Date:  12-20-2014
Number of Hours:  10.00
Manual Reference:  Roncz B sheet
Brief Description:  Trial Elevator setup 2

Today I finally sorted out those countersunk rivets mentioned earlier. Worth the trouble I'm sure.

The rest of the day was a series of more trial setups for the elevator that didn't work out. Then I had an idea. I have the angle jig that came with the cores... what if I made three more of these the same size and used them to hold the canard and elevator? This way I could check the elevator angles the entire length of the canard.

A couple of hours later I was back to doing the trial sertups and now it was easier to see when I had it all wrong. This thing was like trying to juggle jelly.

I gave up on the stick over the top for a temporary fitting and went to stuffing it down the side of the hinges to jam them in place. I had several goes without even using glue to see if I could get the elevator in range.
' style=

The correct rivet in place

The correct rivet in place

' style=

Angle check

Angle check

' style=

Three more new jigs required

Three more new jigs required