KitLog pro

Powered By Kitlog Pro v2.0

KENNETH T.'S WEB SITE
' style=
Date:  2-13-2013
Number of Hours:  4.00
Manual Reference:  Vans
Brief Description:  Pulled wires through the aft bulkhead.

I decided to pull the wires through the aft bulkhead in an opening between the tie down plate riveted to the forward side of the bulkhead and the hole at the bottom. I had to enlarge the left side of the hole to pass the aycrilic tubing containing the wires. I used a file and then deburred as best I could using a small fine file. The wires were run past the last two bulkheads in the 3/8" tubing on the left J channel. After pulling the tubing and wires through the aft bulkhead, I trimmed the tubing (very carefully to not cut the wires) back to be even to the aft tailcone skin line.
' style=

Filing an opening larger to pull the wires through.

Filing an opening larger to pull the wires through.

' style=

Wire and tubing pulled through the aft bulkhead.

Wire and tubing pulled through the aft bulkhead.

' style=

Removing rudder cable to move the rudder left and right.

Removing rudder cable to move the rudder left and right.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.