KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  5-28-1998
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Spars

Clamped angles into place and drilled #30 holes through pilot holes and spar. Then drilled #12 holes thru spar and flange strips and angles. Drilled holes through all 5 angles. Positioned and clamped tie-down bar in place. Measured location of bar end on spar flange. Drilled one #12 hole thru spar, using bar as guide.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.