Work Logs Found: 68
Category Work Time: 306 Hours
 Date
Hours
Work Log Summary

Details

 03-07-2013
4.00
Nutplate installed on elevator horn inspection hol
Details
       

 03-05-2013
4.00
Sanded fairing & connected elevator push rod.
Details
       

 03-04-2013
3.50
Trimmed off excess glass on empennage fairing.
Details
       

 03-03-2013
4.50
Brake, airblast tube, and empennage work.
Details
       

 02-26-2013
4.00
Began measuring baffles for trimming.
Details
     

 02-25-2013
4.00
Riveted rudder cable fairings.
Details
       

 02-23-2013
4.00
Continued empennage work.
Details
       

 02-22-2013
4.00
Trimmed empennage fairing.
Details
       

 02-18-2013
3.50
Removed enclosure for more needed work.
Details
     

 02-17-2013
4.00
Crimped pins to wires for circular molex connector
Details
       

 02-15-2013
4.00
Final fitting of the bottom rudder enclosure.
Details
       

 02-14-2013
3.50
More trimming on bottom rudder enclosure.
Details
     

 02-13-2013
4.00
Pulled wires through the aft bulkhead.
Details
       

 02-12-2013
4.00
Started installing rudder bottom enclosure.
Details
       

 02-11-2013
4.00
Fabricated rudder pedal to cable links & installed
Details
       

 02-08-2013
4.00
Pulled rudder cables.
Details
       

 02-07-2013
4.50
Worked on upper & lower horz. fairings.
Details
       

 02-06-2013
4.00
Drilled empennage fairing screw holes.
Details

 02-05-2013
4.00
Installed Vert Stab with AntiSplat mod.
Details
     

 02-04-2013
4.00
Drilled nutplate holes on vert & horiz. stabs.
Details

 02-02-2013
4.00
Installed Horizontal Stabilizer
Details

 03-17-2012
6.00
Installed rudder stops.
Details
       

 03-16-2012
4.00
Installed rudder to vertical stabilzer.
Details
     

 03-12-2012
4.00
Riveted attach plate to VS forward spar.
Details
       

 03-10-2012
4.00
Match drilled VS forward spar to attach plate.
Details
       

 03-09-2012
6.00
Clamped VS to the forward spar attach plate.
Details
     

 03-08-2012
3.00
Clamped VS to the HS for measuring.
Details
       

 03-07-2012
4.00
Started installing vertical stabilizer.
Details
       

 03-02-2012
6.00
Elevator deflection angles continued.
Details
       

 02-28-2012
8.00
Installed elevator pushrods to check deflection an
Details
       

 02-26-2012
5.00
Connected elevator trim wiring in aft tailcone.
Details
       

 02-24-2012
4.00
Installed elevator trim servo.
Details
       

 02-23-2012
5.00
Drilled HS forward and aft spars.
Details
       

 02-22-2012
4.00
Started leveling HS on aft deck.
Details
       

 02-18-2012
2.00
Started installing empennage.
Details
       

 07-10-2009
5.00
Cut the flanges off the canopy bubble.
Details
       

 05-12-2009
4.00
Started riveting the panel framework to firewall.
Details
       

 06-23-2008
2.00
Finished installing VS tip.
Details
       

 06-20-2008
3.00
Fabricated HS tip plexiglass enclosure.
Details
     

 06-18-2008
3.00
Start install of Tip on Vertical Stabilizer.
Details
       

 06-17-2008
3.00
Enclosed HS Tips using Plexiglass & Fiberglass.
Details
       

 06-16-2008
4.00
Started Horizontal Stab Tips Installation.
Details
       

 06-11-2008
4.00
Installed elevators onto horizontal stabilizer.
Details
       

 06-09-2008
5.00
Finish elevator tips installation.
Details
       

 06-07-2008
4.00
Mounted elevators to HS.
Details
       

 06-05-2008
3.00
Start to install elevator fiberglass tips.
Details
     

 06-04-2008
5.00
Installed elevator trim servo.
Details
       

 06-03-2008
4.50
Installed elevator rod end hinges & counter weight
Details
       

 05-25-2007
1.00
Drilled out bad rivets and used new Tungsten bucki
Details
       

 05-22-2007
2.00
Riveted the VS rear spar to the other side of the
Details
       

 05-21-2007
2.00
Inventoried ordered tools then tried riveting the
Details
       

 05-17-2007
3.00
Riveted VS skin to the VS frame (ribs and front sp
Details
       

 05-16-2007
5.00
Riveted VS ribs to the front spar with difficulty.
Details
     

 05-15-2007
4.00
Riveted the rear spar, doubler and hinge brackets.
Details
       

 05-14-2007
3.00
Set up and primed Vertical Stabilizer Components
Details
       

 05-12-2007
4.00
Tried to set up to prime VS components.
Details

 05-11-2007
4.50
Dimpled spars and ribs and countersunk holes in do
Details
       

 05-10-2007
2.00
Finished deburring components and dimpled skin.
Details
       

 05-09-2007
4.00
Match drilled VS skin to frame then disassembled a
Details
     

 05-08-2007
3.00
Assembled and drilled frame then clecoed skin on.
Details
       

 03-14-2007
0.00
Home with the goodies.
Details
       

 03-11-2007
4.00
Finished and installed trim tab.
Details
       

 03-10-2007
11.50
Finish riveting HS skins and elevator skins.
Details
       

 03-09-2007
11.00
Rivet rudder and start riveting HS skins.
Details
       

 03-08-2007
11.50
Start Elevator Prep and riveting HS rear spar.
Details
       

 03-07-2007
10.75
Finished HS Prep and start Rudder Prep
Details
       

 03-06-2007
11.50
Continued prepping Horizontal Stabilize.
Details
       

 03-05-2007
10.00
Started on the empennage kit by inventoriing.
Details
       