Brief Description: Riveted HS and Elevator Fairings in Place
The HS and elevator fairings had their holes all countersunk with the Perma-Grit tool. The left elevator was removed from the HS and the fairing was clecoed on the top side. The bottom side was drilled thru the elevator and the fairing. The holes were countersunk. The four fairings were then riveted in place with CS4-4 pull rivets.