KitLog pro

Powered By Kitlog Pro v2.0

Larry Winger's 601XL Project
' style=
Date:  9-9-2011
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Installed rubber baffle seals

Tonight was all about riveting the seals in place that I had clecoed during the other work session. Once they were firmly in place, I tried replacing the nosebowl only to discover that the seals were too bulky and intruded too much into the space needed by the nosebowl. I then trimmed approximately 3/4" from the bottom seal, which allowed the nosebowl to fit snuggly against the rubber seal. To test the final fit, I reinstalled the entire nosebowl/cowling assembly.
' style=

Seals riveted in place

Seals riveted in place

' style=

Side view

Side view

' style=

Directing the airflow over the oil cooler

Directing the airflow over the oil cooler

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.