KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  12-11-2008
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Drilled HS to Longeron

I placed a 1/4" spacer under the HS rear spar and leveled and squared up the HS. I drilled the rear spar to the VS vertical brackets using the #30 bit. I drilled the bolt holes for attaching the HS to the aft top deck, longerons, and cross-bracket. I started by drilling pilot holes in the longerons and cross-bracket to ensure the holes were centered. I then positioned the HS in place and drilled matching holes in the spar. It was then a process of upsizing the holes and taking off/putting on the HS for drilling.
' style=

HS forward spar clamped to cross-bracket

HS forward spar clamped to cross-bracket

' style=

Left side-Partially-drilled HS to the longeron/cross-bracket

Left side-Partially-drilled HS to the longeron/cross-bracket

' style=

Right Side of the HS drilled to the longeron/cross-bracket

Right Side of the HS drilled to the longeron/cross-bracket

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.