KitLog pro

Powered By Kitlog Pro v2.0

KENNETH T.'S WEB SITE
' style=
Date:  6-28-2009
Number of Hours:  4.00
Manual Reference:  Self fabrication
Brief Description:  Fabricated doubler for center tunnel cover.

When installing my parking brake in the center tunnel, I had to cut a slot in the cover for the brake actuator to operate. The cover is so thin that the slot weakened it a lot, therefore, I realized it had to be reinforced. I bent a piece of 0.063 aluminum sheet and made a doubler for this purpose. Of course, it always takes more time than I had anticipated. Four hours later I had it fabricated, primed, and riveted.

Waiting for words from Van's builder's assistance about our canopy frame.
' style=

Doubler before riveting.

Doubler before riveting.

' style=

Doubler after riveting.

Doubler after riveting.

' style=

Center cover installed over parking brake valve.

Center cover installed over parking brake valve.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.