KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  12-20-2013
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Nav/Tail Light Wiring and Fuselage Overhangs

I cut off two lengths of 18 ga wires for the wingtip nav and tail lights. The wires were pushed thru the black split tubing with the strobe wire. I was able to push the 18 ga wire thru up to the last six inches of the tubing where a tie wrap was tied around it.

The fuselage overhangs on the underside of the wings were screwed to the wings.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.