KitLog pro

Powered By Kitlog Pro v2.0

Dan's Web Site
' style=
Date:  11-8-2004
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Left Step: Drill Blocks to Tube / Rib

Once the right step was done I repeated everything for the left step. The blocks are drilled to the tube and baggage rib.
' style=

Both steps drilled and clecoed to fuselage

Both steps drilled and clecoed to fuselage

' style=

Inside view of right step - blocks drilled to tube and rib

Inside view of right step - blocks drilled to tube and rib

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.