KitLog pro

Powered By Kitlog Pro v2.0

Dan's Web Site
' style=
Date:  1-16-2005
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Cleco Aft Top Skins; Prime Fuel Tank Bkt

Once the static tubing and wiring conduit were installed I clecoed the aft top skins back on. The skin overlaps between the 2 skins and between the top skins and bottom skins were alodined if they hadn't already been primed. The final thing that I did today was experiment with 2 Rustoleum primers. I primed one of the fuel tank attach brackets with an enamel gray and the other one with a hammered gray. I actually like how they both came out. I also primed a scrap piece of aluminum to experiment some more with. I want to see how durable these paints are.
' style=

Aft top skins clecoed to fuselage - ready to be riveted

Aft top skins clecoed to fuselage - ready to be riveted

' style=

Aft top skins clecoed to fuselage - ready to be riveted

Aft top skins clecoed to fuselage - ready to be riveted

' style=

Fuel tank brackets primed with Rustoleum - 1 enamel, 1 hammered

Fuel tank brackets primed with Rustoleum - 1 enamel, 1 hammered

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.