KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  5-18-2012
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Right Side of Fairing and Center

The right side of the fairing was taped to the fuselage like the left side had been. The center section was placed over top of the left side. The roller was used to smooth out the windshield/fuselage transition.
' style=

The right side

The right side

' style=

The center section overlay

The center section overlay

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.