KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  6-11-1998
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Spars

Drilled out remainder of the 10 rivets out of left spar. Clamped angles into place & drilled #30 holes through pilot holes and spar. Then drilled #12 holes thru spar and flange strips and angles. Drilled holes through all 5 angles. Positioned and clamped tie-down bar in place. Drilled #12 holes through spar and flange strips for bar. Clamped bar together w/adjoining angle and drilled #12 hole thru angle w/bar as guide. Deburred all holes.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.