KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  12-10-2008
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Drilled Aft Top Deck Off/Replaced Cross-Bracket

Dave Ross assisted Gary with drilling aft top deck off the fuselage and then replacing the cross-bracket.
' style=

Left side of the new cross-bracket

Left side of the new cross-bracket

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.