KitLog pro

Powered By Kitlog Pro v2.0

Daves Web Site
' style=
Date:  8-26-2017
Number of Hours:  2.00
Manual Reference:  no ref
Brief Description:  Fuel System Getting those ducks in a row 4

Pic 1 shows a bit more work has been done. After the base click bonds were in I made some floating nut plates up and inbedded them in the sump wall. Again using a stick on the assembly and release tape. I then went ahead and did another click bond thing for the adel clamp what will hold the post pump filter. A bit of time went into pic 1.

Pics 2 and 3 show you the assembly in place. I have gone to enormous trouble with a lot of thought and time to make this work. It just didn't seem to be possible to make these items fit in here at first. I had to source fittings I didn't even know exisited. Now its done, it looks easy, simple and why was it a problem in the first place?

Buy me a coffee sometime and I will explain.
' style=

Click bonds and nut plates

Click bonds and nut plates

' style=

In place from above

In place from above

' style=

In place, the ground view

In place, the ground view

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.