KitLog pro

Powered By Kitlog Pro v2.0

Daves Web Site
' style=
Date:  5-9-2017
Number of Hours:  6.00
Manual Reference:  no ref
Brief Description:  Common Sump 3 Front wall

Today was prepping the front sump wall area and finally floxing and taping it in position. I started about 3pm and finished at 9 for this simple little job.

I can tell you it is quite parallel and that all the surfaces nearby were well dulled and sanded. The piece was set up several times with a carpenters square, I marked more lines for the 2 ply BID tapes.

I cleaned and then wetted the areas with pure epoxy and then added thick flox everywhere. Once the front piece was in position I rechecked the angles and added plenty of flox to the edges, especially on the inside.

Next up were the 2 ply tapes and finally peel ply. Pic 3 is a day later with the peel ply off, cleaning up the edges and a bit of sanding.
' style=

Floxed and taped sump wall

Floxed and taped sump wall

' style=

Sump wall again

Sump wall again

' style=

Cleaned up

Cleaned up

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.