KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  5-18-2012
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Began the Fairing Lay-up

The outline of the fiberglass cloth was drawn on the plastic sheet to ensure that the epoxy resin was applied in the appropriate area. Epoxy and resin were mixed and the fliberglassing began finally in making the windshield fairing. the epoxy resin was poured and brushed all over the plastic sheet and then a layer of cloth was placed on the sheet. The cloth had more epoxy resin poured/brushed on it and then the next five layers were added in the same manner, ensuring that each layer was totally soaked in resin.
' style=

The six layers of fiberglass cloth ready for the resin

The six layers of fiberglass cloth ready for the resin

' style=

The plastic sheet with the outline of the cloth drawn on it

The plastic sheet with the outline of the cloth drawn on it

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.