KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  12-10-2008
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Drilled Aft Top Deck Off/Replaced Cross-Bracket

Dave Ross came over and looked over the cross-bracket problem. We decided to replace the bracket. We drilled all of the rivets off the top deck and then drilled the cross-bracket off the bulkhead. I cut a new bracket out of stock from Bernie. I used the bandsaw to trim the initial angles of the ends and used the Scotchbrite wheel to round off the ends so they fit snugly into the radius of the longerons. The bracket was primed and then riveted to the bulkhead. Dave used the side of a drill bit to move the pilot hole previously drilled in the right longeron inboard.

Visitor-Joe Walker
' style=

Fuselage with aft top deck removed

Fuselage with aft top deck removed

' style=

Cross-bracket replaced

Cross-bracket replaced

' style=

New cross-bracket riveted in place

New cross-bracket riveted in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.