Clive dropped by this evening for 1 hour to help bend and hold both the side skins in place while I back drilled the skins to the firewall and the bottom floor side skins, its my turn to do the same for Clive tomorrow night. After Clive left I finished adding the two angle brackets to the vertical crimped L angle and fitting the curved heel support side covers. Basically the fuse is ready to be disassembled, deburred, corrsion proofed and then re-assembled and riveted...
Left front side skin curved and back drilled to fuse