KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  4-24-2010
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Fixed Pitot and installed fairings

Today I fixed the pitot by applying back pressure from inside the cocpit using a compressor to clear the lines and the Pitot head, problems solved, more mud expelled and I now have accurate airpseed indications atain.

Installing the wing root fairings was a real pain now that the wings are installed, I managed to get one wing done but the second wing I could only install the rubber around the top and bottom nose skins, the rear section was glued into place after much frustration. It looks the same and has stayed put so far.

2 horus flying yesterday in average conditions, hit a nice hole in the sky doing circuits, +1.9 and -1.3G was the worst of it, but it was still a real blast.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.