The baggage side covers were then clecoed and match drilled to the ribs and bulkheads. The final tasks for the day were to drill lightening holes in the rudder/brake pedal center support bracket, countersink the F902 forward vertical bulkheads for nutplates and to enlarge the holes for the rudder cables to 5/8" using a unibit.
Left baggage side covers drilled to ribs and bulkheads
Right baggage side covers drilled to ribs and bulkheads