I placed the glass very carefully in position and then wetted it out. Plans say wet the leg then put on the dry glass. My method allowed me to get the first one just right and I made it a little wet to ensure no dry areas. This also allows the next layer to wet out partly from the bottom.
This worked very well and I allowed a bit of time before the next ply which helped with positioning the glass. Same for the next two.
It was about a 7 hour job with the room at 27C. I peel plyed the last layer per plans.