KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
Work Logs Found: 643
Category Work Time: 1225 Hours
 Date
Hours
Work Log Summary

Details

 05-27-2014
1.00
Riveted Data Plate/Applied Experimental Sticker
Details
       

 05-21-2014
0.50
Positioned Data Plate on Fuselage
Details
       

 05-21-2014
0.10
Installed Pitot Tube Cover
Details
     

 05-10-2014
2.00
Inspected Aircraft and Offered Suggestions
Details

 05-10-2014
2.00
Assisted with Fuselage Work
Details

 05-09-2014
2.00
Enlarged Left Control Stick Opening/#1 Comm Coax
Details
       

 05-07-2014
1.50
Enlarged Control Stick Openings in Seat Pans
Details

 05-05-2014
1.50
Trimmed Fuel Selector Valve Cover/Painted
Details
       

 05-05-2014
2.00
Taped Control Stick Limits for Seat Pan Trimming
Details
       

 05-05-2014
0.10
Photo-Template for Left Seat Pan Control Stick
     

 05-05-2014
0.20
Photo-Fuel Selector Valve Cover Painted
     

 05-04-2014
0.40
Pushed Rubber Grommets thru Fuselage Holes
Details
       

 05-04-2014
0.20
Labeled Oil Cooler Cable
Details
     

 04-18-2014
1.00
Tightened and Torqued Final Four Spar Bolts
Details
       

 04-18-2014
1.50
All Cockpit Fuel Lines Installed
Details
       

 04-17-2014
0.50
Installed Aluminum Tube over Rod
Details
     

 04-12-2014
0.50
Drilled Spar Bolt Hole in Right Fuel Side Cover
Details

 04-11-2014
0.50
Drilled Left Fuel Side for Spar Hole
Details

 04-10-2014
2.00
Drilled Left Side Cover for Spar Bolt
Details
     

 04-08-2014
1.00
Trimmed Right Seat Pan/Attached Trim Cable
Details
       

 04-08-2014
1.00
Photos-Fuel Selector and Top Cover
Details
       

 04-08-2014
2.00
Modified Fuel Selector Cover Pieces
Details
       

 04-08-2014
1.00
Fuel Lines on Brackets/Photo-Trim Cable
Details
       

 04-07-2014
0.50
Trimmed Front Corners of the Seat Pieces
Details
       

 04-07-2014
2.00
Removed Side Covers/Trimmed Seat Cover Corners
Details
       

 04-06-2014
3.00
Installed Fuel Selector Side Covers-Have to Redo!
Details
       

 03-31-2014
4.00
Cotter Pin in Left Rudder Cable/Alternator Belt
Details
       

 03-26-2014
2.00
Installed Moveable Center Seat Rib
Details
       

 01-13-2014
2.50
Enlarged Left Flap Control Rod Hole
Details
     

 01-13-2014
2.00
Assisted with Enlarging Flap Control Rod Hole
Details

 11-21-2013
2.00
AOA Tees/Fuel Guardian Controller
Details
     

 11-20-2013
2.00
AOA Tubing/Moved Pitot and Static Lines
Details
       

 11-19-2013
1.00
Attaching Pitot/Static Tubing to Fuselage Stringer
Details
       

 11-18-2013
4.50
Drilled Right Side Fuel Cover/Pitot Tubing
Details
       

 11-17-2013
2.00
Trimmed Right Fuel Line Side Cover
Details
       

 11-16-2013
1.00
Fuel Lines and Side Supports
Details
     

 11-16-2013
5.00
Enlarged Fuselage Holes/Fuel Line Supports
Details
       

 11-12-2013
2.50
Bolted Outboard Floor Brackets
Details
       

 11-08-2013
3.50
Two Outboard Floor Brackets
Details
       

 11-07-2013
2.00
Floor Bracket
Details

 11-01-2013
0.50
Marked Spar Bolts with Torque Seal
Details
     

 11-01-2013
1.50
Drilled and Bolted Two Floor Brackets to Spar
Details
       

 10-26-2013
3.00
Spar Bolts/Fuel Lines-Had to be Redone
Details
       

 10-26-2013
1.00
Floor Brackets/Visitors
Details
     

 10-25-2013
0.50
Enlarged Fuel Line Holes/Spar Bolt Torque Value
Details
     

 10-20-2013
4.00
Sanded Fuselage Area for Antennas
Details
       

 10-20-2013
2.00
Fuel Tank Line/Spar Bolts Torque
Details
       

 10-12-2013
7.00
Installed Close Tolerance Spar Bolts
Details
       

 10-12-2013
2.00
Assisted with Inserting Wing Spar Bolts
Details
     

 10-12-2013
2.00
Assisted with Inserting Spar Bolts
Details
     

 10-11-2013
7.00
Installed Most of the Spar Bolts
Details
       

 10-11-2013
4.00
Helped Install Wing Spar Bolts
Details
       

 10-10-2013
0.50
Began to Reassemble Fuel Selector Valve
Details
     

 10-03-2013
0.50
Fuselage Holes for Wires/Fuel Selector Valve
Details
       

 09-23-2013
1.00
Riveted Nutplates to Fuse/Tank Attach Brackets
Details
       

 09-15-2013
1.00
Cotter Pin in Tailwheel Bolt/Rudder Steering Link
Details
       

 09-13-2013
2.00
Tailwheel Installed and Torqued Bolts
Details
     

 09-12-2013
2.00
Greased Tailwheel and Reinstalled
Details

 09-11-2013
2.00
Installed Tail Wheel Fork
Details

 09-02-2013
2.50
Marked Fuselage Access Panel/Removed Tailwheel
Details
       

 08-15-2013
1.00
Canopy Cover/Ran Trim Cable thru Fuselage
Details
       

 06-28-2013
1.50
Cleaned Parts/Weight Checked on Elevators
Details

 05-06-2013
3.00
Primed Windshield Fairing/Top Skin/Fuselage
Details
       

 04-20-2013
5.00
Sanded Windshield and Top Skin
Details
       

 04-20-2013
0.50
Installed Screw on Fuel Tank/Fuse Bracket
Details
     

 04-15-2013
3.00
Sanded and Filled Windshield Fairing/Top Skin
Details
       

 04-10-2013
0.10
Photo-Windshield Fairing and Top Skin
     

 04-10-2013
4.00
Made Two F-699 Brackets
Details
       

 04-10-2013
3.50
Filled and Sanded Windshield Fairing
Details
       

 04-04-2013
2.50
Installed Nutplates in Fuselage and HS
Details
       

 03-27-2013
2.00
Worked on the Windshield Fairing
Details
       

 03-26-2013
0.50
Helped Move Wings/Fuselage to Shop
Details

 03-25-2013
1.50
Sanded Top Skin and Canopy Roll Bar
Details
       

 03-19-2013
3.50
Sanded Top Skin/Filled Rivets in Lower Cowl
Details
       

 03-19-2013
0.10
Right Wing Removed from Fuselage
     

 03-12-2013
0.50
Sanded Top Skin
Details
       

 03-12-2013
1.00
Sanded Forward Top Skin
Details
       

 03-12-2013
0.50
Sanded Forward Top Skin
Details
       

 02-28-2013
2.00
Helped Epoxy Reinforcements on Oil Door
Details
       

 02-27-2013
1.50
Windshield Fiberglass Work/Cowling
Details
       

 02-27-2013
0.50
Applied More Filler to Windshield Fairing
Details
     

 02-21-2013
2.00
Sanded the Forward Top Skin
Details
       

 02-20-2013
0.50
Applied Plio-Grip to Rivet Lines on Fwd Top Skin
Details
       

 01-22-2013
0.20
Photos-Empennage/Fuselage Nutplate Location
Details
       

 01-11-2013
1.00
Riveted Nutplate to Fuselage
Details
     

 01-04-2013
0.50
Drilled Nutplates for Empennage Fairing
Details
     

 08-30-2012
0.50
Installed Blade Transponder
Details
       

 08-23-2012
0.50
Roll Servo Temporarily in Place
Details
       

 08-19-2012
1.50
Prepared Skin/Doubler for Roll Servo
Details
       

 08-19-2012
0.50
Painted Center Fuselage Cover
Details
     

 08-14-2012
1.50
Trim Cable Indicator/Allowable Bend in Cable
Details
       

 08-14-2012
1.00
How to Take the Trim Cable Apart
Details
       

 08-14-2012
1.50
Drilled Trim Cable Hole in Center Fuselage
Details
       

 06-26-2012
1.00
Rubbed off Primer on Fuselage
Details
       

 06-19-2012
0.50
Installed Clip for Support Rod/Visitors
Details
       

 04-17-2012
1.00
Used Cherry Max Rivets to Finish Top Skin
Details
       

 04-17-2012
0.50
Cleaned up Scratches and Applied SuperFil
Details

 04-16-2012
2.50
Riveted Top Skin to Firewall
Details
       

 04-16-2012
2.50
Riveted Remainder of Top Skin
Details
     

 04-16-2012
3.50
Assisted with Riveting Remainder of Top Skin
Details
     

 04-12-2012
0.50
Riveted the Top Skin to the Firewall
Details
     

 04-12-2012
3.00
Riveted Part of the Instrument Top Skin
Details
     

 04-12-2012
3.00
Assisted with Riveting the Top Skin
Details
     

 04-11-2012
3.00
Instrument Panel Glareshield Cover/Top Skin
Details
       

 04-11-2012
0.50
Assisted with Tightening Bolts on Canopy Rod
Details
     

 04-11-2012
1.00
Assisted with Riveting Top Skin
Details
     

 04-10-2012
2.00
Painted Instrument Top Skin/In Place on Fuselage
Details
       

 04-10-2012
2.00
Bolted Windshield Center Support Rod
Details
       

 04-09-2012
1.00
Removed Center Windshield Support Bar
Details
     

 02-22-2012
1.00
Photo-Wire Labeling/Jacks Wiring on Right Side
Details
       

 08-04-2011
1.00
Brake Hoses/Elastic Grommet-Wires/Oil Door Cable
Details
       

 07-18-2011
0.50
Installed Cotter Pin on Left Rudder Pedal
Details
       

 07-10-2011
1.00
Rerouted Oil Cooler Door Cable
Details
       

 05-24-2011
0.50
Fuel Pump Wire Connected to Fuel Pump
Details
     

 02-03-2011
1.00
Riveted the Last Few Rivets-Firewall to Fuselage
Details
       

 11-17-2010
3.00
Riveted Instrument Panel Brackets/Firewall Holes
Details
       

 11-03-2010
0.10
Photo-Forward Top Skin Ready for Drilling
     

 11-02-2010
1.50
Drilled Top Skin Center to #30/Throttle/Mixture Ca
Details
       

 09-26-2010
1.50
Riveted Skin to Fuselage/Canopy Pieces to Walt
Details
       

 09-25-2010
1.50
Removed False Wood Spar
Details
       

 09-25-2010
1.50
Assisted Gary with Removing the False Spar
Details

 04-01-2010
3.00
Installed the Rod for the Canopy Rail
Details
       

 03-07-2010
3.50
Installed Elevator Bellcrank Hardware
Details
       

 03-05-2010
7.00
Riveted Aft Forward Top Skin to Fuselage
Details
       

 03-05-2010
0.10
Photos-Riveting the Aft Top Skin
       

 03-05-2010
0.10
Photos 2-Riveting the Aft Top Skin
Details
       

 03-05-2010
3.50
Assisted with Riveting the Top Skin
Details
       

 03-04-2010
3.00
Made Spacers
Details
       

 03-03-2010
0.10
Clecoed Aft Top Skin in Place
Details
       

 02-25-2010
5.00
Flap System and AOA Switch Wiring
Details
       

 02-24-2010
0.10
Photos-Flap and AOA Wiring
       

 02-24-2010
0.10
Photos 2-FPS and AOA Wiring
       

 02-23-2010
0.30
Rotation of Static Tube T-connector
Details
       

 02-23-2010
5.00
Chg Smoke Reservoir Orientation/Chg Static Tube
Details
       

 02-22-2010
0.10
Photos-Pitch Servo & MB Wiring/Blue Tubes
       

 02-16-2010
2.00
Visitor-MB Wiring/BNC Connector-EDC 10A Wiring
Details
       

 02-16-2010
0.30
Smoke System Tubing Routing-Photos-MB Wire
Details
       

 02-15-2010
3.00
Nutplates for Wiring Tubes
Details
       

 01-26-2010
0.10
Suggested Rotating Smoke Tank/Photos-Cabin Heat
Details
       

 12-30-2009
1.00
Made Fuel Line Tube-Pump to Gascolator
Details
     

 12-18-2009
0.10
Photos-MB Antenna
       

 12-15-2009
0.50
ELT Wiring
Details
       

 12-10-2009
0.10
Photos-Adel Clamps/ELT Antenna Routing
       

 12-10-2009
3.00
Installed Modified T/W Steering Arm/Adel Clamps
Details
       

 12-09-2009
6.00
Center Cabin Cover Work/Cabin Heat Cable
Details
       

 12-09-2009
3.00
Cabin Heat Cable/Center Cabin Cover/ELT Antenna
Details
       

 12-08-2009
4.00
Worked on Center Cabin Cover
Details
       

 12-08-2009
0.10
Photos-Center Cabin Covers Diffusers Bent
       

 12-06-2009
3.00
Adel Clamps/ELT Position
Details
       

 12-04-2009
4.00
Changed Headset Jacks
Details
       

 12-03-2009
4.00
ELT New Position/New Flap Switch Inserted
Details
       

 12-02-2009
1.00
Shipped Spinner/ELT Bracket Base
Details
     

 11-25-2009
3.00
ELT Position/Riveted Brackets to Fwd Skin
Details
       

 10-20-2009
5.50
Primed Skin/Static Tubing Clip/Battery Bolts Space
Details
       

 10-19-2009
4.00
Final Trim-Aft Top Skin/Added Transducers
Details
       

 10-13-2009
0.10
Photos-F-6111 Pieces in Place
       

 10-13-2009
4.00
Drilled F-6111 Pieces/Trimmed Canopy Latch
Details
       

 10-09-2009
3.50
Glareshield Trimmed/Aft Top Skin Trimmed
Details
       

 10-09-2009
0.50
Assisted Gary
       

 10-08-2009
0.10
Inst Panel Brackets/Riveted Rmt Comp Brckt
Details
       

 10-08-2009
7.00
Drilled Inst Panel Brackets to Top Skin
Details
       

 10-07-2009
6.00
Tunnel Cover Mod/Inst Top Skin Work
Details
       

 10-01-2009
2.00
Fit Instrument Top Skin
Details

 09-30-2009
2.00
Tested Fuel Tanks-Found 1 Leak
Details

 09-30-2009
1.50
Assisted Gary-Checked Fuel Tanks

 09-29-2009
4.00
Trimmed Glareshield Edge/1st Chk of Fuel Tank
Details

 09-18-2009
4.50
Drilled Pilot Holes for Canopy Rail Bolts
Details
     

 09-17-2009
0.10
Photos-Aft Top Skin Trimmed
       

 09-17-2009
0.10
Photos 2-Aft Top Skin
     

 09-17-2009
3.50
More Trimming of the Aft Top Skin
Details
       

 09-14-2009
0.10
Trimmed Fwd Edge of Aft Top Skin
Details
       

 09-14-2009
4.00
Drilled #40 Holes along Side of Fwd Top Skin
Details
       

 09-11-2009
4.00
Vis-Instrument Top Skin Drilled/Dimpled
Details
       

 09-11-2009
0.10
Linseed Oil in Canopy Frame/Riveted Bracket
Details
       

 09-10-2009
0.10
Photos-Underside of Skin/Bracket/Wedge
       

 09-10-2009
0.10
Photos 2-Drilling the Instrument Top Skin
       

 09-10-2009
0.10
Photo 2-Top Skin Drilled to the Forward Fuselage
     

 09-10-2009
2.50
Instrument Top Skin Work
Details
       

 09-09-2009
0.10
Photos 3-Riveted the Subpanel Corners
       

 09-08-2009
0.10
Photos-Wedge inserted betw/Center Rib & Bracket
       

 09-08-2009
0.10
Photos 3-Wedge inserted betw/Center Rib & Bracket
     

 09-08-2009
0.10
Photos 2-Wedge inserted betw/Center Rib & Bracket
       

 09-08-2009
4.00
Inserted Wedge for Center Rib
Details
       

 09-06-2009
2.00
Started Trimming Aft Top Skin
Details
       

 08-27-2009
4.50
Dimpled Top Skin/Modified Pedal Bracket
Details
       

 08-12-2009
2.60
Gave Drawings to Conway/Canopy Tracks
Details

 08-05-2009
3.00
Drilled Fuel Pump Firewall Doubler
Details
       

 08-04-2009
2.00
Trimmed 1" off WD-643 Roll Bar Brace
Details
       

 08-04-2009
0.10
Photos-Doubler on Center Rib
       

 08-04-2009
0.10
Gap betw/Instrument Center Rib/Bracket
Details
       

 08-03-2009
2.00
Put Away OSH Purchases/Panel Offset Bracket
Details

 07-28-2009
0.30
Talked with Darryl-Van's re Offset Center Rib
Details

 07-21-2009
2.50
Trimmed Instrument Subpanel for Bracket
Details

 07-17-2009
2.50
Dimpled Instrument Panel Ribs/Subpanel
Details

 07-16-2009
1.00
Dimpled the F-6112 Skin/Drilled Brackets for Panel
Details
       

 07-15-2009
5.00
Canopy Spacers & Roll Bar/Fuselage Bracket
Details
       

 07-14-2009
1.00
Deburred F-6106 Top Skin/Installed Icom in Panel
Details

 07-13-2009
3.00
Back-drilled Fuselage Ribs to Top Skin
Details
       

 07-07-2009
2.50
Clamped F-6106 Top Skin to Fuselage
Details
       

 07-06-2009
3.00
Tested Battery/Worked on F-6106 Top Skin
Details
       

 07-05-2009
2.50
Worked on Forward Top Skin and Ribs
Details
       

 07-05-2009
0.30
Assisted with Cutting the Windshield
Details

 06-18-2009
3.00
Installed Fuel Line into Pump/Doubler on Rib
Details
       

 06-17-2009
3.00
Positioned Fuel Pump on Firewall/Static Line
Details
       

 06-16-2009
3.00
Reinstalled/Remade Fuel Tank Tubes
Details
       

 06-16-2009
0.10
Photos-Reinstalled/Remade Fuel Tank Tubes
       

 06-15-2009
0.10
Photos-Bonaco Brake Lines Routing Thru Bracket
     

 06-12-2009
3.00
Reinstalled Vent Tubings w/Adel Clamps
Details
       

 06-12-2009
0.10
Photos-Fuel Vent Tubing-Visitors-Merle and Sue
Details
       

 06-05-2009
0.10
Spacers Added to outside of Fuel Vent Tube on Fuse
Details
     

 06-05-2009
6.50
Right Fuel Vent Tube/Aux Fuel Pump Doubler
Details
       

 06-05-2009
0.10
Left Fuel Vent Tube Reworked/Adel Clamps Drilled
       

 06-04-2009
0.10
Started to make a new Fuel Vent Tube
Details
       

 06-04-2009
5.50
Snap Bushings for Rudder Cables
Details
       

 05-30-2009
0.50
Cut out the F-601Z Aux Fuel Pump Doubler
Details
     

 05-29-2009
0.10
Photos-Right Fuel Tube
     

 05-29-2009
6.50
Fuel Tube Bending/Strobe Power Supply Wire/Firewal
Details
       

 05-28-2009
4.00
Fuel Tube Bending
Details
       

 05-27-2009
4.00
Rearranged Rudder Cable Washers/Fuel Tubing
Details
       

 05-26-2009
5.00
Torqued Flap Actuator & Rudder Pedal Bolts
Details
       

 05-26-2009
0.10
Photos-Rudder Cables Attached to Pedals
       

 05-24-2009
0.10
Photos-Painted Interior/Riveted Baggage Floors
       

 05-24-2009
0.10
Photos 2-Painted Interior/Riveted Baggage Floor
       

 05-24-2009
4.00
Painted Fuselage Interior
Details
       

 05-23-2009
4.50
Painted Interior Pieces and Fuselage Interior
Details
       

 05-22-2009
0.10
Photos-Painted Interior Pieces
       

 05-22-2009
4.50
Painted Interior Pieces
Details
       

 05-21-2009
2.50
Primed and Painted Interior Pieces
Details

 05-20-2009
5.50
Started to Paint Fuselage Pieces
Details
       

 05-19-2009
2.00
Attached the Andair Fuel Selector in Position
Details
     

 05-18-2009
0.10
Photo-Nutplate installed on the Left Floor Panel
     

 05-18-2009
2.00
Installed Nutplates in Floor for Fuel Selector Cov
Details
       

 05-17-2009
0.10
Photos-Fuel Selector Cover/F-699 Brackets
       

 05-17-2009
4.50
Finished Assembling the Fuel Selector Cover/Primed
Details
       

 05-16-2009
0.10
Photos-Fuel Selector Cover Drilled to the Floor Pa
       

 05-16-2009
5.50
Drilled the Fuel Selector Cover to the Floor Panel
Details
       

 05-15-2009
0.10
Photos-Fuel Selector Cover Pieces
       

 05-15-2009
3.00
Cut out the Fuel Selector Cover Pieces
Details
       

 05-14-2009
3.00
Started Work on the Fuel Selector Cover Pieces
Details
     

 05-08-2009
2.00
Made Cardboard Box Simulating Fuel Sel. Cover
Details
       

 05-06-2009
2.00
Fuel Selector Cover Decisions/Floor Bracket
Details
       

 05-05-2009
1.50
Properly Installed Headset Jacks/Map Box Supports
Details
       

 05-04-2009
2.00
Map Box Support Brackets/Antenna Jacks
Details
       

 05-03-2009
3.50
Positioned Steel Straps to Pedals/Inst Subpanel Wo
Details
       

 05-02-2009
0.10
Photos-Rudder Cable/Pedal Attach Straps
       

 05-02-2009
2.50
Enlarged Control Stick Openings/Rudder Cable Strap
Details
       

 04-29-2009
4.00
Checked the Range of Movement of Stick/Elevators
Details

 04-28-2009
0.10
Photos-Riveted NACA Vents
       

 04-28-2009
0.10
Photos 2-Riveted NACA Vents
     

 04-28-2009
3.00
Finished work on Control Rod/Riveted NACA Vents
Details
       

 04-27-2009
1.50
Primed Floor Panels/Control Rod F-689 Work
Details
       

 04-24-2009
1.00
Tapered Floor Panel/Stopped @ Hobby Hangar
Details

 04-23-2009
1.00
Modified the Right Floor Panel
Details
     

 04-22-2009
6.50
Almost Completed Working the New Floor Panel
Details
       

 04-21-2009
5.50
Drilled Screw Holes in New Right Floor Panel
Details
       

 04-20-2009
2.50
Finished Working on the New Left Floor Panel
Details
       

 04-18-2009
6.50
Continued Working on the Left Floor Panel
Details
       

 04-17-2009
3.50
Started Locating/Drilling Screw Holes in Left Floo
Details
       

 04-16-2009
5.00
Started Working on Replacement Floor Panels
Details
       

 04-15-2009
3.00
Started work on Floor Pans/Drilled out Nutplates
Details
       

 04-07-2009
0.10
Photos-Top Skin/Forward Canopy Pieces
       

 04-07-2009
0.10
Photos-Instrument Panel Angle-Top Skin Marked
       

 04-07-2009
4.00
Instrument Panel needs to be set at 8 degrees
Details
       

 04-06-2009
1.00
Cleaned edges of top skin/photos of Dynon D100
Details
       

 04-01-2009
0.10
Photos-Rudder attached to VS and Cables Attached
       

 04-01-2009
0.10
Photos-Aileron Trim Bracket
       

 04-01-2009
0.10
Photos 2-Aileron Trim Bracket in position
       

 04-01-2009
6.00
Completed the Aileron Trim Bracket
Details
       

 03-31-2009
5.00
Aileron Trim Bracket/Inserted Instrument Panel
Details
       

 03-30-2009
0.80
Started work on the Aileron Trim Bracket
Details
     

 03-12-2009
0.10
Riveted Arm Rests to Fuselage
Details
       

 03-12-2009
0.10
Photos-Armrests Riveted/Rudder Pedal Bolt
       

 03-12-2009
3.50
Installed Springs on Brake Master Cylinders
Details
       

 03-11-2009
4.00
TruTrak SB Compliance/Rudder Pedal Bolts/Visitors
Details
       

 03-11-2009
0.10
Photos-Rudder Pedal Bolts
       

 03-11-2009
2.00
Cork and Aluminum Covers for Aileron Control Boots
Details
     

 03-09-2009
2.00
TruTrak SB Compliance/Rudder Pedal Bracket
Details
       

 03-04-2009
4.00
Rudder Pedal Correction/Reposition Comm Antenna
Details
       

 03-04-2009
0.10
Photos-Right Rudder Pedal Bracket Replaced
       

 03-03-2009
0.10
Photos-Left Fuel Vent Tubing/Fittings
       

 03-03-2009
0.10
Photos 4-Right Fuel Vent Tubing
       

 03-03-2009
0.10
Photos 3-Right Side Fuel Vent Tubing
       

 03-03-2009
0.10
Photos 2-Right Fuel Vent Tubing
       

 03-03-2009
5.50
Made Fuel Vent Tubing/Installed Fuel Vents
Details
       

 03-02-2009
0.10
Photos-Static Line Routing
       

 03-02-2009
0.10
Drilled Holes for Static Line Routing
Details
       

 02-25-2009
5.00
Tapped Roll Servo Control Rod/Wingtips
Details
       

 02-25-2009
0.50
Helped Tap the Roll Servo Control Rod
Details
     

 02-24-2009
2.00
Riveted Fuselage Floor/Elevator Bellcrank
Details
       

 02-24-2009
1.00
Brake Line Bushings
Details
     

 02-23-2009
2.50
Leading Edge of Elevator/Antenna/Roll Servo
Details
       

 02-23-2009
1.00
Assisted with Positioning the Roll Servo
Details

 02-22-2009
2.50
Decided to Move Comm #1 Bracket
Details

 02-22-2009
0.50
Assisted with Deciding to Move Comm 1 Bracket
Details

 02-20-2009
0.10
Photos-Bushing for OAT Wire/Shoulder Harness
Details
       

 02-20-2009
4.00
Bolted Shoulder Harness Cables/Enlarged Stick Hole
Details
       

 02-19-2009
0.10
Attempted to Work-Vertigo Kicked In
Details

 02-18-2009
3.50
Riveted the Left Side of the Aft Skin
Details
       

 02-18-2009
0.10
Photos-Bolted Shoulder Harnesses on Longeron
Details
       

 02-18-2009
1.50
Assisted Gary with Riveting Aft Top Skin
Details
       

 02-17-2009
8.00
Positioned Flap Cam & AOA Sensor/Rivet Top Skin
Details
       

 02-17-2009
2.00
Assisted with Riveting Aft Top Skin
Details
       

 02-17-2009
3.50
Assisted with Installing AOA Flap Sensor
Details
       

 02-16-2009
5.50
Riveted Most of the Remaining Rivets-Aft Top Skin
Details

 02-16-2009
2.00
Assisted with Riveting Aft Top Skin
Details

 02-11-2009
4.00
Started to Rivet Aft Top Skin to Fuselage
Details
       

 02-11-2009
2.00
Assisted with Riveting Aft Top Skin
Details
     

 02-10-2009
1.50
Worked on Aft Top Skins
Details
       

 02-10-2009
0.10
Photos-Priming Aft Top Skin & Rivet Lines on Fuse
       

 02-10-2009
0.10
Photos 2-Fuse Rivet Line for Top Skins Primed
       

 02-09-2009
0.10
Need to enlarge F-639/640 control stick holes
Details
       

 02-09-2009
4.00
Drilled Remote Compass Bracket
Details
       

 02-09-2009
0.10
Drilled Brake Reservoir Hole in FW/Primed Top Skin
Details
       

 02-08-2009
0.10
Rivet on HS interferring with Elevator movement
Details
       

 02-08-2009
0.10
Installed OAT in F-612 Bulkhead/C'wts in elevator
Details
       

 02-08-2009
7.00
Corrected interference of control rod by bulkheads
Details
       

 02-07-2009
5.00
Worked on the length of the F-690 Control Rod
Details
       

 02-07-2009
0.10
Photos-Trim Cable in place
       

 02-07-2009
0.10
Photos 4-Trim cable thru the aft bulkheads
       

 02-07-2009
0.10
Photos 3-Trim Cable run thru Fuselage
       

 02-07-2009
0.10
Photos 2-Trim Cable run thru Fuselage
       

 02-06-2009
4.50
Riveted Control Rod Bearings/Brake Plate Drilled
Details
       

 02-05-2009
0.10
Photos-Prepared Brake Plate for Firewall
       

 02-05-2009
3.00
Drilled NACA Vents into position/Brake plate drill
Details
       

 02-04-2009
3.00
Finished Shaping the Right NACA Vent
Details
     

 02-02-2009
0.10
Photos-Right NACA Vent work
       

 02-02-2009
2.50
Cut out Left NACA Vent and started Right Vent
Details
       

 02-01-2009
0.10
Photos-Rudder Pedal Bracket Bolts Drilled in Place
       

 02-01-2009
3.00
Installed Bolts in Rudder Pedal Brackets
Details
       

 01-31-2009
3.00
Drilled Rudder Pedal Brackets in Place
Details
       

 01-30-2009
2.00
Riveted VS Forward Spar Spacers/Set Rudder Pedals
Details
       

 01-29-2009
4.00
Riveted Tubing Nutplates/F-611 Spacer/Installed El
Details
       

 01-29-2009
0.10
Photos-Control Sticks/Primed parts/F-690 Control R
       

 01-29-2009
0.10
Photos 3-HS and Elevators in place/Control Rod & E
       

 01-29-2009
0.10
Photos 2-F-611 Spacer/Elevator Bellcrank/HS
       

 01-27-2009
0.10
Photos-Changed tubing for wire runs in fuselage
     

 01-27-2009
4.00
Changed tubing in floor for wire runs
Details
       

 01-26-2009
2.00
Decided to Change Tubing under Seats/Floor
Details

 01-25-2009
1.50


 12-15-2008
3.50
Photos-Assisted Gary with HS and VS
Details
       

 12-15-2008
5.00
Made Remote Compass Bracket/HS Spacers
Details
       

 12-15-2008
0.50
Assisted Gary with HS
Details

 12-13-2008
2.50
Riveted Aft Top Deck/Riveted Right Canopy Deck
Details
       

 12-12-2008
0.10
Photos-HS rear spar drilled to bolt size
       

 12-12-2008
0.10
Photos 6-F-612B spacer drilled in place
     

 12-12-2008
0.10
Photos 5-F-612B spacer drilled in place
       

 12-12-2008
0.10
Photos 4-F-612B spacer drilled in place
       

 12-12-2008
0.10
Photos 3-Comparison of Cross-Bracket Replaced
       

 12-12-2008
0.10
Photos 2-HS Forward Spar Drilled in place
       

 12-12-2008
5.50
Made F-612B Spacer/Drilled in place
Details
       

 12-11-2008
0.10
Photos-Drilled HS to Longeron
       

 12-11-2008
0.10
Photos 2-Drilled HS To Longeron
     

 12-11-2008
4.00
Drilled HS to Longeron
Details
       

 12-10-2008
5.00
Drilled Aft Top Deck Off/Replaced Cross-Bracket
Details
       

 12-10-2008
4.00
Drilled Aft Top Deck Off/Replaced Cross-Bracket
Details
     

 12-09-2008
2.50
Cut Push-Pull Tube/Riveted Nut to Trim Access Pane
Details
       

 12-08-2008
5.00
Cut Elevator Control Rod/Wood Legs
Details
       

 11-19-2008
1.00
Worked on Remote Compass Bracket
Details
     

 11-19-2008
2.00
Complied w/Van SB 4/11/07-Flap Motor Safetying
Details

 11-18-2008
1.00
Worked on Right Canopy Deck
Details

 11-06-2008
4.00
Trimmed Right Canopy Deck
Details
       

 11-06-2008
1.50
Making Remote Compass Bracket
Details
     

 11-05-2008
5.50
Safetied/Riveted Pitch Servo
Details
       

 11-05-2008
1.50
Riveted One End of Control Rod F-690
Details
     

 11-05-2008
0.10
Photos-Pitch Servo Bracket
       

 11-05-2008
0.10
Photos 4-Trimmed Aft End of Right Canopy Deck Rail
       

 11-05-2008
0.10
Photos 3-Pitch Servo
       

 11-05-2008
0.10
Photos 2-Pitch Servo Bracket
       

 11-04-2008
0.10
Photos-Pitch Servo Bracket
       

 11-04-2008
0.10
Photos 2-
       

 11-04-2008
3.00
Drilled Pitch Servo Bracket/Moved Elevator Bellcra
Details
       

 11-03-2008
0.10
Photos-Smoke System Vent
       

 11-03-2008
0.10
Photos 4-Smoke System Nutplates in Ribs
       

 11-03-2008
0.10
Photos 3-Smoke System
       

 11-03-2008
0.10
Photos 2-Smoke System Vent Riveted in Place
       

 11-03-2008
5.00
Installed Components for Smoke Reservoir Installat
Details
       

 11-02-2008
1.50
Trimmed Baggage Side Panels for Flap Rod
Details
       

 11-02-2008
0.10
Photos-Smoke Reservoir Installation
       

 11-02-2008
0.10
Photos 2-Smoke Reservoir Installation
       

 10-31-2008
3.00
Baggage Side Covers Cut Out for Flap Actuator
Details
       

 10-28-2008
1.50
Riveted Antenna Brackets in Place
Details
     

 10-28-2008
1.50
Dimpled and Riveted Antenna Brackets in Place
Details
       

 10-27-2008
3.00
Primed Fuselage/Riveted Rudder Cable Fairings
Details
       

 10-27-2008
0.10
Photos-Rudder Cable Fairings Riveted to Fuselage
       

 10-24-2008
0.10
Photos-Static Line Holes Drilled
       

 10-24-2008
0.10
Photos-Control Rod Interference w/Rod End Bearing
       

 10-24-2008
0.10
Photos-Conduit in Fuselage/ELT Placement
       

 10-24-2008
3.00
Cleaned Fuselage/Drilled Fuselage for Conduit
Details
       

 10-23-2008
4.00
MB Bracket Drilled into Fuselage
Details
       

 10-22-2008
0.10
Photos-Made Antenna Brackets
       

 10-22-2008
0.10
Photos 2-Made Antenna Brackets
       

 10-22-2008
0.10
Photos 1-Made Antenna Brackets
       

 10-22-2008
3.70
Made Antenna Brackets
Details
       

 10-21-2008
0.10
Photos-Made Comm Antenna Brackets
       

 10-21-2008
2.00
Made Comm Antenna Brackets
Details
       

 10-16-2008
3.00
Drilled Power Supply Brackets to Floor
Details
       

 10-16-2008
1.50
Dimpled Floor Skin/Cut out Antenna Doublers
Details
     

 10-15-2008
0.10
Photos-Strobe Power Supply Brackets
       

 10-15-2008
4.00
Made Brackets for Strobe Power Supply
Details
       

 10-14-2008
2.50
Trimmed/Drilled Left Flap Cover
Details
       

 10-09-2008
3.50
Trimmed/Drilled Right Flap Cover in Place
Details
       

 10-09-2008
0.10
Photos-Flap Covers Trimmed/Drilled in Place
       

 10-09-2008
0.10
Photos 2- Flap Covers Trimmed/Drilled in Place
     

 10-08-2008
0.10
Photos-Center Bearing Block/Flap Cover
       

 10-08-2008
0.10
Photo-Cockpit Floors in Place with Flap Channels
     

 10-08-2008
3.50
Doublers for Flap Bearing Blocks/Flap Covers
Details
       

 10-07-2008
1.00
Prepped Top Skin for Priming
Details

 10-07-2008
0.10
Photos-Flap Bearing Blocks in Place
       

 10-07-2008
0.10
Photos-Flap Bearing Blocks
Details
       

 10-07-2008
5.00
Drilled Bearing Blocks to Proper Size Holes
Details
       

 10-02-2008
0.10
Photos-Flap Actuator Bearing Blocks Drilled in Pla
       

 10-02-2008
4.00
Installed Nutplates on EF-601 Channel
Details
       

 10-01-2008
3.50
Trimmed Flap Side Covers/Static Line
Details
       

 10-01-2008
0.10
Photos-Static Line Affixed to Bulkhead
       

 09-27-2008
3.00
Static Lines/Control Sticks/Rudder Cable Fuse Cove
Details
       

 09-27-2008
0.10
Photos-Rudder Cable Fairings/Static Line
       

 09-26-2008
3.00
Riveted Nutplates/Rivet CS/Rib Brackets to Ribs
Details
       

 09-26-2008
0.10
Photos-Brackets Riveted in Place
       

 09-26-2008
0.10
Photos 2-Brackets Riveted in Place/Visiting Cat
       

 09-25-2008
3.50
Primed/Riveted Crotch Strap Components
Details
       

 09-25-2008
0.10
Photos-Primed Cutouts in Floors
       

 09-25-2008
0.10
Photos 2-Primed Flap Cover Side Panels
     

 09-24-2008
0.10
Photos-Finished Crotch Strap Brackets/Hole in Floo
       

 09-24-2008
0.10
Photos 4-Finished Brackets/Hole in Floor
       

 09-24-2008
0.10
Photos 3-Finished Brackets/Hole in Floor
       

 09-24-2008
0.10
Photos 2-Finished Brackets/Hole in Floor
       

 09-24-2008
6.00
Finished Crotch Strap Brackets/Hole in Floor
Details
       

 09-23-2008
2.00
Drilled Right Crotch Strap Brackets in Place
Details
       

 09-22-2008
1.00
Drilled Right Crotch Strap Brackets to Ribs
Details
     

 09-17-2008
0.10
Photos-Enlarged Cutout for Crotch Strap
       

 09-17-2008
0.10
Photos 2-Enlarged Crotch Strap Hole in Floor
       

 09-17-2008
2.00
Enlarged Cutout in Floor for Left Crotch Strap
Details
       

 09-16-2008
4.00
Worked on Left Crotch Strap Brackets
Details
       

 09-16-2008
0.10
Installed Left Crotch Strap
       

 09-15-2008
0.10
Left Rib Bracket and Crotch Strap Brackets Drilled
Details
       

 09-15-2008
3.00
Drilled Left Crotch Strap Brackets in Place
Details
       

 09-14-2008
4.00
Modified Crotch Strap Brackets/Met w/Walt Hallaron
Details
       

 09-14-2008
0.10
Left Crotch Strap Brackets Ready for Drilling
     

 09-13-2008
0.10
Modified Crotch Strap Brackets
     

 09-13-2008
2.00
Cleaned up Bending Brake
Details
       

 09-12-2008
2.00
Cleaned up Fuselage
Details

 09-11-2008
4.00
Started to Make New Crotch Strap Brackets
Details
       

 09-11-2008
0.10
Photos-Started to Make New Crotch Strap Brackets
     

 09-10-2008
7.00
Worked on modifying Crotch Strap Brackets
Details

 09-10-2008
2.00
Assisted Gary
Details

 09-09-2008
4.00
Trimmed seat ribs/floor for stick movement
Details
       

 09-09-2008
0.10
Photos-Control Sticks with Floor Cutouts
       

 09-09-2008
2.00
Measured Cutouts in Floor for Stick Cutouts
Details
       

 09-08-2008
1.00
Installed Control Stick/Trimmed Seat Ribs
Details
       

 09-05-2008
4.00
Cleaned Shop/Installed Floors and Seats
Details

 09-04-2008
0.10
Primed Floors and Armrest Components
Details
     

 09-04-2008
5.00
Primed and Riveted Armrests
Details
       

 09-04-2008
0.10
Photos 5-Riveting Armrests with Seat Cushions
       

 09-04-2008
0.10
Photos 4-Riveting Armrests
       

 09-04-2008
0.10
Photos 3-Armrests Riveted Together
       

 09-04-2008
0.10
Photos 2-Riveting Armrests
       

 08-27-2008
0.10
Riveted Static Ports to Fuselage
Details
       

 08-27-2008
0.10
Photos-Riveted Static Ports
       

 08-26-2008
0.10
Photos-Static Ports Clecoed in Position
       

 08-26-2008
0.10
Photos 2-Right Static Port Clecoed in Place
       

 08-26-2008
2.00
Drilled Static Ports in Fuselage
Details
       

 08-25-2008
0.10
Photos-Removeable Seat Rib w/Nutplate
Details
       

 08-25-2008
3.50
Control Sticks Drilled/Static Ports/Seat Rib
Details
       

 08-21-2008
1.50
Trimmed Control Stick Openings/Removed Seat Rib
Details
       

 08-20-2008
0.10
Photo-Rib and Spar Coutout for Right Control Stick
     

 08-20-2008
2.50
Modified Seat Ribs and Spar Flanges for Control St
Details
       

 08-19-2008
0.10
Photos-Control Tube and Elevator Bellcrank
       

 08-19-2008
0.10
Photos 2-Control Tube and Elevator Bellcrank
       

 08-19-2008
1.50
Elevator Control Tube Off-Center from Bellcrank
Details
       

 08-12-2008
2.00
Cut Spacers for Pitch Servo/Dimpled Fuselage Bulkh
Details

 08-07-2008
5.00
Trimmed Top Skins/Dimpled Skins and Stringers
Details
       

 08-07-2008
0.10
Photos-Trimmed Top Skins/Dimpled Skins and Stringe
       

 08-07-2008
0.10
Photos 3-Trimmed Top Skins/Dimpled Skins and Strin
       

 08-07-2008
0.10
Photos 2-Trimmed Top Skins/Dimpled Skins and Strin
       

 08-07-2008
0.10
Dimple Die Rounded Off
Details
       

 08-06-2008
3.50
Trimmed Top Skins
Details
       

 08-05-2008
1.50
Powered up Instrument Pane 1st Time/Trimmed Top Sk
Details
     

 07-15-2008
0.10
Photos-Marked Left Side of Top Skins for Trimming
Details
       

 07-10-2008
2.50
Rounded out Top Skin Bulkhead Flanges
Details
       

 07-10-2008
1.00
Marked Right Side of Top Skins for Trimming
Details
       

 07-07-2008
3.00
Trimmed Aft Top Skin
Details
       

 07-03-2008
0.10
Photo-Deburred Top Skins
     

 07-03-2008
3.00
Deburred Top Skins/Cleaned up Fuselage
Details
       

 07-02-2008
0.10
Photo-Drilling Forward Top Skin
     

 07-02-2008
4.00
Finished Drilling Top Skin
Details
       

 07-02-2008
4.00
Drilled Top Skin
Details
       

 07-02-2008
1.00
Assisted with Drilling Top Skin
Details
       

 06-28-2008
2.00
Sat in Cockpit/Drilled Forward Top Skin
Details
       

 06-28-2008
2.50
Sat in Cockpit
Details
       

 06-28-2008
0.10
Photos-Seats in Place
       

 06-28-2008
0.10
Drilled Forward Top Skin
Details
       

 06-27-2008
4.50
Worked on Setup for Drilling Forward Skin
Details
       

 06-27-2008
4.00
Drilled Rib and Stringers to Aft Forward Top Skin
Details
       

 06-26-2008
4.50
Drilled Stringers/Ribs to Aft Forward Skin
Details
       

 06-26-2008
3.00
Drilled Stringers/Ribs to Aft Forward Skin
Details
       

 06-24-2008
3.50
Drilled Pilot Holes in Stringers for Aft Forward S
Details
       

 06-24-2008
3.50
Cleaned up Fuselage/Pilot Holes in Stringers
Details
       

 06-23-2008
0.10
Photos-Drilled Aft Top Skin to Bulkheads/Stringers
       

 06-23-2008
0.10
Photos #3-Aft Top Skin to Bulkheads/Stringers
       

 06-23-2008
0.10
Photos #2-Aft Top Skin to Bulkheads/Stringers
       

 06-23-2008
5.50
Drilled Aft Top Skin to Bulkheads and Stringers
Details
       

 06-23-2008
3.00
Drilled Aft Top Skin to Bulkheads and Stringers
Details
       

 06-20-2008
6.00
Readied Bulkheads F-607/-608, Stringers for Drilli
Details
       

 06-20-2008
3.00
Readied Bulkheads F-607/-608, Stringers for Drilli
Details
       

 06-20-2008
0.10
Photos-Readying Aft Top Skin for Drilling
       

 06-20-2008
0.10
Photos-Readying Aft Top Skin for Drilling
       

 06-20-2008
0.10
Photos-Readying Aft Top Skin for Drilling
       

 06-19-2008
3.50
Riveted Nutplates to Floor Ribs on Right Side
Details
       

 06-19-2008
3.50
Drew Centerline on F-6112 Top Skin/Fluted F-608 Bu
Details

 06-13-2008
5.00
Drilled Right Front Floor Panel to Ribs
Details
     

 06-13-2008
3.00
Drew Centerlines on Fuselage Bulkheads/Stringers
Details
       

 06-12-2008
1.50
Prepared Aft Top Skin/Floor Panels
Details
       

 06-12-2008
4.00
Nutplates for Left Forward Floor/Trimmed Right Fwd
Details
       

 06-11-2008
1.50
Left Armrest/Left Forward Floor Panel
Details
       

 06-11-2008
5.50
Dimpled Armrests/Drilled Left Forward Floor Panel
Details
       

 06-10-2008
0.10
Photos-Left Armrest and Visitors: Tom/Corbin
Details
       

 06-10-2008
5.00
Drilled Left Armrest to Fuselage and Dimpled
Details
       

 06-09-2008
0.10
Photos-Armrest Reinforcements
Details
       

 06-09-2008
0.10
Photos-Armrest Reinforcements
Details
     

 06-09-2008
2.50
Armrest Reinforcement Angles
Details
       

 06-02-2008
0.50
Cut Short Angle Bracket for Armrest
Details

 06-01-2008
3.00
Shaped Left Armrest
Details
     

 06-01-2008
1.50
Cut Brackets for Underside of Armrests
Details
     

 05-30-2008
3.00
Cut out Armrest from Stock/Engine Stand Components
Details
       

 05-29-2008
3.50
Trimmed Right Corner of Right Forward Seat Floor
Details
       

 05-29-2008
0.10
Attempt at Fitting Right Crotch Strap Bracket
Details
       

 05-28-2008
0.10
Trimmed Left Forward Seat Floor-Photo
     

 05-28-2008
4.00
Trimmed Left Forward Seat Floor
Details
       

 05-28-2008
0.10
Dropped of Flap Actuator for Bob Sprang to Rebend
Details

 05-24-2008
1.50
Drilled out Armrest/Fitted VA-114 in Place
Details
     

 05-24-2008
3.00
Bent Flap Rod/Armrest/Fwd Left Seat
Details
       

 05-23-2008
3.50
Riveted Back Stop Brackets/Flap Rod Bent
Details
       

 05-22-2008
3.00
Riveted Seat Back Components Together
Details

 05-21-2008
3.50
Drilled Back Stop Brackets in Place/Primed Parts
Details
       

 05-20-2008
4.00
Made More Components for Seat Back Brace Stops
Details
       

 05-19-2008
3.50
Made Seat Back Brace Stop Components
Details
       

 05-15-2008
0.10
Photos-Drilled Seat Back Components-2
       

 05-15-2008
0.10
Photos-Drilled Seat Back Components-1
       

 05-15-2008
4.00
Drilled Seat Back Components
Details
       

 05-14-2008
0.10
Riveted Flap Motor Brackets
Details
       

 05-14-2008
6.50
Riveted Electric Flap Components Together
Details
       

 05-14-2008
0.10
Drilled Seat Brackets
Details
       

 05-13-2008
2.50
Ordered Smoke System/Riveted Seat Hinges to Seat F
Details
       

 05-09-2008
4.00
Cleaned and Primed More Flap and Seat Components
Details
       

 05-07-2008
0.10
Widened Seat Belt Openings in Seat Floors
Details
       

 05-07-2008
4.00
Cleaned and Primed Flap and Seat Components
Details
       

 05-06-2008
0.10
Photos-Front Side of F-605's for Flap Bushing Bloc
       

 05-06-2008
0.10
Photo-Drilled EF-606 Bracket
     

 05-06-2008
5.00
Drilled EF-606 Bracket
Details
       

 05-06-2008
0.10
Checked Flap Bushing Block Positioning
Details
       

 05-05-2008
2.50
Drilled Electric Flap Motor Brackets
Details
     

 05-01-2008
1.50
Riveted Nutplates on Seat Interior Ribs
Details
       

 05-01-2008
0.10
Photos-Dimpled Holes Flattened Out
       

 04-30-2008
2.00
Installed Nutplates in Seat Interior Ribs
Details
       

 04-29-2008
1.00
Finished Drilling Aft Seat Floors to Ribs
Details

 04-28-2008
0.10
Photos-EF-601 Clecoed to Floor/Flap Actuator Posit
Details
       

 04-28-2008
0.10
Photo-Flap Motor next to EF-606 Bracket
Details
       

 04-28-2008
3.50
Drilled EF-603 to EF-601/Floor/F-605C
Details
       

 04-25-2008
1.00
Trimmed Top of EF-601
Details
       

 04-24-2008
1.50
Template for Left Flap Brace Cover
Details
       

 04-23-2008
0.10
Photos-Flap Actuator in Place
Details
       

 04-23-2008
0.10
Photos-F-661EF Bushing Blocks in Place
Details
       

 04-23-2008
4.50
Made Flap Actuator Brackets
Details
       

 04-22-2008
0.10
Photos-Flap Brace and Nutplates
Details
       

 04-22-2008
4.00
Drilled Aft Flap Brace/Installed Baggage Center Co
Details
       

 04-21-2008
5.50
Drilled Seat Hinges to Floor/Drilled Flap Bushing
Details
       

 04-18-2008
0.30
Conversation w/John-Smoking Airplanes.com
Details
     

 04-17-2008
1.00
Drilled Pilot Holes in Seat Floor Hinges
Details
       

 04-16-2008
0.10
Redrilled Inboard Ribs for F-648 Plate-Photos
       

 04-16-2008
3.50
Redrilled Inboard Ribs for F-648 Plate
Details
       

 04-15-2008
0.10
Drilled F-642 Right Seat Floor to Ribs-Photos
Details
       

 04-15-2008
4.70
Drilled F-642 Right Seat Floor to Ribs
Details
       

 04-14-2008
2.00
Trimmed F-642 Right Seat
Details
       

 04-08-2008
3.50
Drilled F-642 Left Seat Floor to Ribs
Details
       

 04-07-2008
3.50
Finished Trimming F-642 Left Floor
Details
       

 04-02-2008
3.50
Trimmed F-642 Left Seat Floor
Details
       

 04-01-2008
3.50
Riveted Nutplates at Aft Baggage Flange
Details
       

 03-27-2008
4.00
Cut out Cardboard Pattern for Seat Floor/Flap Brac
Details
       

 03-26-2008
3.00
Installed Nutplates in Baggage Ribs
Details
       

 03-25-2008
1.00
Drilled F-648 Baggage Center Plate
Details
       

 03-25-2008
0.10
Aft Baggage Floor/Misaligned Hole in Baggage Bulkh
Details
       

 03-24-2008
2.50
Installed Baggage Center Plate/Rotary Buckle Repla
Details
     

 03-20-2008
2.50
Reamed Out Holes in Baggage Floor
Details
     

 03-19-2008
0.10
Swapped Roll Servo for Pitch Servo-Photos
       

 03-19-2008
2.50
Swapped Roll Servo for Pitch Servo
Details
       

 03-18-2008
5.50
Route Rudder Cable/Cut Hole in Left Side of Fusela
Details
       

 03-17-2008
0.10
TruTrak Pitch Servo/Rudder Cables Installed-Photos
       

 03-17-2008
0.10
TruTrak Pitch Servo/Rudder Cables Installed-Photos
       

 03-17-2008
5.30
TruTrak Pitch Servo/Rudder Cables Installed
Details
       

 03-17-2008
0.10
Rudder Cables Installed-Photos
       

 03-14-2008
1.00
Positioned Pitch Servo and Bracket
Details
       

 03-13-2008
3.50
Inserted AN3-56 Bolts in Right Rudder Pedals
Details
       

 03-12-2008
4.50
Drill Left Side of Pedals to Master Brake Cylinder
Details
       

 03-11-2008
2.00
Colored Blueprint Drawings
Details
       

 03-06-2008
0.10
Rudder Pedal Assemblies-Photos
Details
       

 03-06-2008
3.50
Rudder Pedal Assemblies
Details
       

 03-04-2008
4.00
Drilled Pedal Bearing Blocks/Positioned Rudder Tor
Details
       

 03-03-2008
3.50
Corrected Rivets on Rudder Pedals/Bolted Pedals to
Details
       

 03-02-2008
3.50
Riveted Rudder Pedal Components Together
Details
       

 03-01-2008
6.00
Finished Rotating Fuselage Stand/Primed Rudder Ped
Details
       

 02-28-2008
1.00
Drilled Holes in Rotating Fuselage Bracket
Details
       

 02-24-2008
2.00
Set up Rotating Engine Stand
Details
       

 02-23-2008
2.50
Made Fuselage Rotating Stand Brackets
Details

 02-23-2008
1.50
Drilled Brackets to Rudder Pedals
Details

 02-22-2008
2.50
Made Rudder Pedal Brackets
Details

 02-20-2008
3.00
Work on Rudder Pedals
Details

 01-07-2008
0.50
Filed Edges of Bulkhead F-610
Details

 12-19-2007
0.50
Lightening Hole in Bulkhead F-610
Details

 12-19-2007
2.00
Drilled Bolt Holes in Rudder Brace/Lightening Hole
Details

 12-13-2007
2.50
Modifying Crotch Straps Attach Brackets
Details

 12-11-2007
0.50
Smooth Edges of Crotch Strap Attach Brackets
Details

 12-06-2007
3.00
Lighening Holes in Seat Back Braces/Seat Cushions
Details
       

 12-04-2007
0.10
Photo-Baggage Floor Panels after Tack Rivets Remov
     

 12-04-2007
3.00
Drilled out Tack Rivets in Baggage Area/Cleaned up
Details
       

 12-03-2007
2.50
Worked on Fuselage Bulkhead F-609/Drilled Hole in
Details
       

 11-30-2007
0.10
Fuselage Hole that Needs to be Drilled out/Dimpled
Details
       

 11-30-2007
3.00
Drilled Shoulder Harness Anchors/Worked on Fuselag
Details
       

 11-29-2007
3.00
Primed/Riveted Elevator Bellcrank
Details
       

 11-29-2007
0.10
Photos-Primed/Riveted Elevator Bellcrank
     

 11-27-2007
3.00
Started Work on Elevator Bellcrank
Details
     

 11-07-2007
4.00
Riveted Control Mount Brackets to Main Spar
Details
       

 11-07-2007
0.10
Photos-Filed Seat Ribs for Control Stick Clearance
       

 11-07-2007
0.10
Photos-Filed Seat Ribs for Control Movement/Forwar
       

 11-07-2007
0.10
Photo-Right Seat Pan with Excess Cutout
Details
     

 11-06-2007
3.00
Control Stick Assembly Connected in Fuselage/Drill
Details
       

 11-02-2007
3.00
Took Wood Spar out of Fuselage
Details
       

 11-01-2007
2.00
Control Stick Assembly in Fuselage/Hung Canopy in
Details
       

 10-30-2007
2.00
Control Stick Assembly
Details
       

 10-29-2007
1.00
Organized Drawings
Details

 10-14-2007
1.00
Swept Out Fuselage
Details
       

 12-01-2003
2.00
Hardware in Bins/ Access Opening
Details

 11-29-2003
1.00
Hardware into Storage Bins
Details

 11-24-2003
4.00
Fuselage Frame/Inventory Kit
Details
       

 11-23-2003
1.00
Clean up QB Crate
Details

 11-23-2003
1.00
Clean up QB Crate
Details

 11-23-2003
1.00
Clean up QB Crate
Details

 11-23-2003
1.00
Clean up QB Crate
Details

 11-21-2003
1.50
Clean up QB Crate
Details

 11-20-2003
1.50
Clean up QB Crate
Details

 11-19-2003
2.00
Picked up Fuselage QB Kit
Details
       

 11-19-2003
4.00
Picked up Fuselage QB Kit
Details
       

 11-19-2003
4.00
P/U Fuselage QB Kit
Details
       

 11-10-2003
0.00
Fuselage QB Kit Shipped
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.