KitLog pro

Powered By Kitlog Pro v2.0

Larry Winger's 601XL Project
' style=
Date:  6-6-2012
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Re-routed 5th bearing oil line

Ever since I first installed my 5th bearing oil line at Corvair College 13, I have been concerned about the possibility of rubbing on the back of the starter ring gear. Tonight I removed the old installation and made a straight shot down the pilot's side of the engine. This necessitated the removal of the spinner, spinner bulkheads and prop hub. Since re-setting the pitch on my prop was on my punch list, I think I'll just do it on one of my next sessions.
' style=

A straight shot

A straight shot

' style=

Straight swivel seal instead of the 60 degree used before

Straight swivel seal instead of the 60 degree used before

' style=

90 degree swivel seal instead of the 120 degree used before to go under engine

90 degree swivel seal instead of the 120 degree used before to go under engine

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.