KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  3-24-2011
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Cleaned and Taped Canopy

I wiped off the aft fairing with xxx and wiped off the canopy with mineral spirits. I also wiped down the inside of the canopy. I applied electrical tape on the canopy next to the front edge of the fairing and then painter's tape to cover up all of the exposed areas of the canopy.
' style=

The canopy all taped off

The canopy all taped off

' style=

The taped canopy

The taped canopy

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.