This was over several days and all with the heater on now the weather is cooler. I continue to have around 25C for my 'important part' fiberglass working temperature.
Pic 1 and I've done a pretty wet inside layup, pic 2 are outside layups a day later and pic 3 I've trimmed everything a day after that.
I drilled through the hard points as I really wasn't sure how to treat the inside holes. Now its done I can see that I need to dremmel down to nearly the hardpoint on the inside so that the fittings can seat. I'll be putting a lot of flox around too and should get an excellent seal.