KitLog pro

Powered By Kitlog Pro v2.0

Larry Winger's 601XL Project
' style=
Date:  10-17-2011
Number of Hours:  2.25
Manual Reference:  
Brief Description:  ‌Installed battery and master solenoid relay

Installed the battery box using AN3 bolts and the relay with AN4 hardware. To prevent rubbing and movement between the metal box and battery, I wrapped the front and sides with leftover rubber baffle seal. This produced a nice, tight fit with no movement.
' style=

Battery, relay and brace in place

Battery, relay and brace in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.