KitLog pro

Powered By Kitlog Pro v2.0

Daves Web Site
' style=
Date:  8-25-2017
Number of Hours:  3.00
Manual Reference:  no ref
Brief Description:  Fuel System Getting those ducks in a row 3

Time to start securing the pumps to the sump wall area. The on/off vlave is connected to the pumps now so its just those that need securing.

I placed the bottom click bonds and with plenty of release tape made sure they were in the right place by using a stick to foce the pumps right up against the sump wall while the epoxy set. Pic 1.

This worked really well. After cure I did the clean up and then some BID disks carefully over the click bonds and the result you see in pic 3.
' style=

Using a 'stick clamp'

Using a 'stick clamp'

' style=

BID foil circles

BID foil circles

' style=

Clickbonds in place

Clickbonds in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.