The final 2 things that needed to be done before clecoing the aft skins back on was to install the static tubing and run the wiring conduit. Drilling/punching out the mandrels from the pop rivet static ports turned out to be pretty easy. I had a heck of a time though inserting the T to connect the 2 static ports to the line that runs to the instrument panel. Very tight fit. I used Permatex RTV Blue to secure and seal the tubing to the pop rivet static ports. I then used tie wraps to secure the tubing to the F708 bulkhead. Once the static tubing was run, I fed the wiring conduit through the lower webs of the bulkheads. Time to cleco on the top skins for the final time.