Brief Description: cut left and right fiberglass plies 1 - 5
Manual 34-14 step 4, cut both left and right side fiberglass plies 1 to 5. Set aside.
Did a test wet of some fiberglass similar in size to ply 1. Used way too much epoxy, was a good test for how mucj will be needed when the lay up is done.
Manual 34-14 partial step 6 cut away the 1/8 inch on both left and right side top of canopy frame that will be under the fiberglass.