Brief Description: More detail work on the top of the right wing pane
1. Applied heavy bed (two coats) of Ekobond on periphery of top side of right wing. 2. Installed top fabric 3. Heat bonded the periphery 4. Brushed on glue to bed of Ekobond 5. Folded fabric at leading and trailing edges and heat formed into the glue bed 6. Brushed on glue in two stages (to avoid loosening from the heat forming/anchoring)