Cuts
Details
       

 01-10-2006
1.00
Plexiglass - Front Edge Cut
Details
       

 01-10-2006
1.00
Mark the Canopy for the Big Cut
Details
       

 01-09-2006
1.00
Trial Fit Canopy to Fuselage; Mark for Next Cuts
Details
       

 01-09-2006
1.50
Plexiglass - Initial Side Cuts
Details
       

 01-09-2006
1.50
Mark Centerline; Initial Plexiglass Cuts
Details
       

 01-08-2006
1.00
Brush 2nd Coat of Spray-Lat on Canopy
Details
       

 01-07-2006
1.00
Brush 1st Coat of Spray-Lat on Canopy
Details
       

 12-28-2005
0.50
Set Plexiglass Bubble on Canopy Frame
Details
       

 12-24-2005
1.00
Rivet Side Rails to Canopy Frame
Details
       

 12-24-2005
0.50
Cleco Top Skin to Frame, Install Frame to Fuselage
Details
       

 12-24-2005
1.00
Clamp/Drill C-704 Splice Plate to One F-631 Channe
Details
       

 12-24-2005
1.50
Alodine Splice Plates, Rails, Wedges; Rivet
Details
       

 12-23-2005
0.50
Final Drill Right C-613, WD-716, WD-725, C-723
Details
       

 12-23-2005
0.50
Final Drill Left C-613, WD-716, WD-725, C-723
Details
       

 12-23-2005
1.00
Fabricate C-723 Wedges
Details
     

 12-23-2005
1.00
Countersink Side Rails and Canopy Frame Rails
Details
       

 12-20-2005
1.00
Measure/Drill WD-725 Side Rail Ends
Details
       

 12-20-2005
0.50
Finish Drilling Left Side Rail
Details
       

 12-20-2005
0.50
Disassemble Frame for Deburring
Details
     

 12-20-2005
1.00
Clamp/Drill Right Side Rail
Details
       

 12-20-2005
1.00
Clamp/Drill Left Side Rail
Details
       

 11-23-2005
0.50
Newspaper/TV - Installed Panel and Seats
Details
       

 11-20-2005
1.50
Fabricate Spacers; Edge Prep/Flute F631 Channels
Details
       

 11-20-2005
0.50
Fabricate Shim for Top Skin
Details
     

 11-19-2005
2.00
Countersink Frame/Rivet Splice Plate & Tabs
Details
       

 11-18-2005
2.00
More Gap Seal Trimming; Begin Deburring Frame
Details
       

 11-17-2005
1.50
Match Drill Top Skin to Frame; Mark Goosenecks
Details
       

 11-17-2005
0.50
Drill VA-104 Latch Handle Ball, Tap & Install
Details
     

 11-17-2005
1.00
Drill Canopy Frame Hinges (Goosenecks)
Details
       

 11-16-2005
1.00
UHMV Tape Top Skin; Debur Hinges; Cleco
Details
       

 11-16-2005
1.00
Trim Sub Panel & Gap Seal for Canopy Frame
Details
       

 11-16-2005
1.00
Fit Canopy Frame to Fuselage
Details
       

 11-16-2005
1.00
Clamp/Drill C614 Splice Plate to Frame
Details
       

 11-15-2005
1.50
Rivet Cap Channels to F704 Bulkheads
Details
       

 11-15-2005
1.50
Match Drill Cap Channels to F704; Debur
Details
       

 11-14-2005
0.50
Tap and Install C-710 Pushrod
Details
       

 11-14-2005
0.50
Rivet Canopy Support Angles to Side Skin
Details
       

 11-14-2005
1.50
Match Drill Latch Handle Assembly to Left Side Ski
Details
       

 11-13-2005
0.50
UHMV and Assemble Canopy Latch Handles
Details
       

 11-13-2005
1.00
Rivet Top of Right Skin to Longeron; Rivet F-794 V
Details
       

 11-13-2005
1.00
Rivet Top of Left Skin to Longeron; Rivet F-794 Ve
Details
       

 11-03-2005
1.00
Bend C-606 Links, Bolt to Idler Arm, Brackets and
Details
       

 11-02-2005
0.50
Notch Latch Support Angles for Ball Handle
Details
       

 11-02-2005
0.50
Install WD-617 Latch Weldment; Rivet VS-411PP Brac
Details
       

 11-02-2005
2.00
Fabricate Canopy Latch Handle Mechanism
Details
       

 11-02-2005
1.00
Drill the C-611 Canopy Latch Bushing Blocks
Details
       

 11-02-2005
1.00
Cut/Debur Slots for Canopy Latch Handle
Details
     

 11-01-2005
0.50
Shave Tops of Spacer Blocks
Details
       

 11-01-2005
1.50
Rivet: F745 Ribs to Firewall; Sub-Panels to Bulkhe
Details
       

 11-01-2005
1.00
Rivet Engine Control Bracket to Center Sub Panel;
Details
       

 11-01-2005
0.50
Match-Drill F-644 Ribs to Spacers/F745 Ribs
Details
       

 11-01-2005
0.50
Finish Riveting Sub-Panel components
Details
     

 11-01-2005
0.50
Drill Spacers for Canopy Hinges
Details
       

 11-01-2005
1.00
Create Drill Template for Canopy Latch; Drill Skin
Details
       

 11-01-2005
0.50
Cleco Center Sub Panel in Place; Cleco Top Skin
Details
       

 10-30-2005
1.00
Punch 2" Hole for Heat Valve; Debur
Details
       

 10-23-2005
1.00
Rivet Top Channel - Forward and Aft
Details
       

 10-23-2005
1.00
Rivet Center Support Bracket; Bolt Pedal
Details
       

 10-23-2005
1.00
Proseal Screens to Vent Fittings
Details
     

 10-23-2005
1.00
Install VA-107 Brake Reservoir
Details
       

 10-23-2005
1.00
Forward Fuselage Riveting
Details
       

 10-23-2005
1.00
Drill Firewall for Control Cables
Details
     

 10-18-2005
1.00
Begin Riveting Subpanel Components
Details
       

 09-30-2005
3.00
Wash and Prime Forward Fuselage Parts
Details
       

 09-29-2005
4.00
Debur All Forward Fuselage Parts
Details
     

 09-27-2005
0.50
Rivet F703B Angles to Panel
Details
       

 09-27-2005
2.00
Debur/Dimple F771 Top Skin
Details
       

 09-27-2005
1.50
Countersink Panel; Alodine Panel/Bracket
Details
       

 09-26-2005
1.00
Trim Vents; Drill F793 Brackets to Skins
Details
       

 09-26-2005
0.50
Install (Cleco) Vents and Panel
Details
       

 09-26-2005
0.50
Drill Engine Control Bracket to Panel
Details
       

 09-22-2005
0.50
Fabricate F793 vent brackets
Details
     

 09-18-2005
2.00
Match Drill Top Skin to Fuselage
Details
       

 09-18-2005
1.00
Drill F721D Angles to Panel and Deck
Details
       

 09-18-2005
1.00
Drill F721C Angles to Panel and Deck
Details
       

 09-17-2005
1.00
Match Drill Forward Fuselage Structure
Details
       

 09-17-2005
0.75
Mark Centerlines on Flanges; Cleco Skin
Details
       

 09-17-2005
1.00
Drill F768C Outboard Seal Support Angles
Details
       

 09-17-2005
0.25
Cleco Panel to Ribs
Details
       

 09-13-2005
1.00
Fabricate F768D Seal Support Angles
Details
       

 09-13-2005
1.00
Drill F644 Ribs & Control Bracket to Cen
Details
       

 09-12-2005
0.25
Screw Side Skins to Canopy Frame
Details
       

 09-12-2005
4.00
Fabricate F703B/C Panel Support Angles
Details
     

 09-12-2005
1.75
Fab/Match Drill Center Sub Panel Parts
Details
       

 09-05-2005
1.00
Fabricate Misc Forward Fuselage Angles
Details
     

 09-04-2005
0.25
Rivet Top Channel to F706 Bulkhead
Details
       

 09-04-2005
0.25
Debur/Dimple Side/Top Skins & F706 Blkhd
Details
       

 09-04-2005
1.00
Bolt Canopy Frame to F705 Bulkhead
Details
       

 09-03-2005
0.25
Rivet Top Channel to Aft Canopy Frame
Details
       

 09-03-2005
1.00
Rivet Interior 0.063 Strips to Channels
Details
       

 09-03-2005
0.25
Rivet Aft Channels to Splice Plate/Angle
Details
       

 09-03-2005
0.25
Canopy Frame Riveting Complete
Details
       

 09-03-2005
0.25
Bolt/Screw Attach Angles to Frame
Details
       

 09-03-2005
3.00
Alumaprep / Prime Canopy Frame Parts
Details
       

 08-28-2005
0.50
Drill F732E Side Angles to Channel
Details
       

 08-28-2005
1.00
Drill F732A Channel to Frame & Fuselage
Details
       

 08-28-2005
1.00
Drill Canopy Frame to Attach Angles
Details
       

 08-28-2005
3.50
Countersink, Debur, Edge Prep Frame
Details
       

 08-26-2005
1.50
Drill/Bolt Attach Angles to F705 Bulkhea
Details
       

 08-24-2005
2.00
Taper Attach Angles to Fuselage Contour
Details
       

 08-24-2005
0.50
Rivet F631C&D Attach Angles - Keeper
Details
     

 08-21-2005
0.50
Flare and Install Outboard Fittings
Details
       

 08-21-2005
2.00
Debur Strips, Cleco Frame, Drill Angles
Details
       

 08-21-2005
0.50
Countersink Attach Angles
Details
     

 08-20-2005
1.25
Final Canopy Frame Countersinking
Details
       

 08-20-2005
0.25
Cut External Portion of Fuel Line to Len
Details
       

 08-18-2005
0.75
More Canopy Frame Countersinking
Details
     

 08-17-2005
0.50
More Canopy Frame Countersinking
Details
       

 08-17-2005
0.75
Debur Inside Flanges of Channels
Details
       

 08-15-2005
0.50
More Canopy Frame Countersinking
Details
     

 08-14-2005
0.50
More Canopy Frame Countersinking
Details
     

 08-14-2005
0.75
Bend/Flare/Connect Selector Valve Ends
Details
       

 08-14-2005
0.75
Bend/Flare/Connect Selector Valve Ends
Details
       

 08-13-2005
0.50
Countersink Canopy Frame
Details
     

 08-13-2005
1.50
Adjust 3/8" Fuel Lines: Valve to Tanks
Details
       

 07-21-2005
1.50
Drill Forward Channels
Details
       

 07-19-2005
2.00
Drill Outer Strip; Trim Forward Channels
Details
       

 07-18-2005
0.50
Mark Outer Flange Rivet Pattern
Details
       

 07-17-2005
1.00
Drill F631E Plate to Aft Channels; Mark
Details
       

 07-17-2005
1.00
Bevel Edges of Outer Strip
Details
       

 07-17-2005
2.00
Bevel Edges of Inner Strip; Clamp/Drill
Details
       

 07-16-2005
1.50
Trim Aft Channels; Finish Bracket Fab
Details
       

 07-16-2005
1.00
Remove and Store Wings and Tail
Details
       

 07-16-2005
1.50
Fabricate Misc Angles / Plates
Details
       

 07-06-2005
1.00
Canopy Frame: Drill Aft Access Holes
Details
       

 07-05-2005
0.50
Remove Rudder; Drill Upper Front Spar Ho
Details
     

 07-05-2005
0.25
Photo's of Wings and Tail Installed
Details
       

 07-05-2005
0.25
Photo's of Wings and Tail Installed
Details
       

 07-02-2005
0.50
Install Elevators
Details
       

 06-26-2005
2.00
Elevator Trim: Prime, Assemble
Details
       

 06-25-2005
2.00
Install Bearings; Hang Rudder on VS
Details
       

 06-25-2005
0.50
Elevator Trim: Drill Servo to Brackets
Details
     

 06-25-2005
1.00
Drill Rudder Stops to Fuselage
Details
       

 06-25-2005
0.50
Drill Lower Rear Spar Bolt Holes
Details
       

 06-24-2005
2.00
Measure/Clamp VS to HS; Drill Rear Spar
Details
       

 06-24-2005
1.00
Measure/Clamp Front Spar Plate; Trim VS
Details
       

 06-24-2005
1.00
Bolt Rear Spar to Aft Deck; Drill Front
Details
       

 06-23-2005
1.50
Drill / Bolt Rear Spar to Fuselage
Details
       

 06-23-2005
1.50
Drill / Bolt Forward Spar to Fuselage
Details
       

 06-23-2005
0.50
Bolt Horizontal Stabilizer to Fuselage
Details
       

 06-19-2005
0.50
Position and Clamp HS to Aft Deck
Details
       

 06-19-2005
2.50
Drill Control Horns
Details
       

 06-18-2005
1.50
Trim HS skins for Elev Arms; Drill Horn
Details
       

 06-18-2005
0.50
Install / Torque Rod End Bearings
Details
     

 06-15-2005
1.00
Loosen and Redo Cotter Pins
Details
       

 06-15-2005
0.50
Intall Forward Elevator Pushrod
Details
     

 06-15-2005
1.50
Elevator Pushrods: Alodine/Prime/Rivet
Details
       

 06-14-2005
1.00
Sticks
Details
     

 06-14-2005
1.00
Elevator Pushrods: Measure/Cut/Drill
Details
       

 06-12-2005
2.00
Aileron Trim:Fabricate Control Mechanism
Details
       

 06-12-2005
1.00
Aileron Trim:Attach Servo, Mount to Ribs
Details
       

 06-12-2005
1.00
Aileron Trim: Cut/Drill Block & Plate
Details
       

 06-03-2005
1.50
Install Brake Pedals & Master Cylinders
Details
       

 06-02-2005
2.00
Finish Right Tank Vent; Trim Brake Pedal
Details
       

 05-30-2005
1.00
Run 1/4" Right Fuel Vent Tubing
Details
     

 05-29-2005
4.00
Run 1/4" Left Fuel Vent Tubing
Details
       

 05-24-2005
4.00
Run 3/8" Tank-to-Valve Tubing
Details
       

 05-23-2005
2.00
Install Control Stick Arm; Andair Valve
Details
       

 05-21-2005
2.00
Mark Wing Root Fairings; Control Sticks
Details
       

 05-16-2005
2.00
Cleco / Match-Drill Wing Root Fairings
Details
       

 05-15-2005
2.00
Reinstall Flap Motor; Safety Wire Arm
Details
       

 05-15-2005
0.50
Flaps - Test Motor / Range
Details
       

 05-15-2005
2.00
Enlarge Left Flap Pushrod Hole
Details
       

 05-14-2005
1.00
Trim Right Flap Top Skin; Reinstall Flap
Details
       

 05-14-2005
1.00
Install Flaps; Mark Top Skins; Remove
Details
       

 05-14-2005
2.00
Enlarge Right Flap Pushrod Hole
Details
       

 05-10-2005
1.00
Bolt Right Aileron to Right Wing
Details
       

 05-10-2005
1.00
Bolt Left Aileron to Left Wing
Details
       

 05-03-2005
2.00
Drill / Cut Flap Pushrod Holes
Details
       

 05-02-2005
1.50
Drill / Bolt Fuel Tank Brackets
Details
       

 05-01-2005
2.00
Set Sweep - Plumb Bobs
Details
       

 05-01-2005
1.00
Set Incidence: Right Wing
Details
       

 05-01-2005
1.00
Set Incidence: Left Wing
Details
       

 05-01-2005
1.00
Measure/Drill Bottom Skins; Bolt Tank Br
Details
       

 05-01-2005
2.00
Level Fuselage
Details
       

 05-01-2005
1.00
Drill / Ream Rear Spars
Details
       

 04-30-2005
1.00
Right: Mate / Bolt to Fuselage
Details
       

 04-30-2005
1.00
Left: Trim Rear Spar, Mark Bottom Holes
Details
       

 04-30-2005
1.00
Left: Rear Spar Notched; Right: Rear Cut
Details
       

 04-30-2005
1.00
Left: Mate / Bolt to Fuselage
Details
       

 04-09-2005
0.50
Grind Drift Pins
Details
     

 04-09-2005
1.00
Bolt Aileron Bellcranks to Spars
Details
       

 04-03-2005
3.00
Right Gear Mount: Install
Details
       

 04-03-2005
0.50
Both Landing Gear Mounts Installed
Details
       

 04-02-2005
2.50
Left Gear Mount: Install
Details
       

 04-02-2005
2.50
Left Gear Mount: Install
Details
       

 03-29-2005
1.50
Left Gear Mount: Temp Install
Details
     

 03-28-2005
1.00
Debur/Edge Prep Side Covers
Details
       

 03-27-2005
1.50
Drill Side Covers; Install Backrest Nutp
Details
       

 03-26-2005
0.50
Rivet Plates and Angles to Channels
Details
     

 03-26-2005
0.50
Rivet F767 Top Plate to F766A Channel
Details
     

 03-26-2005
1.50
Install Flap Motor Channel; Safety Wire
Details
       

 03-26-2005
1.00
Drill / Bolt Flap Motor Inside Channel
Details
       

 03-26-2005
0.50
Clamp/Drill Flap Motor Channels to Fuse
Details
       

 03-21-2005
0.50
Finish Fabricating Flap Motor Supports
Details
       

 03-21-2005
1.00
Fabricate Flap Motor Support Pieces
Details
       

 03-20-2005
1.00
Notch Tunnel Cover; Drill Safe Tie Hole
Details
       

 03-20-2005
1.00
Install Floor Nutplates; Ream Clevis's
Details
       

 03-20-2005
3.00
Edge Prep - Misc Forward Covers
Details
     

 03-20-2005
0.50
Drill / Split Center Support Block
Details
       

 03-20-2005
0.50
Bolt Actuator Weldment to Fuselage
Details
       

 03-13-2005
3.00
Bend Heat Baffle Louvre's; Edge Prep
Details
       

 03-12-2005
0.50
Install Nutplates-Recess and Heat Baffle
Details
       

 03-12-2005
1.50
Drill Forward Covers -Fuel, Heat, Recess
Details
       

 03-11-2005
0.50
Main Gear Legs - Match Ream to Mounts
Details
       

 03-11-2005
0.50
Fuel Selector Plate; F982E Access Plate
Details
       

 03-11-2005
2.00
F782 Baffle - Drill/Rivet to Cover
Details
       

 03-10-2005
2.00
Rivet Seat Backs
Details
       

 03-10-2005
0.50
Install Seat Cushions; Sit in Plane
Details
       

 03-09-2005
4.50
Drill Seat Backs to #30; Debur / Alodine
Details
       

 03-08-2005
2.00
Trim Ends of Seat Back Support Angles
Details
       

 03-08-2005
4.00
Measure and Drill Seat Back Components
Details
       

 03-07-2005
3.50
Seat Back Braces
Details
       

 03-07-2005
2.00
Edge Prep Seat Pans
Details
       

 03-07-2005
1.50
Cut Seat Back Support Angles
Details
       

 03-06-2005
1.00
Rivet F741 Tunnel Cover
Details
       

 03-06-2005
1.00
Install Nutplate; Begin Seat Backs
Details
       

 03-03-2005
1.50
Fabricate F741 Tunnel Cover
Details
       

 02-27-2005
2.00
Rivet Seat Floors; Cleco Forward Floors
Details
       

 02-26-2005
1.00
Debur Seat Ribs, Cleco Floors, Rivet
Details
     

 02-25-2005
2.75
Rivet Seat Hinges to Floors; Edge Prep
Details
       

 02-25-2005
0.25
Dimple Nutplates for Seat Floors
Details
     

 02-24-2005
2.00
Seat Floors: Cut/Drill Hinges and Pins
Details
       

 02-24-2005
1.00
Debur Seat Pans; Bolt Rear Spar Spacers
Details
       

 02-23-2005
0.50
Debur / Edge Prep Aft Tunnel Cover
Details
     

 02-23-2005
3.50
Canopy Rails: Rivet / File to Contour
Details
       

 02-23-2005
1.00
Canopy Rails: Edge Prep
Details
       

 02-22-2005
1.50
F705 - Rivet Tip Up Angle & Gusset
Details
       

 02-22-2005
2.50
Edge Prep Baggage Panels; Rivet Blocks
Details
       

 02-22-2005
1.50
Debur/Dimple Canopy Side Rails/Longerons
Details
     

 02-21-2005
3.00
Install Nutplates on F706 for Rear Wall
Details
       

 02-21-2005
1.00
Drill Rear Baggage Wall to F706
Details
       

 02-21-2005
1.00
Cut, Drill Shoulder Harness Wear Blocks
Details
       

 02-06-2005
0.50
Bolt Shoulder Harness Cables to Brackets
Details
     

 02-05-2005
0.50
Bolt Shoulder Harness Anchors
Details
     

 02-04-2005
2.50
Rivet Top Skins with Matt
Details
       

 02-04-2005
0.25
More Fun Pictures of Top Skins Riveted
Details
       

 02-04-2005
0.25
Fun Pictures of Top Skins Riveted
Details
       

 01-30-2005
1.00
Rear Baggage Wall - Drill for Nutplates
Details
     

 01-27-2005
1.00
Rivet Left Baggage Floor;Radius Rear Wal
Details

 01-26-2005
3.00
Rivet Baggage Floors
Details
       

 01-26-2005
4.00
Debur, Dimple, Edge Prep, Alodine Floors
Details
       

 01-25-2005
0.50
Drill Baggage Floors to F706 & Side Covr
Details
       

 01-22-2005
0.25
First Time Inside of Plane !
Details

 01-22-2005
2.00
Debur/Rivet F750 Baggage Side Covers
Details
       

 01-16-2005
2.00
Install Static Tubing / Wiring Conduit
Details
       

 01-16-2005
1.00
Cleco Aft Top Skins; Prime Fuel Tank Bkt
Details
       

 01-15-2005
1.00
Prime Top Skins
Details
       

 01-15-2005
0.50
Intall Rudder Cable Adel Clamps
Details
       

 01-15-2005
0.50
Install Static Ports - Pop Rivets
Details
       

 01-15-2005
1.00
Install Rudder Cables and Fairings
Details
       

 01-09-2005
2.00
Prime J-Channels; Edge Prep Top Skins
Details
       

 01-09-2005
2.00
Debur/Dimple J-Channels; Drill Skins
Details
       

 01-09-2005
2.00
Debur/Dimple Aft Top Skins
Details
       

 01-07-2005
0.75
Rivet Bellcrank Support and Top Rib
Details
       

 01-07-2005
0.75
Remove Top Skins; Rivet Armrests
Details
       

 01-07-2005
1.50
Debur / Dimple Bulkheads
Details
       

 01-06-2005
1.00
Match Drill Top Skins
Details
     

 01-06-2005
0.50
Drill F707B Angle to F707 Bulkhead
Details
       

 01-05-2005
1.50
Rivet F709 Bulkhead; Insert J-Channels
Details
       

 01-05-2005
0.25
Pictures of Top Skins Clecoed to Fuselag
Details
       

 01-05-2005
0.25
Pictures of Me and My Fuselage
Details
       

 01-05-2005
1.50
Cleco Aft Top Skin/Drill to J-Channels
Details
       

 01-03-2005
1.00
Rivet Gussets:Firewall,Bulkheads,Longero
Details
       

 01-03-2005
1.00
Finish Riveting Aft Deck and Spacers
Details
       

 01-02-2005
1.00
Begin Riveting Aft Deck/Spacers to Longe
Details
       

 01-01-2005
2.00
Wash, Alodine, Prime Gussets, Aft Deck
Details
       

 12-31-2004
1.00
Debur Longerons, Bulkheads, Firewall
Details
       

 12-31-2004
1.50
Debur Aft Deck and Spacers
Details
     

 12-29-2004
1.00
Debur Gussetts
Details
     

 12-25-2004
1.00
More Leveling; Drill Aft Deck
Details
       

 12-25-2004
2.00
Level the Fuselage
Details
       

 12-25-2004
1.00
Drill Seatbelt Anchors, Rails, & Gussets
Details
       

 12-24-2004
1.00
Rivet Side Skins to Longerons
Details
       

 12-24-2004
1.00
Rivet Aft Side Skins to Aft Bulkheads
Details
       

 12-23-2004
1.00
Rolled the Canoe Over!
Details
       

 12-23-2004
4.00
Rivet Left Side
Details
       

 12-23-2004
3.00
Rivet Left Side
Details
       

 12-22-2004
3.00
Rivet Right Side
Details
       

 12-22-2004
3.00
Rivet Right Side
Details
       

 12-21-2004
8.00
Rivet Bottom and Part of Right Side
Details
       

 12-21-2004
0.25
Rivet Bottom and Part of Right Side
Details
     

 12-19-2004
2.00
Fabricate Flap Pushrods
Details
     

 12-08-2004
1.00
Rivet Right Flap Hinge to Right Wing
Details
       

 12-08-2004
1.50
Rig Right Flap; Drill Hinge to Wing
Details
       

 12-08-2004
1.50
Rig Right Aileron
Details
       

 12-07-2004
1.00
Rivet Left Flap Hinge to Left Wing
Details
       

 12-07-2004
1.00
Mount Left Aileron and Flap
Details
       

 12-07-2004
1.00
Drill Flap Hinge to Wing; Remove/Debur
Details
       

 12-07-2004
1.00
Bolt Steel Brackets to Right Aileron
Details
       

 12-07-2004
1.00
Bolt Brackets to Left Aileron; Mount
Details
       

 12-07-2004
1.00
Bolt Aileron Bellcrank's to Wings
Details
       

 12-01-2004
1.75
Fabricate F695, F757 Gussets
Details
       

 11-29-2004
1.00
Cleco Floor Stiffeners;Rivet to Brackets
Details
       

 11-28-2004
1.00
Prime Forward Bottom Skin
Details
       

 11-28-2004
0.25
Cleco Forward Bottom Skin to Fuselage
Details
     

 11-28-2004
1.00
Alodine Bottom Skin; Drill Out Rivets
Details
       

 11-27-2004
1.00
Swap Nutplates, Rivet Stiffeners to Fire
Details
       

 11-27-2004
1.00
Rivet F796C Bulkheads to Longerons
Details
       

 11-27-2004
1.00
Cleco Forward Fuselage Structure
Details
       

 11-26-2004
1.00
Rivet Clips to Stiffeners; Rivet Gussets
Details
       

 11-26-2004
1.50
Aux Fuel Pump Bracket; Rivet
Details
       

 11-25-2004
2.00
Prep/Prime Steps and Aux Fuel Bracket
Details
     

 11-21-2004
3.00
Firewall: Debur/Dimple/Edges, Brackets
Details
       

 11-20-2004
1.00
Right Side Skin: Edges, Rivet Side Plate
Details
       

 11-20-2004
0.50
Ream 1/4" Holes in Aft F704 for Spacers
Details
       

 11-20-2004
0.50
Cleco Right Side Skin to Fuselage
Details
       

 11-20-2004
0.50
Cleco Forward F704 Bulkhead to Fuselage
Details
       

 11-20-2004
1.00
Bolt Control Column Brackets to Aft F704
Details
       

 11-20-2004
0.50
Baggage Ribs: Rivet Nutplates; Cleco
Details
       

 11-19-2004
0.25
Rivet Gear Attach Web to F902 Bulkhead
Details
     

 11-19-2004
3.50
Debur/Dimple Right Side Skin
Details
       

 11-19-2004
0.50
Cleco Left Side Skin to Fuselage
Details
       

 11-19-2004
0.75
Alodine Left Side Skin; Rivet Side Plate
Details
       

 11-18-2004
1.50
Rejoin Center Section to Aft Section
Details
       

 11-18-2004
1.00
F704:Countersink for Double Flush Rivets
Details
       

 11-18-2004
2.00
Countersink/Debur Side Plates; Prime
Details
       

 11-18-2004
1.00
Countersink F705; Tap Seat Ribs; Spacers
Details
       

 11-17-2004
0.50
Longeron's: Rivet Keeper Rivets
Details
     

 11-17-2004
1.50
Center Section: Debur / Dimple
Details
       

 11-17-2004
2.00
Aft Fuselage: Debur/Dimple/Flip
Details
       

 11-16-2004
6.00
Longerons: Countersink, Alodine, Prime
Details
       

 11-16-2004
2.00
F706 Bulkhead: Debur/Dimple/Rivet
Details
       

 11-15-2004
1.00
Remove Center Section
Details
       

 11-15-2004
5.00
Left Side Skin: Debur, Dimple, Edges
Details
       

 11-15-2004
1.00
Edge Prep Armrests; Remove Left Skin
Details
       

 11-14-2004
1.50
More Fuselage Prep Work
Details
     

 11-13-2004
1.75
More Fuselage Prep Work
Details
       

 11-10-2004
3.00
Wash, Alodine, Prime Forward Components
Details
       

 11-10-2004
3.00
Countersink Gussets, Stiffeners, Plates
Details
       

 11-09-2004
5.00
Edge Prep, Wash, Alodine, Prime
Details
       

 11-09-2004
3.00
Debur/Dimple/Edge Prep Bottom Skin
Details
       

 11-08-2004
1.50
Right Step: Drill Blocks to Tube / Rib
Details
       

 11-08-2004
1.50
Left Step: Drill Blocks to Tube / Rib
Details
       

 11-08-2004
1.50
Drill Baggage Side Covers
Details
       

 11-07-2004
1.00
Right Step: Taper / Bend Plate
Details
       

 11-07-2004
0.50
Match Drill F722/724 Baggage Ribs
Details
       

 10-26-2004
1.75
Right Step: Drill Plate and Side Skin
Details
       

 10-24-2004
1.75
Left Step: Drill Side Skin; Install Ribs
Details
       

 10-23-2004
1.00
Left Step: Mark and Drill the Plate
Details
       

 10-23-2004
0.50
Left Step: Enlarge Hole in Side Skin
Details
       

 10-22-2004
1.50
Rudder/Brake Pedals:Drill Center Support
Details
       

 10-22-2004
1.50
Rudder/Brake Pedals: Drill to Stiffeners
Details
     

 10-21-2004
1.00
Rudder/Brake Pedals: Cut/Drill Blocks
Details
       

 10-21-2004
2.00
Brake Pedals: Install on Rudder Pedals
Details
       

 10-20-2004
0.75
Brake Pedals: Alodine Pen / Rivet
Details
       

 10-19-2004
0.50
Brake Pedals: Alumaprep Parts
Details
     

 10-18-2004
1.50
Brake Pedals: Edge Prep
Details
     

 10-17-2004
1.75
Brake Pedals: Drill Angles/Side Plates
Details
       

 10-17-2004
1.75
Brake Pedals: Countersink / Debur
Details
       

 10-03-2004
0.25
Countersink Bottom Firewall Angle
Details
     

 10-02-2004
2.00
Countersink Floor Stiffeners
Details
     

 10-01-2004
0.50
Trim F704 Flanges for Main Gear
Details
       

 10-01-2004
0.50
Remove Floor Stiffeners & Bottom Skin
Details
       

 10-01-2004
0.50
Match Drill Forward Bottom Skin
Details
       

 10-01-2004
0.50
Match Drill Floor Stiffeners to Brackets
Details
       

 09-30-2004
1.75
Forward Section: Drill Floor Stiffeners
Details
       

 09-29-2004
2.00
Drill Right Fuselage Forward Components
Details
       

 09-29-2004
2.00
Drill Right Fuselage Forward Components
Details
       

 09-29-2004
1.00
Drill Right Fuselage Forward Components
Details
     

 09-28-2004
2.00
Drill Left Fuselage Forward Components
Details
       

 09-28-2004
2.00
Drill Left Fuselage Forward Components
Details
       

 09-28-2004
2.00
Drill Left Fuselage Forward Components
Details
       

 09-27-2004
0.50
Fabricate Right Lower Longeron
Details
     

 09-27-2004
0.50
Complete Wheel Assemblies: Inflate Tires
Details
     

 09-24-2004
1.00
Fabricate Attach Strips and Clips
Details
     

 09-23-2004
2.50
Left Forward Fuselage: Tailor Fit Parts
Details
       

 09-21-2004
1.50
Fabricate F684 Gussets
Details
       

 09-20-2004
1.00
Cut Bottom Skin for Right Main Gear
Details
       

 09-20-2004
1.00
Cut Bottom Skin for Left Main Gear
Details
       

 09-19-2004
2.00
Repack Main Wheel Bearings
Details
       

 09-19-2004
1.00
Drill Longerons to Upper Steel Brackets
Details
       

 09-19-2004
0.50
Drill Firewall to Side Skins
Details
       

 09-19-2004
1.25
Drill Baggage Ribs; Left Side Skin
Details
       

 09-19-2004
1.00
Cleco and Drill Firewall to Side Skins
Details
       

 09-18-2004
2.00
Drill Left Longeron
Details
       

 09-13-2004
0.50
Match Drill Right Side Skin
Details
     

 09-13-2004
3.00
Drill Right Longeron
Details
       

 09-13-2004
0.50
Cut Right Longeron
Details
     

 09-08-2004
1.00
Flute/Cleco Arm Rests; Cut Left Longeron
Details
       

 09-07-2004
1.00
Mount Tire to Nose Wheel
Details
     

 09-01-2004
0.50
Inventory Finish Kit
Details
       

 09-01-2004
2.50
Inventory Finish Kit
Details
       

 08-29-2004
1.00
Steps: Cut Corner Ribs; Drill Blocks
Details
       

 08-25-2004
0.50
Cleco Left Side Skin Fuselage
Details
       

 08-25-2004
0.50
Bend Right Side Skin
Details
     

 08-25-2004
1.00
Bend Left Side Skin; Cleco to Fuselage
Details
       

 08-24-2004
1.00
Drill Hole for Rigt Step; Drill Out Rive
Details
       

 08-23-2004
1.00
Drill Hole for Left Step; Cleco Side Ski
Details
       

 08-21-2004
1.00
Rivet Tail Cone
Details
       

 08-21-2004
1.00
Notch and Install Right Longeron
Details
       

 08-21-2004
0.25
Join Center Section to Aft Section
Details
       

 08-21-2004
0.25
Join Center Section to Aft Section
Details
       

 08-20-2004
1.00
Notch and Install Left Longeron
Details
       

 08-20-2004
2.50
Aft Section: Finish Riveting Skins
Details
       

 08-08-2004
2.50
Center Section: Outboard Seat Ribs
Details
       

 08-08-2004
0.50
Center Section: Debur/Dimple for Ribs
Details
     

 08-07-2004
2.00
Center Section: Left Outboard Seat Rib
Details
     

 07-18-2004
2.00
Center Section: Right Outboard Seat Rib
Details
       

 07-18-2004
2.00
Aft Section: Rivet Bottom Skin
Details
       

 07-18-2004
0.25
Aft Section: Bottom Skin Pictures
Details
       

 07-09-2004
1.50
Center Section: Drill Floor Panels
Details
       

 07-09-2004
1.50
Aft Section: Rivet Bottom Skin
Details
       

 07-07-2004
0.50
Center Section: Cleco Floor Panels
Details
       

 06-28-2004
1.50
Center Section: Rivet Bottom Section
Details
       

 06-26-2004
1.00
Center Section: Rivet Bottom Section
Details
     

 06-21-2004
1.50
Center Section: Rivet Bottom Section
Details
       

 06-20-2004
2.00
Center Section: Rivet Bottom Section
Details
       

 06-20-2004
0.50
Center Section: Cleco Bottom Skin
Details
       

 06-19-2004
2.50
Center Section: Debur/Dimple Bottom Skin
Details
       

 06-09-2004
2.50
Center Section: Bolt Ribs, Debur Skin
Details
       

 06-08-2004
1.50
Center Section: Rivet Seat Ribs to Bulkh
Details
       

 06-08-2004
2.50
Center Section: Rivet Ribs to F705 Bulkh
Details
       

 06-08-2004
0.50
Center Section: Debur/Dimple Forward Bul
Details
     

 06-08-2004
0.50
Center Section: Debur/Dimple F705 Bulkhe
Details
       

 06-07-2004
0.25
Moved the Wings back to Storage Spot
Details
     

 06-06-2004
4.50
Left Wing: Rivet Left Outboard Bottom Sk
Details
       

 06-04-2004
0.75
Center Section: Debur Dimple Aft Bulkhea
Details
     

 06-04-2004
0.25
Baggage Ribs: Rivet Nutplates
Details
     

 06-03-2004
3.00
Seat/Baggage Ribs: Prep and Prime
Details
       

 06-01-2004
0.50
Baggage Ribs: Debur and Dimple
Details
     

 05-31-2004
1.00
Seat/Baggage Ribs: Nutplates
Details
       

 05-12-2004
2.00
Center Section: Prime 4 More Seat Ribs
Details
     

 05-11-2004
2.00
Center Section: Prime 4 Seat Ribs
Details
       

 05-11-2004
1.50
Center Section: Debur/Dimple Seat Ribs
Details
       

 05-10-2004
1.00
Center Section: Modify Ribs for Steps
Details
       

 05-10-2004
3.00
Center Section: Match Drill
Details
       

 05-10-2004
1.00
Center Section: Disassemble / Prep
Details
       

 05-02-2004
0.75
Center Section: Right Corner Rib
Details
       

 05-02-2004
0.75
Center Section: Left Corner Rib
Details
       

 04-27-2004
1.00
Center Section:Modify Rib Flanges-Wiring
Details
       

 04-27-2004
0.50
Center Section: Unibit F704 - Battery
Details
       

 04-27-2004
1.00
Center Section: Cleco Ribs/Bottom Skin
Details
       

 04-26-2004
1.00
Center Section: Prep Seat/Baggage Ribs
Details
       

 04-26-2004
1.00
Center Section: Prep Seat/Baggage Ribs
Details
       

 04-26-2004
0.50
Center Section: Cleco Seat/Baggage Ribs
Details
       

 04-24-2004
3.75
Center Section: Prep Seat Ribs
Details
       

 04-23-2004
0.50
Center Section: Modify 4 Seat Ribs
Details
       

 04-23-2004
0.50
Center Section: Modify 4 Seat Ribs
Details
       

 04-23-2004
0.50
Center Section: Debur/Polish Spacers
Details
     

 04-22-2004
1.00
Center Section: Fabricate Spacers
Details
     

 04-20-2004
3.00
Fabricate Rudder Stops, Misc Angles
Details
     

 04-01-2004
3.50
Rivet Tailcone; Cleco Aft Fuselage
Details
       

 03-31-2004
2.00
Aft Side Skins:Prime/Dimple Rudder Cable
Details
       

 03-31-2004
1.50
Aft Bottom Skin:Prime, Touchup Bulkheads
Details
       

 03-30-2004
2.00
Bulkheads:Enlarge Longeron Slots/Dimple
Details
       

 03-30-2004
1.50
Bulkheads:Enlarge Longeron Slots/Dimple
Details
       

 03-29-2004
7.00
J-Channels: Debur/Dimple/Prime
Details
       

 03-28-2004
3.25
J-Channels - Debur Holes / Edges
Details
     

 03-07-2004
3.25
Right Aft Side Skin - Dimple/Debur Edges
Details
       

 03-07-2004
2.50
Bottom Aft Skin - Dimple/Debur Edges
Details
       

 03-06-2004
0.50
Remove Right Aft Side Skin / Plastic
Details
       

 03-06-2004
2.50
Left Aft Side Skin - Dimple/Debur Edges
Details
       

 02-29-2004
3.75
Match Drill Aft Fuselage Debur Left Skin
Details
       

 02-28-2004
0.25
Fabricate / Drill F728B Angle
Details
     

 02-28-2004
1.75
Cleco Tailcone to Aft Fuselage
Details
       

 02-09-2004
2.00
Drill and Cleco J-Channels
Details
       

 02-01-2004
4.00
Longerons: Downward Bends and Twist
Details
       

 02-01-2004
4.00
Cut J-Channels; Cleco Aft Fuselage
Details
       

 01-31-2004
5.00
Longerons: Shallow Bends
Details
       

 01-31-2004
1.50
Longerons: Drill F721B Aft Canopy Decks
Details
       

 01-31-2004
1.50
Bulkheads: Prime and Rivet
Details
       

 01-30-2004
2.00
Longerons: Cut to Length; Prime Bulkhead
Details
       

 01-28-2004
1.50
Longerons: Cut End Notches
Details
       

 01-27-2004
2.25
Bulkheads: Prep F709,11,12; Rivet 707,10
Details
       

 01-26-2004
2.00
Bulkheads: Prime F707/710, Rivet F706/08
Details
       

 01-25-2004
1.50
F707/F710 Bulkheads: Debur/Polish Edges
Details
       

 01-25-2004
2.00
F706/F708 Bulkheads; Wash and Prime
Details
       

 01-25-2004
0.50
F705 Bulkhead; Drill Flap Blocks
Details
       

 01-25-2004
3.00
F705 Bulkhead: Rivet Bars; Bolt Brackets
Details
       

 01-24-2004
2.00
Prime Bulkhead Reinforcement Bars
Details
       

 01-22-2004
1.00
F712 Bulkhead: Fabricate Tie Down
Details
       

 01-21-2004
1.75
F705 Bulkhead: Fabricate F605C Bars
Details
       

 01-20-2004
2.00
F711 Bulkhead: Drill/Taper Bars, Angle
Details
       

 01-19-2004
1.50
F711 Bulkhead: Fabricate Bars
Details
       

 01-19-2004
1.50
F710 Bulkhead: Fabricate Angle; Drill
Details
       

 01-19-2004
0.50
F706 Bulkhead: Rivet Bottom / Bellcrank
Details
     

 01-18-2004
3.00
F707/F708 Bulkheads: Cleco/Drill
Details
       

 01-18-2004
2.25
F706 Bulkhead: Cleco/Drill Assembly
Details
       

 01-17-2004
3.00
F706 Bulkhead: Flute / Polish Edges
Details
       

 01-17-2004
0.50
F706 Bulkhead: Drill Bellcrank
Details
       

 01-17-2004
2.50
F706 Bulkhead: Bellcrank Structure
Details
       

 01-12-2004
1.50
F705 Bulkhead: Rivet Top & Sides
Details
       

 01-12-2004
0.50
F705 Bulkhead: More Riveting
Details
     

 01-11-2004
3.00
F705 Bulkhead: Wash and Prime
Details
       

 01-10-2004
2.00
F705 Bulkhead: Debur
Details
     

 01-09-2004
1.00
F705 Bulkhead: Drill Top Angles
Details
       

 01-09-2004
0.50
F705 Bulkhead: Countersink's
Details
       

 01-09-2004
2.00
F705 Bulkhead: Cleco and Match-Drill
Details
       

 01-08-2004
1.00
F705 Bulkhead: Fabricate Parts
Details
       

 01-08-2004
0.50
F705 Bulkhead: Drill Top Parts
Details
       

 01-08-2004
2.00
F705 Bulkhead: Drill Seat Belt Brackets
Details
       

 01-08-2004
1.00
F705 Bulkhead: Bend/Drill Top Parts
Details
       

 01-07-2004
3.00
F705 Bulkhead: Clamp/Drill Bottom Sectio
Details
       

 01-07-2004
5.00
Center Section: Rivet Bulkheads
Details
       

 01-06-2004
1.00
Center Section: Nutplates
Details
       

 01-06-2004
2.00
Center Section: Debur/Rivet Stiffeners
Details
       

 01-06-2004
1.00
Center Section: Countersink Bars and Web
Details
       

 01-06-2004
2.00
Center Section: Cleco/Drill Bulkheads
Details
       

 01-05-2004
1.50
Wash/Prime Center Section Parts
Details
       

 01-05-2004
0.50
Left Wing - Rivet Bottom Skins
Details
       

 01-03-2004
3.00
Left Wing - Rivet Bottom Skins
Details
       

 12-28-2003
0.50
Center Section: Drill Stiffeners
Details
       

 12-28-2003
1.00
Center Section: Drill Cover Brackets
Details
       

 12-28-2003
2.50
Center Section: Control Column Brackets
Details
       

 12-27-2003
2.00
Center Section - Drill for Snap Bushings
Details
       

 12-27-2003
2.00
Back-Rivet Firewall
Details
       

 12-26-2003
0.50
Cleco Firewall Together
Details
       

 12-26-2003
2.00
Back-Rivet Firewall
Details
       

 12-25-2003
2.00
Wash and Prime Firewall Components
Details
     

 12-25-2003
0.50
Left Wing - Rivet Bottom Skins
Details
     

 12-21-2003
1.25
Right Wing - Rivet Bottom Skins
Details
       

 12-21-2003
0.25
Right Wing - Bottom Skins are Done!!
Details
       

 12-20-2003
3.50
Right Wing - Rivet Bottom Skins
Details
       

 12-20-2003
1.75
Right Wing - Rivet Bottom Skins
Details
       

 12-13-2003
1.50
Firewall: Finish Countersinking
Details
       

 12-02-2003
1.00
Countersink Firewall Components
Details
     

 11-30-2003
1.50
Firewall: Debur/Countersink Angles
Details
       

 11-30-2003
2.00
Debur / Dimple Firewall; Dimple Recess
Details
       

 11-29-2003
3.00
Fabricate / Cleco / Match-Drill Firewall
Details
       

 11-29-2003
2.00
Drill Recess to Firewall; Begin Deburrin
Details
       

 11-28-2003
1.50
Fabricate F-601J Firewall/Floor Angles
Details
     

 11-10-2003
2.00
Rivet Left Inboard Bottom Skin; 3 Ribs
Details
     

 11-09-2003
1.50
Gretz Mount: Drill Angle; Dimple; Prime
Details
       

 11-09-2003
1.00
Gretz Mount: Begin Riveting
Details
       

 11-09-2003
1.50
Drill Gretz Pitot Mount Bracket to Wing
Details
       

 11-08-2003
1.50
Countersink Left Flap Brace; Drill Pitot
Details
       

 11-08-2003
0.50
Begin Working on the Gretz Pitot Mount
Details
     

 11-07-2003
1.75
Rivet Right Bottom Skin to Main Spar
Details
       

 11-07-2003
0.25
Ream Brass Aileron Bushing's - 1/4"
Details
     

 11-06-2003
4.50
Countersink Right Flap Brace;Dimple;Rive
Details
       

 11-05-2003
1.00
Rivet Rod Ends to Long Aileron Pushrods
Details
       

 11-04-2003
1.00
Match Drill Bottom Skins to Flap Braces
Details
     

 11-04-2003
3.00
Aileron Pushrods
Details
       

 11-03-2003
2.00
Rivet Flap Braces to Rear Spars
Details
       

 11-03-2003
2.00
Rivet Aileron Gap Fairings to Rear Spars
Details
       

 11-03-2003
3.00
Rivet Aileron Brackets to Rear Spars
Details
       

 11-03-2003
1.00
Cut the Short Aileron Pushrods to Length
Details
     

 10-26-2003
0.25
Rudder Finished and Compared to Old
Details
       

 10-26-2003
1.50
Roll and Rivet Leading Edge
Details
       

 10-25-2003
1.00
Rivet Trailing Edge
Details
       

 10-16-2003
1.00
Pro-Seal Trailing Edge
Details
     

 10-13-2003
2.50
Finish Riveting Skins to Ribs and Spar
Details
       

 10-12-2003
1.50
Rivet Left Skin to Spar
Details
       

 10-12-2003
1.50
Begin Riveting Rudder Together
Details
       

 10-11-2003
1.00
Drill/Debur/Prime R607PP; Drill Wedge
Details
       

 10-11-2003
1.00
Countersink the Trailing Edge Wedge
Details
       

 10-10-2003
2.75
Polish Skin Edges; Dimple Trailing Edge
Details
       

 10-09-2003
4.75
Polish Edges; Prime all Components
Details
       

 10-08-2003
2.75
Rivet Stiffeners to Skins; Cleco Rudder
Details
       

 10-08-2003
3.00
Disassemble and Debur Rubber Parts
Details
       

 10-07-2003
4.50
Prime Stiffeners; Debur/Dimple Skins
Details
       

 10-06-2003
3.00
Match-drill Stiffeners; Debur and Dimple
Details
       

 10-06-2003
2.50
Fabricate Stiffeners
Details
       

 09-27-2003
1.50
Right Aileron - Finish Riveting
Details
       

 09-27-2003
1.50
Left Aileron - Finish Riveting
Details
       

 09-27-2003
0.25
Finish Pop-Riveting Ribs to Spar - Right
Details
     

 09-27-2003
0.25
Finish Blind Riveting Ribs to Spar
Details
     

 09-27-2003
1.50
Ailerons Complete - Shave Blind Rivets
Details
       

 09-26-2003
1.75
Left Aileron; Rivet Top Skins to Spar
Details
       

 09-26-2003
1.00
Cleco Right Aileron; Begin Riveting Top
Details
       

 09-25-2003
1.00
Prime Pipes/Skins; Rivet Forward Skeleto
Details
       

 09-25-2003
1.00
Dimple Leading Edges
Details
     

 09-24-2003
1.25
Polish Left Edges; Dimple Front Skins
Details
     

 09-23-2003
2.50
Prime Remaining Parts; Debur Right Front
Details
       

 09-23-2003
4.75
Debur/Dimple Skins; Begin Priming
Details
       

 09-22-2003
3.25
Finish Deburring Aileron Components
Details
       

 09-13-2003
1.75
Finish Match-Drilling; Cut Access Holes
Details
       

 09-13-2003
1.00
Countersink Plates / Pipes; Debur
Details
       

 09-12-2003
2.00
Right: Match-Drill Skins; Counterbalance
Details
       

 09-12-2003
2.00
Match-Drill Attach Brackets; Left Skins
Details
       

 09-12-2003
1.00
Left: Drill Counterweight to Ribs/Skins
Details
       

 09-12-2003
2.00
Drill Ribs to Spars and Reinf Plates
Details
       

 09-07-2003
2.00
Debur Bottom Skin Edges; Bend Trailing E
Details
       

 09-06-2003
2.00
Back Rivet Stiffeners to Bottom Skins
Details
       

 09-03-2003
1.50
Dimple Aft Skins
Details
       

 09-02-2003
2.50
Prime Stiffeners; Debur Right Skin
Details
       

 09-01-2003
2.00
Scotchbrite Stiffeners; Drill to Skins
Details
       

 09-01-2003
1.50
Remove Plastic from Skins; Debur Left
Details
       

 09-01-2003
2.00
Label, Debur, and Dimple Stiffeners
Details
       

 08-31-2003
1.00
Sand Edges of Stiffeners
Details
     

 08-30-2003
0.25
Right Flap - Rivet Spar to Ribs
Details
     

 08-30-2003
1.50
Right Flap - Rivet Spar and Hinge
Details
       

 08-30-2003
3.00
Right Flap - Rivet Ribs and Skin Overlap
Details
       

 08-10-2003
1.00
Rivet Top Left Skin to Ribs
Details
     

 08-10-2003
2.50
Rivet Left Spar to Hinge, Ribs, & Skins
Details
       

 08-09-2003
2.50
Cleco Flaps Together; Rivet Bottom Left
Details
     

 07-20-2003
0.75
Rivet Rib Trailing Edges to Rear Spars
Details
     

 07-20-2003
1.50
Debur and Dimple Top Left Skin
Details
       

 07-19-2003
1.00
Debur and Dimple Top Right Skin
Details
       

 07-19-2003
1.00
Cleco Ribs and Spars to Bottom Skins
Details
       

 07-19-2003
2.00
Bottom Skins: Polish Edges and Dimple
Details
       

 07-18-2003
1.00
Rivet Attach Angles to Spars & End Ribs
Details
     

 07-14-2003
1.00
Wash and Prime Spars
Details
     

 07-14-2003
2.00
Wash and Prime Ribs and Attach Angles
Details
       

 07-14-2003
2.00
Debur Center Ribs & Bottom Skins; Dimple
Details
       

 07-13-2003
2.00
Debur, Dimple, Flute Flap Ribs and Spars
Details
       

 07-10-2003
1.00
Drill Attach Angles to Right Flap
Details
       

 07-10-2003
1.00
Debur Hinges, Angles, Spars, End Ribs
Details
       

 07-10-2003
1.50
Countersink Flap Spars for Piano Hinges
Details
       

 07-09-2003
2.00
Fabricate Flap Attach Angles
Details
       

 07-09-2003
1.00
Drill Attach Angles to Left Flap
Details
       

 07-08-2003
0.50
Fabricate Shims
Details
     

 07-08-2003
1.50
Cleco and Match Drill Right Flap
Details
       

 07-08-2003
1.50
Cleco and Match Drill Left Flap
Details
       

 07-07-2003
0.75
Debur Flap Spars
Details
     

 07-07-2003
1.50
Cleco and Drill Flap Ribs to Spars
Details
       

 06-29-2003
1.00
Prime Aileron Gap Fairings
Details
     

 06-28-2003
3.50
Prep Gap Faiirings; Prime Flap Fairings
Details
       

 06-28-2003
2.00
Match Drill Gap Fairings to Rear Spar
Details
       

 06-28-2003
2.00
Debur Rear Spars; Prime Aileron Brackets
Details
       

 06-20-2003
0.50
Rivet Nutplates; Inboard Access Panels
Details
     

 06-20-2003
1.00
Drill Inboard Aileron Attach Brackets
Details
       

 06-20-2003
1.00
Drill Aileron Brackets to Rear Spar
Details
       

 06-19-2003
1.25
Prep for Nutplates; Inboard Access Panel
Details
       

 06-18-2003
2.00
Inventory - Unpacking
Details
       

 06-18-2003
2.00
Inventory - Move to Crawl Space
Details
       

 06-18-2003
1.00
Inventory - continued
Details
       

 06-18-2003
1.00
Fuselage Kit Arrives; Inventory
Details
       

 06-16-2003
1.00
Install Nutplates; Outboard Access Panel
Details
       

 06-15-2003
1.00
Debur Edges of Bottom Skins
Details
       

 06-14-2003
0.50
Drill Out Gap Fairing Rivets - Rear Spar
Details
       

 06-14-2003
1.50
Dimple Outboard Bottom Skin
Details
       

 06-13-2003
1.50
Dimple Inboard Bottom Skin
Details
       

 06-12-2003
0.75
Debur Edges; Inboard Bottom Skin
Details
     

 06-11-2003
1.25
Conduit; Debur Bottom Inboard Skin
Details
       

 06-10-2003
0.50
Set Inboard-most 5 Rivets - Rear Spar
Details
       

 06-10-2003
0.50
Set Inboard-most 5 Rivets - Rear Spar
Details
       

 06-09-2003
1.00
Move Right Wing From Jig to Cradle
Details
       

 06-09-2003
0.75
Debur Right Fuel Tank Skin Edges
Details
       

 06-09-2003
4.00
Bolt / Screw Fuel Tank to Wing
Details
       

 06-08-2003
2.50
Rivet Top Skins to Rear Spar/Inboard Rib
Details
       

 06-07-2003
3.00
Rivet Top Main Skins to Wing
Details
       

 06-07-2003
2.00
Proseal Fuel Pick-up Tube / Access Plate
Details
       

 06-05-2003
2.50
Prep / Dimple Outboard Top Skin
Details
       

 06-05-2003
2.50
Prep / Dimple Inboard Top Skin
Details
       

 06-05-2003
1.00
Cleco Top Main Skins to the Wing
Details
       

 06-04-2003
2.00
Rivet Leading Edge Skins to Spar
Details
       

 06-04-2003
2.00
Rivet Leading Edge Ribs to Spar
Details
       

 06-04-2003
1.00
Debur Leading Edge Skin Edges
Details
     

 06-03-2003
1.75
Debur/Dimple/Prime Bottom Rib/Spar Flngs
Details
       

 06-03-2003
2.00
Debur Top Inboard Skin/Bottom Ribs/Spars
Details
       

 06-02-2003
2.00
Debur/Dimple/Prime Wing Walk Doubler
Details
       

 06-02-2003
1.00
Debur / Dimple Top Rib & Spar Flanges
Details
       

 06-02-2003
1.00
Countersink Rear Spar; Prime Front Spar
Details
       

 06-01-2003
1.00
Debur Top of Rib/Spar Flanges
Details

 05-24-2003
5.00
Proseal End Ribs / Baffle - Close Tank
Details
       

 05-23-2003
1.50
Drill Fuselage Attach Angle; Prep Baffle
Details
       

 05-21-2003
2.00
Proseal Drain and Fuel Pickup Fitting
Details
       

 05-19-2003
1.00
Proseal BNC and Vent Fittings
Details
       

 05-18-2003
1.00
Miscellaneous ProSealing
Details
       

 05-18-2003
1.00
Install Vent Line
Details
       

 05-18-2003
1.00
Install Outboard Capacitance Plate
Details
       

 05-17-2003
1.50
Position/Drill Fuel Pickup Fittings
Details
       

 05-17-2003
1.50
Drill BNC & Vent Fittings; Rivet Sender
Details
       

 05-16-2003
0.50
Rivet Reinf. Ring / Nutplates to Rib
Details
       

 05-16-2003
1.00
Fabricate Anti-Rotation Bracket
Details
       

 05-16-2003
1.00
Drill Access Ring to Inboard Rib
Details
       

 05-15-2003
2.00
Fabricate Attach Angle;Drill Access Hole
Details
       

 05-13-2003
4.00
Proseal / Rivet 5 Interior Tank Ribs
Details
       

 05-12-2003
4.50
Proseal/Rivet Stiffeners; Prep Ribs
Details
       

 05-11-2003
1.00
Debur, Scuff, Dimple Tank Stiffeners
Details
       

 05-05-2003
1.50
Dimple Right Fuel Tank Skin
Details
       

 05-03-2003
1.50
Drill Drain & Fuel Cap Flange to Skin
Details
       

 05-03-2003
1.50
Debur Right Tank Skin; Scuff for Proseal
Details
       

 05-02-2003
1.75
Tank Stiffeners; Cut, Drill, Debur
Details
       

 05-01-2003
0.50
Countersink Bottom Tank Skin for Baffle
Details
       

 04-30-2003
1.00
Countersink Top Tank Skin for Baffle
Details
       

 04-29-2003
1.00
Finish Countersinking Top Spar;Tank Time
Details
       

 04-28-2003
0.25
Countersink Top Main Spar for Skins
Details
     

 04-26-2003
1.00
Rivet Right Leading Edge - Top
Details
       

 04-26-2003
1.00
Rivet Right Leading Edge - Bottom
Details
       

 04-23-2003
1.75
Countersink Top Main Spar for Skins
Details
     

 04-22-2003
1.00
Countersink Top Main Spar for Skins
Details
     

 04-21-2003
0.50
Cleco Bottom Skins; Remove Top Skins
Details
       

 04-20-2003
3.25
Countersink the Bottom Spar Flange
Details
       

 04-19-2003
1.50
Finish Dimpling Leading Edge; Cleoco LE
Details
       

 04-18-2003
0.75
Rivet Nutplates to W-423 Joint Plate
Details
     

 04-18-2003
1.50
Debur / Begin Dimpling Leading Edge Skin
Details
       

 04-16-2003
2.00
Dimple/Countersink Joint Plate; Prime
Details
       

 04-15-2003
0.75
Drill Nutplate Holes in W423 Joint Plate
Details
       

 04-15-2003
1.00
Countersink Z-Brackets; Rivet Nutplates
Details
       

 04-13-2003
2.00
Prime Leading Edge Ribs
Details
       

 04-13-2003
0.50
Drill Nutplate Holes in Z-Brackets
Details
       

 04-12-2003
1.00
Remove Tank; Drill Center Z-Brackets
Details
       

 04-12-2003
1.00
Match-Drill Fuel Tank; Skin,Ribs,Joint
Details
       

 04-12-2003
1.00
Drill Inboard/Outboard Brackets to Ribs
Details
       

 04-12-2003
1.00
Debur/Dimple Leading Edge Ribs
Details
       

 04-11-2003
1.00
Drill Z-Brackets to Spar
Details
       

 04-11-2003
0.25
Cleco Fuel Tank to Spar
Details
       

 04-11-2003
0.25
Cleco Fuel Tank to Spar
Details
       

 04-04-2003
0.75
Measure & Drill Center Holes- Z-Brackets
Details
     

 04-02-2003
2.00
Staighten Tank Ribs; Cleco Tank
Details
       

 03-31-2003
0.75
Debur Tank Ribs; Remove Skin Plastic
Details
     

 03-24-2003
0.75
Scotchbrite Tank Ribs and Z-Brackets
Details
     

 03-23-2003
1.00
Drill Leading Edge: Skin/Ribs/Joint/Spar
Details
       

 03-22-2003
1.50
Drill Joint Plate & Inboard LE Rib
Details
     

 03-20-2003
2.00
Straighten Leading Edge Ribs / Cleco
Details
       

 03-17-2003
1.25
Debur Edges of Leading Edge Ribs
Details
       

 03-16-2003
3.00
Drill Main Skins to Ribs and Spars
Details
       

 03-16-2003
2.50
Cut and Drill Wing Walk Doubler
Details
       

 03-15-2003
1.50
Mount Right Wing in Jig
Details
       

 03-09-2003
1.25
Rivet Rear Spar to Main Ribs
Details
       

 03-08-2003
1.00
Wash and Prime Ribs 13 and 14
Details
       

 03-08-2003
3.00
Rivet Main Ribs to Front Spar
Details
       

 03-05-2003
1.50
Wash and Prime Ribs 10, 11, and 12
Details
       

 03-04-2003
1.50
Wash and Prime Ribs 7, 8, and 9
Details
       

 02-23-2003
1.50
Wash and Prime Ribs 4, 5, and 6
Details
       

 02-23-2003
0.50
Suspend Wing Tips from Ceiling
Details
     

 02-22-2003
1.50
Wash and Prime Ribs 1, 2, and 3
Details
       

 02-10-2003
1.00
Rivet Z-Bracket Nutplates to Spar
Details
       

 02-10-2003
1.00
Drill Wiring Conduit Holes; Ribs to Spar
Details
       

 02-10-2003
1.00
Dissassemble/Debur Ribs/Spars
Details
       

 02-03-2003
1.00
Run Wiring Conduit; Cleco Bottom Skins
Details
       

 02-03-2003
1.00
Moved Left Wing from Jig to Cradle
Details
       

 02-03-2003
1.00
Bolt / Screw Fuel Tank to Wing
Details
       

 02-02-2003
0.75
Prime Main Spar - 2nd Coat
Details
       

 01-30-2003
1.00
Prime Countersunk Holes on Spar
Details
       

 01-26-2003
2.00
Proseal Tank Access Panel
Details
       

 01-25-2003
4.00
Build Wing Cradle
Details
       

 01-18-2003
4.00
Rivet Baffle and Z-Brackets to Tank
Details
       

 01-11-2003
1.50
Rivet Top Main Skins to Rear Spar
Details
       

 01-06-2003
0.75
Cut out skin stiffeners
Details
       

 01-05-2003
1.00
Squeeze rivets - inboard rib; Stiffeners
Details
       

 01-02-2003
2.50
Rivet Top Main Skins
Details
       

 01-01-2003
2.50
Tank Wiring / Proseal BNC Connector
Details
       

 01-01-2003
2.75
Debur / Dimple Bottom Main Skins
Details
       

 12-30-2002
0.50
Debur Top Inboard Skin
Details
     

 12-29-2002
1.00
Remove Plastic from Bottom Skins
Details
       

 12-28-2002
1.50
Begin Riveting Top Inboard Main Skin
Details
     

 12-27-2002
1.50
Fit / Cleco Top Inboard Skin to Wing
Details
       

 12-27-2002
1.50
Debur Dimples in Rear Spar; Sand Skin's
Details
       

 12-27-2002
0.50
Cleco Top Outboard Skin to Wing
Details
       

 12-26-2002
1.00
Dimple Top Outboard Main Skin
Details
     

 12-25-2002
1.50
Debur Outboard Skin; Prime Wing Walk Dbl
Details
       

 12-24-2002
0.75
Remove Plastic; Begin Deburring Skins
Details
     

 12-15-2002
2.50
Debur/Dimple Doubler & Top Inboard Skin
Details
       

 12-15-2002
2.50
Debur / Dimple Top of Ribs & Rear Spar
Details
       

 12-14-2002
0.50
Removed Top Main Skins
Details
       

 12-13-2002
0.50
Rivet Frwd-Most, Inboard-Most Rib Holes
Details
     

 12-13-2002
1.00
Locate and Drill Pitot Tube to Spar
Details
       

 12-13-2002
1.50
Debur and Dimple Bottom of Ribs/Spars
Details
       

 12-07-2002
5.00
Pro-Seal and Rivet All Fuel Tank Ribs
Details
       

 12-07-2002
4.50
Pro-Seal and Rivet All Fuel Tank Ribs
Details
       

 12-06-2002
2.00
Cleco Fuel Tank Ribs to Skin
Details
     

 12-05-2002
1.50
Prep for First Pro-Seal Session
Details
       

 12-05-2002
3.50
First Pro-Seal Session
Details
       

 12-04-2002
3.00
Finish Dimpling Tank Skin; Cover Tooling
Details
       

 12-04-2002
3.00
Final Fuel Tank Prep Work
Details
       

 12-03-2002
2.00
Attach 48" Wire to Outboard Capac. Plate
Details
     

 12-02-2002
2.00
Solder Wire to BNC Connector
Details
     

 12-02-2002
2.00
Fabricate Anti-Rotation Bracket - Pickup
Details
       

 12-02-2002
1.00
Drill Access Ring in Inboard Tank Rib
Details
       

 12-02-2002
1.00
Countersunk/Riveted Reinf Ring to Rib
Details
       

 12-01-2002
2.00
Trim/Rivet Nutplates on Capacitance Plat
Details
       

 11-30-2002
2.00
Drill Stiffeners / Fuel Cap to Skin
Details
       

 11-30-2002
1.00
Drill Drain to Skin / Countersink Cap
Details
       

 11-30-2002
2.00
Debur / Dimple Tank Components
Details
       

 11-29-2002
2.50
Fabricate T-405 Tank Attach Angle
Details
       

 11-29-2002
0.50
Disassemble Left Fuel Tank
Details
     

 11-28-2002
1.50
Rivet Bottom of Leading Edge to Spar
Details
       

 11-27-2002
2.00
Rivet Leading Edge Ribs to Front Spar
Details
       

 11-27-2002
1.25
Finish Countersinking Top of Front Spar
Details
       

 11-16-2002
1.00
Rivet Top of Leading Edge to Spar
Details
     

 11-16-2002
1.25
Countersink Top Tank Skin for Baffle
Details
     

 11-15-2002
0.25
Match Drill Leading Edge Ribs to Spar
Details
     

 11-15-2002
0.75
Countersink Tank Skin for Baffle
Details
     

 11-10-2002
2.50
Cut/Debur Stiffeners; Countersink Skin
Details
       

 11-09-2002
2.00
Cleco Baffle to Tank; Drill Screw Holes
Details
       

 11-08-2002
1.50
Debur Leading Edge Skin
Details
     

 11-03-2002
0.50
Cleco Leading Edge to Spar
Details
       

 11-02-2002
3.50
Rivet Leading Edge; Countersink Spar
Details
       

 11-01-2002
2.50
Countersink Bottom of Spar for Skins
Details
       

 11-01-2002
0.50
Cleco Bottom Skins; Remove Top Skins
Details
       

 10-31-2002
1.50
Begin Riveting Leading Edge
Details
       

 10-30-2002
3.00
Prime Leading Edge Ribs; Dimple Skin
Details
       

 10-30-2002
3.00
More Leading Edge Prep
Details
       

 10-30-2002
0.50
Cleco Leading Edge Back Together
Details
       

 10-29-2002
0.25
Engraved Fuel Caps
Details
     

 10-29-2002
2.00
Debur/Dimple Leading Edge Ribs - Prime
Details
       

 10-29-2002
2.00
Countersink Coupler for Nutplates, etc.
Details
       

 10-28-2002
1.00
Z Brackets Drilled;Ribs & Baffle Removed
Details
       

 10-28-2002
1.00
Left Fuel Tank Clecoed to Wing
Details
       

 10-28-2002
1.00
Install Nutplates for Inboard Z Bracket
Details
       

 10-28-2002
1.00
Drill Outboard Z Bracket
Details
       

 10-28-2002
1.00
Drill Inboard Z Bracket; Remove Leading
Details
       

 10-28-2002
1.00
Cleco Fuel Tank and Position on Spar
Details
       

 10-27-2002
0.50
Rivet Nutplates on Fuel Tank Z Brackets
Details
     

 10-27-2002
2.00
Measure & Drill Z Brackets to Front Spar
Details
       

 10-27-2002
2.00
Countersink Z Brackets for Nutplates
Details
       

 10-24-2002
1.00
Install Nutplates on 3rd Access Panel
Details
       

 10-23-2002
1.50
Install Nutplates on 2 Access Panels
Details

 10-21-2002
1.00
Drill Holes for Access Panels - Bottom
Details

 10-20-2002
3.00
Cleco & Drill Leading Edge to Wing
Details
       

 10-20-2002
3.00
Build Leading Edge Cradle & Cleco
Details
       

 10-19-2002
1.00
Drill Left Wing Walk Doubler
Details
       

 10-19-2002
2.00
Drill Left Wing Skins to Ribs and Spars
Details
       

 10-18-2002
1.50
Cleco Bottom Left Skins - Cut Doubler
Details
       

 10-17-2002
2.00
Level Jig and Cleco Top Left Main Skins
Details
       

 10-16-2002
1.00
Mount Left Wing in Jig
Details
       

 10-13-2002
1.00
Anchor Wing Jig Posts
Details
     

 10-12-2002
2.00
Rivet Ribs to Front Spar - Left Wing
Details
       

 10-12-2002
2.50
Rivet Left Main Ribs to Rear Spar
Details
       

 10-11-2002
1.00
Debur Spars; Cleco Left Wing Together
Details
     

 10-10-2002
2.50
Finish Priming Main Ribs for Left Wing
Details
     

 10-09-2002
1.50
Prime 4 More Left Wing Main Ribs
Details
       

 10-08-2002
1.50
Prime 4 Left Wing Main Ribs
Details
       

 10-07-2002
1.00
Drill Wiring Conduit Holes-Left Wing Rib
Details
     

 10-04-2002
4.00
Finish Rib Prep-Drill Ribs to Left Spars
Details
       

 10-01-2002
1.00
Straighten 5 More Main Ribs
Details
       

 09-30-2002
1.25
Straighten 5 More Main Ribs
Details
       

 09-29-2002
6.25
Ribs- Debur Lightening Holes; Straighten
Details
       

 09-27-2002
1.50
Ribs - Polish Edges on Scotchbrite Wheel
Details
       

 09-21-2002
1.50
Prime Rear Spars
Details
       

 09-21-2002
1.00
Complete Rear Spars
Details
       

 09-21-2002
1.00
Cleco Rear Spars and Begin Riveting
Details
       

 09-20-2002
2.00
Debur/Prime Rear Spar Reinf. Plates
Details
       

 09-19-2002
1.00
Debur Rivet Holes In Rear Spars
Details

 09-18-2002
2.00
Drill Rear Spar Components
Details
       

 09-17-2002
3.00
Debur Edges & Cleco Rear Spar Components
Details
       

 09-16-2002
2.00
Bolt Tie Downs and Bellcranks to Spar
Details
       

 09-15-2002
1.00
Right Tie Down Assembly Drilled to Spar
Details
       

 09-15-2002
1.00
Prime Tie Down Components
Details
     

 09-15-2002
1.25
Fabricate the Tie Down Assemblies
Details
       

 09-15-2002
1.50
Clamp and Drill Left Tie Down to Spar
Details
       

 09-14-2002
1.00
Rivet 2 Nutplates on inboard web of spar
Details
       

 09-14-2002
0.25
Right Tie Down Spacers Drilled to Spar
Details
     

 09-14-2002
2.75
Fabricate Tie Down Spacers
Details
       

 09-12-2002
2.50
Finish all Nutplate Countersinks-Flanges
Details
       

 09-06-2002
0.50
Finish Left Bottom #6 Nutplates - Access
Details

 09-05-2002
0.25
Start Countersinking Left Access Panel
Details

 09-02-2002
1.00
Countersink #8 Holes - Bottom Flanges
Details

 09-02-2002
1.00
Access Panel Nutplates - Right Bottom
Details

 09-01-2002
1.00
Rivet Nutplates on Top Right Flange
Details
       

 09-01-2002
1.00
Rivet Nutplates on Top Left Flange
Details
       

 09-01-2002
3.25
Countersink-Nutplates on Bottom Flanges
Details
       

 08-31-2002
1.00
Complete Top Flange Countersinks
Details
     

 08-30-2002
2.00
Countersink #8 Screw Holes on Top Flange
Details
     

 08-29-2002
2.00
Countersink Rivet Holes for Nutplates
Details
       

 08-24-2002
3.00
Roll and Rivet Leading Edges
Details
       

 08-24-2002
3.00
Rework - Trim Tab Adjustments
Details
       

 08-24-2002
0.50
Elevator's - Complete for now...
Details
     

 08-12-2002
2.50
Align Trim Tab to Elev, Drill/Rivet Hing
Details
       

 08-11-2002
2.00
Rework - Trim Tab Cutout - Fit New Rib
Details
       

 08-10-2002
0.50
Rework - Cut Off Tabs
Details
     

 08-09-2002
0.50
Rivet Bottom Edge of Trim Tab Spar
Details
     

 08-07-2002
1.50
Form Trim Tab Horn: Prime all Parts
Details
     

 08-05-2002
1.50
Drill Trim Tab
Details
       

 08-04-2002
1.75
Rivet Left Elevator
Details
       

 08-04-2002
0.75
Complete Trim Tab Bends - Cleco Trim Tab
Details
       

 08-04-2002
0.75
Bend Tabs on Trim Tab Skin
Details
       

 08-03-2002
2.00
Replaced Platenuts with Dimpled Platenut
Details
       

 08-03-2002
2.00
Dimple Left Skin; Bend Tabs for Trim Tab
Details
       

 08-03-2002
2.00
Countersink Access Plate, Rivet Platenut
Details
       

 08-03-2002
2.00
Cleco left elevator together
Details
       

 08-01-2002
2.00
Primed New E606 and Riveted Skeleton
Details
       

 07-30-2002
1.50
Inventory Wing Kit
Details
       

 07-30-2002
1.50
Countersink Counterbalance & Other Parts
Details

 07-30-2002
1.50
Complete wing inventory
Details
       

 07-29-2002
1.50
The Wings are Here!!!!!
Details
       

 07-29-2002
1.00
Opened Wing Crates, Moved Parts Inside
Details
       

 07-29-2002
0.50
All of the wing parts in the living room
Details
       

 07-17-2002
1.50
Prime Left Elevator Understructure
Details

 07-16-2002
0.50
Scotch Brite Left Understructure
Details

 07-15-2002
1.00
Debur and Dimple Understructure
Details

 07-13-2002
1.50
Disassemble Left Elevator-Start to Debur
Details

 07-11-2002
1.00
Cleco & Final Drill Entire Left Elevator
       

 07-11-2002
1.00
Begin understructure of left elevator
       

 07-09-2002
1.50
Riveted stiffeners & E615 to Left Skin
Details
       

 06-30-2002
2.50
Primed Stiffeners/E615 & Dimpled Skin
Details
       

 06-28-2002
0.50
Finished Deburring the Left Skin

 06-27-2002
1.50
Scotchbrite stiffeners / Remove Plastic
Details
     

 06-24-2002
1.00
Debur / Dimple Stiffeners / E615

 06-23-2002
2.50
Completed Right Elevator; started Left
Details
       

 06-21-2002
1.75
Ribs, Spar, & Control Horn Riveted
Details
       

 06-19-2002
1.25
Right Elevator Components Primed
     

 06-18-2002
2.25
Debur, Dimple, and Scotchbrite
Details
     

 06-16-2002
2.50
Disassemble and Debur Right Elevator
Details
     

 06-15-2002
2.25
Rivet stiffeners, cleco/drill right elev
Details
       

 06-15-2002
2.25
Primed stiffeners, prepared skin
Details
       

 06-13-2002
0.25
Letter From Van's - New Rudder
Details

 06-13-2002
2.25
Debur, Dimple Skin; Drill Counterbalance
Details
       

 06-12-2002
1.50
Scotchbrite Stiffeners, Remove Plastic
Details
     

 06-11-2002
1.50
Right: Drill Stiffeners to Skin
Details
       

 06-10-2002
1.00
Rudder Complete!
       

 06-10-2002
2.00
Rolled and Riveted Leading Edge
Details
       

 06-08-2002
1.50
Riveted Skin to Understructure
Details
       

 06-08-2002
2.50
Rivet Understructure
Details
       

 06-07-2002
2.00
Primed Spar, Ribs and Other Components
Details
     

 06-06-2002
3.00
Finished preparing Spar, Ribs, Skin
Details

 06-06-2002
1.50
Cut out the stiffeners
Details
     

 06-05-2002
1.00
Debur holes and edges
Details

 06-04-2002
3.00
Skin and spar clecoed and drilled
Details
       

 06-03-2002
2.00
Start of Rudder skeleton
Details
     

 06-02-2002
3.50
Debur/dimple skin, rivet stiffeners
Details
       

 06-01-2002
3.50
Washed and primed stiffeners
Details
       

 05-31-2002
1.50
Deburred, dimpled, polished stiffeners
Details
     

 05-30-2002
0.75
Right side stiffeners drilled to skin
       

 05-30-2002
0.75
Left side stiffeners drilled to skin
       

 05-29-2002
1.50
Cut Stiffeners
Details
     

 05-28-2002
1.00
Vertical Stabilizer Complete.
Details
       

 05-28-2002
1.00
Skin Riveted to Ribs and Spars
Details
       

 05-28-2002
1.50
Rivet front spar and center rib to skin
Details
       

 05-27-2002
3.00
Primed Ribs and Riveted Skeleton
Details
       

 05-27-2002
1.50
Debur and Dimple Skin
Details
     

 05-26-2002
2.00
Primed Spars
Details
     

 05-25-2002
2.00
Rear Spar
Details
       

 05-24-2002
2.00
Drilled Skin to Spars and Ribs
Details
       

 05-22-2002
1.50
Vertical Stabilizer Clecoed Together
Details
       

 05-21-2002
1.25
Start of Vertical Stabilizer
Details
       

 05-19-2002
0.50
Ooopps -Should have left some rivets out
Details
       

 05-19-2002
0.50
Horizontal Stablizer Complete!
Details
       

 05-18-2002
1.50
Skins riveted to the spars and ribs
Details
       

 05-18-2002
1.50
Cleco rear spar in place; start riveting
Details
       

 05-16-2002
1.00
Riveting Top Left Skin to Spar and Ribs
Details
       

 05-16-2002
1.00
Rivet HS-707 Rib to Left Skin
Details
       

 05-16-2002
1.50
Left side complete, start of right side
Details
       

 05-16-2002
2.00
Both skins riveted to front spar & ribs
Details
       

 05-16-2002
1.00
Attaching left skin to front spar / ribs
Details
       

 05-14-2002
0.50
Rivet Front Spar
Details
       

 05-14-2002
0.50
HS-404 & 405 Ribs riveted to front spar
Details
     

 05-12-2002
2.00
Riveted Rear Spar
Details
       

 05-12-2002
3.00
Dimpled Skins
Details
       

 05-11-2002
3.00
Debur Skins
Details
       

 05-10-2002
8.00
Dimple, Debur, Edge, Prime Ribs & Spars
Details
       

 05-09-2002
1.50
Start of Right Side
Details
       

 05-09-2002
1.50
Right Side Completed
Details
       

 05-08-2002
1.50
Match Drilling the Left Side
Details
       

 05-08-2002
1.00
Left side complete
Details
     

 05-08-2002
1.00
Cleco / Drill Left Side
Details
       

 05-07-2002
0.50
Drilled ribs to spars
Details
     

 05-06-2002
1.50
Straightened and Finished All Ribs
Details
     

 05-05-2002
1.00
Notched the HS404 ribs
Details
     

 05-05-2002
1.00
Match Drilled Rear Spar
Details
     

 05-05-2002
1.00
Completed Rear Spar
Details
     

 05-05-2002
1.00
Completed HS-411PP / VA-146 Hinge Assemb
Details
       

 05-05-2002
2.50
Completed Front Spar
Details
       

 05-04-2002
1.50
Start of Rear Spar
Details
     

 05-04-2002
0.25
Ordered Wing Kit
Details
       

 05-04-2002
1.50
Inventoried rest of the Empennage Kit
Details
       

 05-03-2002
1.00
Inventoried all of the small parts
Details
       

 04-30-2002
0.50
Received 2 Boxes from Van's
Details
       

 04-21-2002
0.25
Ordered Empennage Kit
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.