KitLog pro

Powered By Kitlog Pro v2.0

Larry Winger's 601XL Project
' style=
Date:  10-20-2011
Number of Hours:  0.75
Manual Reference:  
Brief Description:  Installed ELT and soldered 1st lug

The other day I didn't have the correct length of 6-32 machine screws or the required nylock nuts. Tonight I finished my ELT installation and then ventured into the world of aircraft electronics with my first connector -- a soldered lug on #2 AWG wire to carry the main current from the master relay to the firewall.
' style=

1st electrical connection from the battery

1st electrical connection from the battery

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.