KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  6-10-2007
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Finished Right spat installation

Now besides tidying up the fibreglass and filling the joins and holes, I only have the nose wheel installation to go, that should be fun. I checked the clearance of the rear of both the spats to the garage floor, and the rear tie-down hook hits before the rear of the spats which is good to know. Because of the angle at which I took image 1, makes it look like the spat is about to drag on the ground. (Trust me, it's an optical illusion), check the previous log entry where I got onto the floor to take a shot of the left rear spat.
' style=

Right spat rear view

Right spat rear view

' style=

Front view, you can see here the bottom edge needs a little trimming to straiten it out

Front view, you can see here the bottom edge needs a little trimming to straiten it out

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.