KitLog pro

Powered By Kitlog Pro v2.0

Dan's Web Site
' style=
Date:  10-28-2002
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Drill Inboard Z Bracket; Remove Leading

After the #19 holes were drilled in the joint plate I drilled the holes in the inboard Z bracket using the pre-punched rib and baffle holes for a guide. Then the leading edge was removed to provide access for drilling the same holes in the outboard Z bracket.
' style=

Top view of joint plate - #19 holes drilled

Top view of joint plate - #19 holes drilled

' style=

Inboard Z bracket drilled to rib

Inboard Z bracket drilled to rib

' style=

Leading edge removed

Leading edge removed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.