Manual 40-13 steps 1-17, install cockpit LED lamp. Wires in the rollover structure were completed via previous steps. To be tested later.
Manual 43-03, steps 1, 2, 6 - 8, Deburr and install extra POH tray under the right side instrument panel. Holes for mounting were already punched into the panel bottom.