Brief Description: Empennage Fairing Drilled/Clecoed in place
The empennage/fuselage fairing was pushed tight against the front of the vertical stab and then drilled and clecoed to the fuselage. Pilot holes were drilled on both sides of the aft end of the VS and the HS. The hole finder was used to drill the fairing. The fairing was clecoed in place. I marked areas of the fairing that will need to be cut out. I plan to lay more glass in place and build a wrap-around extension fairing on the underside of the HS.
The empennage/fuselage fairing
The right side of the fairing
The left front flange that will be cut off and replaced with a better fit