Drilled 2nd hole thru tie-down bar, spar and flange strips. Deburred all holes. Clamped bar together w/adjoining angle and drilled #12 hole thru angle w/bar as guide. Deburred all holes. Drilled heads off of 10 rivets on left spar for angles. Drilled out a few rivets.